Attachment_0009_OCCM_CDRL_List.pdf

PDF 200 KB Posted

Attached to
Cargo and Tanker Vessels
Solicitation number
W56HZV15R0069
Issued by

About this file

ATTACHMENT 0009-OCCM CDRLS

View the file

Other files

File Type Posted
W56HZV-15-R-0069-0007.pdf PDF
W56HZV15R0069-0006.pdf PDF
Copy_of_QA's_after_RFP_release_(21_Dec_2015).xlsx XLSX spreadsheet
Exhibit_A_(Updated_2_Dec_2015).pdf PDF
Attachment_0021_PRICING_WORKSHEET_(Updated_1_Dec_2015).xlsx XLSX spreadsheet
Attachment_0023 _Past_Performance_Relevancy_Matrix_(Updated_10_Dec_2015).xls XLS spreadsheet
W56HZV15R0069-0005.pdf PDF
Copy_of_QA's_after_RFP_release_(24_Nov_2015).xlsx XLSX spreadsheet
Exhibit_B_-_OCCM_Requirement_(19_Nov_2015).pdf PDF
Exhibit_A_(23_Nov_2015).pdf PDF
Attachment_0031_Wage_Determination-WD-05-2115(REV.-16).docx DOCX document
Attachment_0022_-_Technical_Data_Package_(TDP)_and_Software_Rights_(19_Nov_2015).xlsx XLSX spreadsheet
Attachment_0021_PRICING_WORKSHEET_(Updated_19_Nov_2015).xlsx XLSX spreadsheet
Attachment_0001_LCU_SLEP_Repower_(19_Nov_2015).docx DOCX document
W56HZV15R0069-0004.pdf PDF
Copy_of_QA's_after_RFP_release_(19_Nov_2015).xlsx XLSX spreadsheet
Attachment_0021_-_PRICING_WORKSHEET_(Revision_1).xlsx XLSX spreadsheet
W56HZV15R0069-0003.pdf PDF
Attachment_0029_-_Wage_Determination_WD_05-2473_(Rev.-18).pdf PDF
Attachment_0030_-_Wage_Determination_WD_05-2543_(Rev._-18).pdf PDF
W56HZV15R0069-0002.pdf PDF
Potential_Subcontractors_(20_Oct_2015).pdf PDF
Attachment_0028 _Statement_of_equivalent_rates_for_federal_hires_(Updated_1_Oct_2015).pdf PDF
Attachment_0027_-_MA_Eligibility_Requirements_(Updated_1_Oct_2015).pdf PDF
Exhibit_A_(Updated_1_Oct_2015_).pdf PDF
W56HZV15R0069-0001.pdf PDF
Potential-Subcontractors.pdf PDF
Instructions_for_Potential_Subcontractors.pdf PDF
Exhibit_B_-_OCCM_Requirement.pdf PDF
Exhibit_A.pdf PDF
CUI-Instructions.pdf PDF
Attachment_0028_Statement_of_equivalent_rates_for_federal_hires_(1)_(002).pdf PDF
Attachment_0027_-_MA_Eligibility_Requirements.pdf PDF
Attachment_0026_-_Small_Business_Participation_Workbook_Instructions.docx DOCX document
Attachment_0025_-_Small_Business_Participation_Workbook.xlsx XLSX spreadsheet
Attachment_0024_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_0023_-__Past_Performance_Relevancy_Matrix.xls XLS spreadsheet
Attachment_0022_-_Technical_Data_Package_(TDP)_and_Software_Rights.xlsx XLSX spreadsheet
Attachment_0021_-_Pricing_Worksheet.xlsx XLSX spreadsheet
Attachment_0020_-_Technical_Maturity_Rubric.pdf PDF
Attachment_0019_Transaction_Format.pdf PDF
Attachment_0018_Logistics_Product_Data.pdf PDF
Attachment_0017_Equipment_Publications_Defects.pdf PDF
Attachment_0016_General_Publication_Requirement.pdf PDF
Attachment_0014_Table_A-XVIII_Lubrication_Orders_Matrix.pdf PDF
Attachment_0012_TABLE_A-II_TM_Requirements_Matrix.pdf PDF
Attachment_0011_DE_Style_Guide.pdf PDF
Attachment_0008_DA_Form_5587_Drydocking_Report.pdf PDF
Attachment_0007_LCU_2000_SGFP_List.pdf PDF
Attachment_0006_MTD_RCT_and_RTD_Values1.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0009

