Attachment_0021_-_Pricing_Worksheet.xlsx
XLSX spreadsheet 45 KB Posted
- Attached to
- Cargo and Tanker Vessels
- Solicitation number
- W56HZV15R0069
About this file
ATTACHMENT 0021-PRICING WORKSHEET
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions The Offeror shall complete this spreadsheet by filling in ALL green cells in the "First Ordering Year", "Second Ordering Year" and the "CRDLs" tabs.
| The Total Evaluated Price will include the following adjustments: | |
| 1) | ECP - Calculated automatically in the "Summary" based on input from "First Ordering Year" and "Second Ordering Year" tabs. |
| Calculation detailed in "Summary" tab rows 21-30. | |
| 2) | Data Rights - Adjustment to be determined during the evaluation as identified in M.4.2.5 |
Summary
Summary of Offeror's Cost/Price Proposal
Year 1 Total $ 123.00
Year 2 Total 121.00
CDRLs 8.00
Total Contract Amount $ 252.00
ECP Adjustment per M.4.2.6 (see table below) $ (6,800,000.00)
Sub-Total Incl. ECP Adjustment $ (6,799,748.00)
Data Rights Adjustment per M.4.2.5
| Total Evaluated Cost/Price | $ (6,799,748.00) | ||
| Engineering Change Proposal (ECP) Modification Adjustment per M.4.2.6 | |||
| $ 45,450,000.00 | |||
| Proposed Price for Tiers to be used in ECP Adjustment Calculation | Adjustment to the Total Evaluated Price as outlined in RFP Section M.4.2.7.3 |
| Tier 1: | $ 180.00 | $0.00 |
| Tier 1+ 2 | $ 196.00 | $ 2,720,000.00 |
| Tier 1+2+3 | $ 212.00 | $ 4,760,000.00 |
| Tier 1+2+3+4 | $ 224.00 | $ 6,120,000.00 |
| Tier 1+2+3+4+5 | $ 228.00 | $ 6,800,000.00 |
| Total ECP Adjustment: | $ 6,800,000.00 |
First Ordering Year
| CLIN | Description | CLIN Contract Type | Work Task # | Quantity | EA/LO | Unit Price | Extended Price | CLIN Total Price |
| Tier 1 SLEP Repower Modification and OCCM | ||||||||
| 1001 | SLEP Repower Mod and Option ECPs | FFP | N/A | 2 | EA | $ 26.00 | ||
| SLEP Repower Modificaiton | $ 1.00 | $ 2.00 |
| Tier 2 ECPs | SLEP ECP NSWC-V-5213 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-6017 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7686 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7691 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| Tier 3 ECPs | SLEP ECP NSWC-V-7684 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-7688 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7689 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7693 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| Tier 4 ECPs | SLEP ECP NSWC-V-7687 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-7690 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7692 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
Tier 5 ECPs SLEP ECP TACV-9154 N/A 2 EA $ 1.00 $ 2.00
| 1002 | OCCM (Work Tasks 1-35) | FFP | 2 | LO | 70.00 | |||
| Towing Services | 1 | $ 1.00 | $ 2.00 | |||||
| Arrival Tests and Inspections | 2 | $ 1.00 | $ 2.00 | |||||
| Drydocking | 3 | $ 1.00 | $ 2.00 | |||||
