Attachment_0020_-_Technical_Maturity_Rubric.pdf

PDF 178 KB Posted

Attached to
Cargo and Tanker Vessels
Solicitation number
W56HZV15R0069
Issued by

About this file

ATTACHMENT 0020-TECHNICAL MATURITY RUBRIC

View the file

Other files

File Type Posted
W56HZV-15-R-0069-0007.pdf PDF
W56HZV15R0069-0006.pdf PDF
Copy_of_QA's_after_RFP_release_(21_Dec_2015).xlsx XLSX spreadsheet
Exhibit_A_(Updated_2_Dec_2015).pdf PDF
Attachment_0021_PRICING_WORKSHEET_(Updated_1_Dec_2015).xlsx XLSX spreadsheet
Attachment_0023 _Past_Performance_Relevancy_Matrix_(Updated_10_Dec_2015).xls XLS spreadsheet
W56HZV15R0069-0005.pdf PDF
Copy_of_QA's_after_RFP_release_(24_Nov_2015).xlsx XLSX spreadsheet
Exhibit_B_-_OCCM_Requirement_(19_Nov_2015).pdf PDF
Exhibit_A_(23_Nov_2015).pdf PDF
Attachment_0031_Wage_Determination-WD-05-2115(REV.-16).docx DOCX document
Attachment_0022_-_Technical_Data_Package_(TDP)_and_Software_Rights_(19_Nov_2015).xlsx XLSX spreadsheet
Attachment_0021_PRICING_WORKSHEET_(Updated_19_Nov_2015).xlsx XLSX spreadsheet
Attachment_0001_LCU_SLEP_Repower_(19_Nov_2015).docx DOCX document
W56HZV15R0069-0004.pdf PDF
Copy_of_QA's_after_RFP_release_(19_Nov_2015).xlsx XLSX spreadsheet
Attachment_0021_-_PRICING_WORKSHEET_(Revision_1).xlsx XLSX spreadsheet
W56HZV15R0069-0003.pdf PDF
Attachment_0029_-_Wage_Determination_WD_05-2473_(Rev.-18).pdf PDF
Attachment_0030_-_Wage_Determination_WD_05-2543_(Rev._-18).pdf PDF
W56HZV15R0069-0002.pdf PDF
Potential_Subcontractors_(20_Oct_2015).pdf PDF
Attachment_0028 _Statement_of_equivalent_rates_for_federal_hires_(Updated_1_Oct_2015).pdf PDF
Attachment_0027_-_MA_Eligibility_Requirements_(Updated_1_Oct_2015).pdf PDF
Exhibit_A_(Updated_1_Oct_2015_).pdf PDF
W56HZV15R0069-0001.pdf PDF
Potential-Subcontractors.pdf PDF
Instructions_for_Potential_Subcontractors.pdf PDF
Exhibit_B_-_OCCM_Requirement.pdf PDF
Exhibit_A.pdf PDF
CUI-Instructions.pdf PDF
Attachment_0028_Statement_of_equivalent_rates_for_federal_hires_(1)_(002).pdf PDF
Attachment_0027_-_MA_Eligibility_Requirements.pdf PDF
Attachment_0026_-_Small_Business_Participation_Workbook_Instructions.docx DOCX document
Attachment_0025_-_Small_Business_Participation_Workbook.xlsx XLSX spreadsheet
Attachment_0024_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_0023_-__Past_Performance_Relevancy_Matrix.xls XLS spreadsheet
Attachment_0022_-_Technical_Data_Package_(TDP)_and_Software_Rights.xlsx XLSX spreadsheet
Attachment_0021_-_Pricing_Worksheet.xlsx XLSX spreadsheet
Attachment_0019_Transaction_Format.pdf PDF
Attachment_0018_Logistics_Product_Data.pdf PDF
Attachment_0017_Equipment_Publications_Defects.pdf PDF
Attachment_0016_General_Publication_Requirement.pdf PDF
Attachment_0014_Table_A-XVIII_Lubrication_Orders_Matrix.pdf PDF
Attachment_0012_TABLE_A-II_TM_Requirements_Matrix.pdf PDF
Attachment_0011_DE_Style_Guide.pdf PDF
Attachment_0009_OCCM_CDRL_List.pdf PDF
Attachment_0008_DA_Form_5587_Drydocking_Report.pdf PDF
Attachment_0007_LCU_2000_SGFP_List.pdf PDF
Attachment_0006_MTD_RCT_and_RTD_Values1.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0020

Technical Maturity Rubric

Levels Description Met/Not Met

Substantiating

Data

1 Requirements Analysis

Requirements decomposition completed

Functional baseline completed for repower equipment

Derived requirement development for major mechanical systems (engines, etc.) completed

Interfaces assessment completed

2 Preliminary Design Analysis

Allocated Baseline completed

Major component Analysis / Selection completed

- Engines

- Generators

- Reduction Gears

3 Sub-System Integration

Integration component requirements established

- Keel cooler sizing

- Exhaust sizing

- Air intake requirements

- Electrical switchgear

Structural requirements to support major equipment identified

Plan established to complete air intake system design

Plan established to complete propeller design

4 Sub-System Design

Integration component selection complete

- Keel coolers selected

- Exhaust material, insulation, support identified

Specific plan for analysis and optimization of air intake system design eliminate water intrusion / ensure proper airflow

Specific plan for analysis and optimization of propeller design

LCU 2000 SLEP

File details come from the government source that posted it. Updated .