OCCM CDRLs

OCCM

Section OCCM Section Name

N o

C D

R Ls

C ertificatio n A

- 8

A

A ccep tan ce Te st R ep o rt - A

Failu re A n alysis an d C o rrective

A ctio n R ep o rt (FA C

A R

) (A

) 8

C ertificatio n /D ata R ep o rt - A

A ttach m en t 0

- D A

Fo rm

Q u ality In sp ectio n

Test, D em o n stratio n

, an d

Evalu atio n

R ep o rt A

- 8

1 Towing Services x

2 Arrival Tests and Inspections x

3 Drydocking x X

4 Load Line Certificate x x

5 Potable Water Tanks Cleaning and Painting x x

6 Tiller Arms Inspection and Repairs x X

7 Ballast Tanks Cleaning and Painting X

Aqueous Film Forming Form Storage Tank

Cleaning, Painting and Repairs X

Stern Tube Bearings/Strut Bearings

Replacements x

X

10 Propeller Shafts Mechanical Seals repairs x X

11 Rudder Repairs x

Sludge and Dirty Oil Tanks Cleaning and

Painting X

Engine Room Exhaust Ventilation Ducts

Repairs, Cleaning and Painting x X

14 Rudder Posts Packing Replacements X

15 Hull Zincs Replacements X

Sea Valves, Sea Strainers, and Sea Chests

Repairs x

Anchors, Chains and Chain Lockers

Cleaning and Painting x

18 Fuel Tranks Cleaning/Inspection x

19 Tank Level Indicating System Repairs X

Shaft Alignment and Bearnings Wear

Inspection X

OCCM

Section OCCM Section Name

N o

C D

R Ls

C ertificatio n A

- 8

A

A ccep tan ce Te st R ep o rt - A

Failu re A n alysis an d C o rrective

A ctio n R ep o rt (FA C

A R

) (A

) 8

C ertificatio n /D ata R ep o rt - A

A ttach m en t 0

- D A

Q u ality In sp ectio n

Test, D em o n stratio n

, an d

Evalu o rt A

- 8

21 STEERING SYSTEM REPAIRS x

22 BOW THRUSTER REPAIRS x

23 SEWAGE TREATMENT SYSTEM SERVICING x

HULL CLEANING AND PAINTING

(UNDERWATER AREAS AND EXTERNAL

HULL) x

HULL CLEANING AND PAINTING (MAIN

DECK AND ABOVE, EXTERNAL AREAS) X

WATERTIGHT DOORS, HATCHES, SCUTTLES

AND AMMO BOXES REPAIRS x

27 FIRE SUPPRESSION SYSTEM SERVICING x x

28 COMPRESSED AIR SYSTEM SERVICING x

MAIN AND EMERGENCY SWITCHBOARD

METERS CALIBRATION X

Boat Davit INSPECTION, REPAIRS AND

CERTIFICATION x X

BOW RAMP REPAIRS AND RAMP DOG

REPLACEMENTS x

EMERGENCY GENERATOR COMPARTMENT

AND FOCSLE’S CLEANING AND PAINTING X

OCCM

Section OCCM Section Name

N o

C D

R Ls

C ertificatio n A

- 8

A

A ccep tan ce Te st R ep o rt - A

Failu re A n alysis an d C o rrective

A ctio n R ep o rt (FA C

A R

) (A

) 8

C ertificatio n /D ata R ep o rt - A

A ttach m en t 0

- D A

Q u ality In sp ectio n

Test, D em o n stratio n

, an d

Evalu o rt A

- 8

ENGINE ROOM, TUNNEL, STEERING GEAR

ROOM, AND BOW THRUSTER ROOM BILGE

CLEANING AND PAINTING X

ENGINE ROOM, TUNNEL, STEERING GEAR

COMPARTMENT AND BOW THRUSTER

ROOM BULKHEAD, OVERHEAD AND

MACHINERY SURFACES CLEANING AND

PAINTING X

WORK COMPLETION TESTS AND

REQUIREMENTS x x

36 ULTRASONIC TESTING ( CPFF) x

37 WELDING (CPFF) X

PLATE RENEWAL AND STRUCTURAL

REPAIRS (CPFF) X

39 BALLAST TANKS ZINCS RENEWAL (CPFF) X

40 DECKHOUSE WINDOW REPAIRS (CPFF) X

Bilge/Ballast and Firemain Piping Systems

Replacements X

STERN ANCHOR WINCH ASSEMBLY

REPAIRS x x

PROPELLER SHAFTS REMOVAL,

EXAMINATION, REPAIRS AND

REINSTALLATIONS (STAINLESS STEEL OR

AQUALOY 22 SHAFTS) x

File details come from the government source that posted it. Updated .