| Load Line Certificate | 4 | $ 1.00 | $ 2.00 | |||||
| Potable Water Tanks Cleaning and Painting | 5 | $ 1.00 | $ 2.00 | |||||
| Tiller Arms Inspection and Repairs | 6 | $ 1.00 | $ 2.00 | |||||
| Ballast Tanks Cleaning and Painting | 7 | $ 1.00 | $ 2.00 | |||||
| AFFF Storage Tank Cleaning, Painting and Repairs | 8 | $ 1.00 | $ 2.00 | |||||
| Stern Tube Bearings/Strut Bearings Replacements | 9 | $ 1.00 | $ 2.00 | |||||
| Propeller Shafts Mechanical Seals Repairs | 10 | $ 1.00 | $ 2.00 | |||||
| Rudders Repairs | 11 | $ 1.00 | $ 2.00 | |||||
| Sludge and Dirty Oil Tanks Cleaning and Painting | 12 | $ 1.00 | $ 2.00 | |||||
| Engine Room Exhaust Ventilation Ducts Repairs, Cleaning and Painting | 13 | $ 1.00 | $ 2.00 | |||||
| Rudder Posts Packing Replacement | 14 | $ 1.00 | $ 2.00 | |||||
| Hull Zincs Replacements | 15 | $ 1.00 | $ 2.00 | |||||
| Sea Valves, Sea Strainers and Sea Chests Repairs | 16 | $ 1.00 | $ 2.00 | |||||
| Anchors, Chains and Chain Lockers Cleaning and Painting | 17 | $ 1.00 | $ 2.00 | |||||
| Fuel Tanks Cleaning/Inspection | 18 | $ 1.00 | $ 2.00 | |||||
| Tank Level Indicating System Repairs | 19 | $ 1.00 | $ 2.00 | |||||
| Shaft Alignment and Bearings Wear Inspection | 20 | $ 1.00 | $ 2.00 | |||||
| Steering System Repairs | 21 | $ 1.00 | $ 2.00 | |||||
| Bow Thruster Repairs | 22 | $ 1.00 | $ 2.00 | |||||
| Sewage Treatment System Servicing | 23 | $ 1.00 | $ 2.00 | |||||
| Hull Cleaning and Painting (Underwater Areas and External Hull) | 24 | $ 1.00 | $ 2.00 | |||||
| Hull Cleaning and Painting (Main Deck and Above, External Areas) | 25 | $ 1.00 | $ 2.00 | |||||
| Watertight Doors, Hatches and Scuttles Repairs | 26 | $ 1.00 | $ 2.00 | |||||
| Fire Suppression System Servicing | 27 | $ 1.00 | $ 2.00 | |||||
| Compressed Air System Servicing | 28 | $ 1.00 | $ 2.00 | |||||
| Main and Emergency Switchboard Meters Calibration | 29 | $ 1.00 | $ 2.00 | |||||
| Davit Inspection, Repairs and Certification | 30 | $ 1.00 | $ 2.00 | |||||
| Bow Ramp Repairs and Ramp Dog Replacements | 31 | $ 1.00 | $ 2.00 | |||||
| Emergency Generator Compartment and Focsle's Cleaning and Painting | 32 | $ 1.00 | $ 2.00 | |||||
| Engine Room, Tunnel, Steering Gear Room, and Bow Thruster Room Bilge Cleaning and Painting | 33 | $ 1.00 | $ 2.00 | |||||
| Engine Room, Tunnel, Steering Gear Room, and Bow Thruster Room Bulkhead, Overhead and Machinery Surfaces Cleaning and Painting | 34 | $ 1.00 | $ 2.00 | |||||
| Work Completion Tests and Requirements | 35 | $ 1.00 | $ 2.00 | |||||
| 1003 | OCCM Vessel 1 (Work Tasks 36-40) Cost Plus Fixed Fee | CPFF | 1 | LO | 5.00 | |||
| Ultrasonic Testing | 36 | $ 1.00 | $ 1.00 | |||||
| Welding | 37 | $ 1.00 | $ 1.00 | |||||
| Plate Renewal and Structural Repairs | 38 | $ 1.00 | $ 1.00 | |||||
| Ballast Tanks Zincs Renewal | 39 | $ 1.00 | $ 1.00 | |||||
| Deckhouse Window Repairs | 40 | $ 1.00 | $ 1.00 | |||||
| 1004 | OCCM Vessel 2 (Work Tasks 36-40) | CPFF | 1 | LO | 5.00 | |||
| Ultrasonic Testing | 36 | $ 1.00 | $ 1.00 | |||||
| Welding | 37 | $ 1.00 | $ 1.00 | |||||
| Plate Renewal and Structural Repairs | 38 | $ 1.00 | $ 1.00 | |||||
| Ballast Tanks Zincs Renewal | 39 | $ 1.00 | $ 1.00 | |||||
| Deckhouse Window Repairs | 40 | $ 1.00 | $ 1.00 | |||||
| 1005 | OCCM (Work Task 41) Ballast Tanks Piping Valves Replacements | FFP | 41 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 |
| 1006 | OCCM (Work Task 42) Stern Anchor Winch Assembly Repairs | FFP | 42 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 |
| 1007 | OCCM (Work Task 43) Propeller Shafts Removal, Examination, Repairs and Reinstallations | FFP | 43 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 |
| 1008 | OCCM (Work Task 7.8 through 7.9) | FFP | 2 | EA | $ 1.00 | $ 2.00 | 2.00 | |
| 1009 | Training | FFP | N/A | 1 | LO | $ 1.00 | $ 1.00 | 1.00 |
| 1010 | Logistics Fielding | FFP | N/A | 2 | LO | $ 1.00 | $ 2.00 | 2.00 |
| 1011 | Government Testing/Contractor Test Support | FFP | N/A | 1 | LO | 2.00 | ||
| Vessel 1 (C.14 and C.18) | $ 1.00 | $ 1.00 | ||||||
| Vessel 2 (C.14) | $ 1.00 | $ 1.00 | ||||||
| 1012 | Travel | CNF | N/A | 1 | LO | $ 1.00 | $ 1.00 | 1.00 |
| 1013 | Over and Above Vessel 1 | CPFF | N/A | 1 | LO | $ 1.00 | $ 1.00 | 1.00 |
| 1014 | Over and Above Vessel 2 | CPFF | N/A | 1 | LO | $ 1.00 | $ 1.00 | 1.00 |
| 1015 | MITD Engine Set | CPFF | N/A | 1 | EA | $ 1.00 | $ 1.00 | 1.00 |
Year 1 Proposed Total: $ 123.00
| Summary of Tier 1-5 Totals to be used in the ECP Adjustment | ||
| Tier 1 | SLEP Repower Modification (Found Within CLIN 1001) and OCCM (CLINS 1002-1008) | $ 90.00 |
| Tier 2 | ECPs Identified as Tier 2 Within CLIN 1001 | $ 8.00 |
| Tier 3 | ECPs Identified as Tier 3 Within CLIN 1001 | $ 8.00 |
| Tier 4 | ECPs Identified as Tier 4 Within CLIN 1001 | $ 6.00 |
| Tier 5 | ECPs Identified as Tier 5 Within CLIN 1001 | $ 2.00 |
Solicitation W56HZV-15-R-0069 Pricing Evaluation Worksheet Attachment XXXX
Second Ordering Year
| CLIN | Description | CLIN Contract Type | Work Task # | Quantity | EA/LO | Unit Price | Extended Price | CLIN Total Price |
| Tier 1 SLEP Repower Modification and OCCM | ||||||||
| 2001 | SLEP Repower Mod and Option ECPs | FFP | N/A | 2 | EA | $ 26.00 | ||
| SLEP Repower Modification | $ 1.00 | $ 2.00 |
| Tier 2 ECPs | SLEP ECP NSWC-V-5213 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-6017 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7686 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7691 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| Tier 3 ECPs | SLEP ECP NSWC-V-7684 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-7688 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7689 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7693 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| Tier 4 ECPs | SLEP ECP NSWC-V-7687 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
| SLEP ECP NSWC-V-7690 | N/A | 2 | EA | $ 1.00 | $ 2.00 | |
| SLEP ECP NSWC-V-7692 | N/A | 2 | EA | $ 1.00 | $ 2.00 |
Tier 5 ECPs SLEP ECP TACV-9154 N/A 2 EA $ 1.00 $ 2.00
| 2002 | OCCM (Work Tasks 1-35) | FFP | 2 | LO | 70.00 | |||
| Towing Services | 1 | $ 1.00 | $ 2.00 | |||||
| Arrival Tests and Inspections | 2 | $ 1.00 | $ 2.00 | |||||
| Drydocking | 3 | $ 1.00 | $ 2.00 | |||||
| Load Line Certificate | 4 | $ 1.00 | $ 2.00 | |||||
| Potable Water Tanks Cleaning and Painting | 5 | $ 1.00 | $ 2.00 | |||||
| Tiller Arms Inspection and Repairs | 6 | $ 1.00 | $ 2.00 | |||||
| Ballast Tanks Cleaning and Painting | 7 | $ 1.00 | $ 2.00 | |||||
| AFFF Storage Tank Cleaning, Painting and Repairs | 8 | $ 1.00 | $ 2.00 | |||||
| Stern Tube Bearings/Strut Bearings Replacements | 9 | $ 1.00 | $ 2.00 | |||||
| Propeller Shafts Mechanical Seals Repairs | 10 | $ 1.00 | $ 2.00 | |||||
| Rudders Repairs | 11 | $ 1.00 | $ 2.00 | |||||
| Sludge and Dirty Oil Tanks Cleaning and Painting | 12 | $ 1.00 | $ 2.00 | |||||
| Engine Room Exhaust Ventilation Ducts Repairs, Cleaning and Painting | 13 | $ 1.00 | $ 2.00 | |||||
| Rudder Posts Packing Replacement | 14 | $ 1.00 | $ 2.00 | |||||
| Hull Zincs Replacements | 15 | $ 1.00 | $ 2.00 | |||||
| Sea Valves, Sea Strainers and Sea Chests Repairs | 16 | $ 1.00 | $ 2.00 | |||||
| Anchors, Chains and Chain Lockers Cleaning and Painting | 17 | $ 1.00 | $ 2.00 | |||||
| Fuel Tanks Cleaning/Inspection | 18 | $ 1.00 | $ 2.00 | |||||
| Tank Level Indicating System Repairs | 19 | $ 1.00 | $ 2.00 | |||||
| Shaft Alignment and Bearings Wear Inspection | 20 | $ 1.00 | $ 2.00 | |||||
| Steering System Repairs | 21 | $ 1.00 | $ 2.00 | |||||
| Bow Thruster Repairs | 22 | $ 1.00 | $ 2.00 | |||||
| Sewage Treatment System Servicing | 23 | $ 1.00 | $ 2.00 | |||||
| Hull Cleaning and Painting (Underwater Areas and External Hull) | 24 | $ 1.00 | $ 2.00 | |||||
| Hull Cleaning and Painting (Main Deck and Above, External Areas) | 25 | $ 1.00 | $ 2.00 | |||||
| Watertight Doors, Hatches and Scuttles Repairs | 26 | $ 1.00 | $ 2.00 | |||||
| Fire Suppression System Servicing | 27 | $ 1.00 | $ 2.00 | |||||
| Compressed Air System Servicing | 28 | $ 1.00 | $ 2.00 | |||||
| Main and Emergency Switchboard Meters Calibration | 29 | $ 1.00 | $ 2.00 | |||||
| Davit Inspection, Repairs and Certification | 30 | $ 1.00 | $ 2.00 | |||||
| Bow Ramp Repairs and Ramp Dog Replacements | 31 | $ 1.00 | $ 2.00 | |||||
| Emergency Generator Compartment and Focsle's Cleaning and Painting | 32 | $ 1.00 | $ 2.00 | |||||
| Engine Room, Tunnel, Steering Gear Room, and Bow Thruster Room Bilge Cleaning and Painting | 33 | $ 1.00 | $ 2.00 | |||||
| Engine Room, Tunnel, Steering Gear Room, and Bow Thruster Room Bulkhead, Overhead and Machinery Surfaces Cleaning and Painting | 34 | $ 1.00 | $ 2.00 | |||||
| Work Completion Tests and Requirements | 35 | $ 1.00 | $ 2.00 | |||||
| 2003 | OCCM Vessel 1 (Work Tasks 36-40) Cost Plus Fixed Fee | CPFF | 1 | LO | 5.00 | |||
| Ultrasonic Testing | 36 | $ 1.00 | $ 1.00 | |||||
| Welding | 37 | $ 1.00 | $ 1.00 | |||||
| Plate Renewal and Structural Repairs | 38 | $ 1.00 | $ 1.00 | |||||
| Ballast Tanks Zincs Renewal | 39 | $ 1.00 | $ 1.00 | |||||
| Deckhouse Window Repairs | 40 | $ 1.00 | $ 1.00 | |||||
| 2004 | OCCM Vessel 2 (Work Tasks 36-40) | CPFF | 1 | LO | 5.00 | |||
| Ultrasonic Testing | 36 | $ 1.00 | $ 1.00 | |||||
| Welding | 37 | $ 1.00 | $ 1.00 | |||||
| Plate Renewal and Structural Repairs | 38 | $ 1.00 | $ 1.00 | |||||
| Ballast Tanks Zincs Renewal | 39 | $ 1.00 | $ 1.00 | |||||
| Deckhouse Window Repairs | 40 | $ 1.00 | $ 1.00 | |||||
| 2005 | OCCM (Work Task 41) Ballast Tanks Piping Valves Replacements | FFP | 41 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 |
| 2006 | OCCM (Work Task 42) Stern Anchor Winch Assembly Repairs | FFP | 42 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 |
| 2007 | OCCM (Work Task 43) Propeller Shafts Removal, Examination, Repairs and Reinstallations | FFP | 43 | 2 | EA | $ 1.00 | $ 2.00 | 2.00 |
| 2008 | OCCM (Work Task 7.8 through 7.9) | FFP | 2 | EA | $ 1.00 | $ 2.00 | 2.00 | |
| 2009 | Second Ordering Year - Logistics Fielding | FFP | N/A | 2 | LO | $ 1.00 | $ 2.00 | 2.00 |
| 2010 | Second Ordering Year - Contractor Testing Support | FFP | N/A | 2 | LO | $ 1.00 | $ 2.00 | 2.00 |
| 2011 | Second Ordering Year - Over and Above Vessel 1 | CPFF | N/A | 1 | LO | $ 1.00 | $ 1.00 | 1.00 |
| 2012 | Second Ordering Year - Over and Above Vessel 2 | CPFF | N/A | 1 | LO | $ 1.00 | $ 1.00 | 1.00 |
| 2013 | Second Ordering Year - MITD Engines | FFP | N/A | 1 | EA | $ 1.00 | $ 1.00 | 1.00 |
Year 2 Proposed Total: $ 121.00
| Tier 1-5 Totals to be used in the ECP Adjustment | ||
| Tier 1 | SLEP Repower Modification (Found Within CLIN 2001) and OCCM (CLINS 2002-2008) | $ 90.00 |
| Tier 2 | ECPs Identified as Tier 2 Within CLIN 2001 | $ 8.00 |
| Tier 3 | ECPs Identified as Tier 3 Within CLIN 2001 | $ 8.00 |
| Tier 4 | ECPs Identified as Tier 4 Within CLIN 2001 | $ 6.00 |
| Tier 5 | ECPs Identified as Tier 5 Within CLIN 2001 | $ 2.00 |
Solicitation W56HZV-15-R-0069 Pricing Evaluation Worksheet Attachment XXXX
CDRLs
| CLIN | Description | CLIN Contract Type | Quantity | EA/LO | Unit Price |
| 3001 | Contract Data Requirements List | ||||
| A001 | Condition Found Report (CFR) | 1 | LO | NSP | |
| A002 | Warranty Performance Report | 1 | LO | NSP | |
| A003 | Scientific and Technical Report | 1 | LO | NSP | |
| A004 | Corrosion Prevention and Control Plan | 1 | LO | NSP | |
| A005 | Certificate of Compliance | 1 | LO | NSP | |
| A006 | Technical Data Package (TDP - Repower) | FFP | 1 | LO | $ 1.00 |
| A007 | Acceptance Test Report (ATR) | 1 | LO | NSP | |
| A008 | Shipboeard Industrial Test Procedure | 1 | LO | NSP | |
| A009 | Conference Agenda | 1 | LO | NSP | |
| A010 | Record of Meeting Minutes | 1 | LO | NSP | |
| A011 | Integrated Program Management Report (IPMR) | 1 | LO | NSP | |
| A012 | Performance and Cost Report | 1 | LO | NSP | |
| A013 | Design Review Information Package (DRIP) | 1 | LO | NSP | |
| A014 | Contractor's Configuration Management Plan | 1 | LO | NSP | |
| A015 | Engineering Change Proposal (ECP) | 1 | LO | NSP | |
| A016 | Notice of Revision (NOR) | 1 | LO | NSP | |
| A017 | Engineering Release Record (ERR) | 1 | LO | NSP | |
| A018 | Physical Configuration Audit (PCA) Plan | 1 | LO | NSP | |
| A019 | System Safety Hazard Analysis Report (SSHA) | 1 | LO | NSP | |
| A020 | Safety Assessment Report (SAR) | 1 | LO | NSP | |
| A021 | Hazard Materials Management Program (HMMO) Report NAS 411 | 1 | LO | NSP | |
| A022 | Logistics Product Data | 1 | LO | NSP | |
| A023 | Maintenance Allocation Chart (MAC) | 1 | LO | NSP | |
| A024 | Level of Repair Analysis (LORA) | 1 | LO | NSP | |
| A025 | Unexercised Option Quantity - Newly Developed TMs | FFP | 1 | LO | $ 1.00 |
| A026 | Unexercised Option Quantity - Newly Developed TMs | FFP | 1 | LO | $ 1.00 |
| A027 | Unexercised Option Quantity - Change Package TMs | FFP | 1 | LO | $ 1.00 |
| A028 | Technical Manual Validation Plan | 1 | LO | NSP | |
| A029 | Validation Report | 1 | LO | NSP | |
| A030 | Supply | 1 | LO | NSP | |
| A031 | Technical Report-Study/Services | 1 | LO | NSP | |
| A032 | Provisioning Performance Schedule | 1 | LO | NSP | |
| A033 | Provisioning Parts List | 1 | LO | NSP | |
| A034 | Engineering Data For Provisioning (EDFP) | 1 | LO | NSP | |
| A035 | Logistics Product Data | 1 | LO | NSP | |
| A036 | Source Data | 1 | LO | NSP | |
| A037 | Training Materials | FFP | 1 | LO | $ 1.00 |
| A038 | Training Materials | FFP | 1 | LO | $ 1.00 |
| A039 | Commercial Off The Shelf (COTS) Manuals | 1 | LO | NSP | |
| A040 | Reserved | 1 | LO | NSP | |
| A041 | Inspection and Test Plan | 1 | LO | NSP | |
| A042 | Craft Acceptance Test Schedule | 1 | LO | NSP | |
| A043 | Qualification Test Report (QTR) | 1 | LO | NSP | |
| A044 | Test Change Proposal (TCP) | 1 | LO | NSP | |
| A045 | Logistics Product Data | 1 | LO | NSP | |
| A046 | Failure Analysis and Corrective Action Report (FACAR) | 1 | LO | NSP | |
| A047 | Product Quality Deficiency Report (PQRD) | 1 | LO | NSP | |
| A048 | Certification/Data Report | 1 | LO | NSP | |
| A049 | Quality Inspection Test, Demonstration and Evaluation Report | 1 | LO | NSP | |
| A050 | Unexercised Option Quantity - Certificate of Compliance | FFP | 1 | LO | $ 1.00 |
| A051 | Technical Data Package (TDP - SLEP ECP and Aggregate) | FFP | 1 | LO | $ 1.00 |
| A052 | Special Packaging Instructions | 1 | LO | NSP | |
| A053 | Packaging Test Report | 1 | LO | NSP | |
| A054 | Proposed Spare Parts List | 1 | LO | NSP | |
| 4001 | Contractor Manpower Reporting (CMR) | 1 | LO | NSP | |
| Total CDRLs | $ 8.00 |
Solicitation W56HZV-15-R-0069 Pricing Evaluation Worksheet Attachment XXXX
File details come from the government source that posted it. Updated .