W56HZV-23-R-L005.pdf
PDF 1 MB Posted
- Solicitation number
- W56HZV-23-R-L005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV-23-R-L005 Responses to Vendor Questions 2023-06-01.docx | DOCX document | |
| Exhibit A CDRL A005-A008.pdf | ||
| Attachment 0002 - Use of Existing Government-Furnished Property.xlsx | XLSX spreadsheet | |
| Exhibit A CDRL A001-A004.pdf | ||
| Exhibit A CDRL A009-A0012.pdf | ||
| Attachment 0004 - Performance Requirements Summary.docx | DOCX document | |
| Attachment 0005 - Deliverables Schedule.docx | DOCX document | |
| Attachment 0001 - Pricing Workbook W56HZV-23-R-L005 CMH MATOC- Locked.xlsx | XLSX spreadsheet | |
| Attachment 0003 - Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W56HZV23RL005 11-May-2023
b. TELEPHONE NUMBER
571-588-8788
8. OFFER DUE DATE/LOCAL TIME
04:30 PM 12 Jun 2023
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W56HZV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
KALLI BATES
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-DTA
6501 E ELEVEN MILE ROAD
DETROIT ARSENAL MI 48397-5000
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: (586) 282-1234 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$30,000,000
NAICS:
712110
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF89
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W56HZV23RL005
Section A - Solicitation/Contract Form
SECTION A
A.1 ITEM/DESCRIPTION OF REQUIREMENT
The U.S. Army Contracting Command – Detroit Arsenal (ACC-DTA) intends to award approximately five (5) Firm Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOCs), each with five ordering years, for a broad range of museum exhibit design projects to support the U.S.
Army Center of Military History (CMH) and Army Museum Enterprise (AME) System.
A.2 ELECTRONIC CONTRACTING
(a) All Army Contracting Command – Detroit Arsenal solicitations will be publicized on the System for Award Management website (https://www.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) RESERVED
(c) RESERVED
(d) RESERVED
(e) Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(f) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Government’s intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. Any questions regarding this RFP must be received by the Contract Specialist no later than 23 May 2023 12:00 p.m. Eastern Time. Responses to questions are not considered changes to the RFP as the only way the RFP can be modified is through an amendment that will be issued. No phone calls will be accepted for any reason. All questions shall be in writing. The Government will post all Questions and Answers (Q&As) to SAM.gov no later than 3:00 p.m. Eastern Time on 01 June 2023. The Government will notify potential offerors if an extension is needed to post the Q&As. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.3 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
A.4 ARMY CONTRACTING COMMAND – DETROIT ARSENAL (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
https://www.tacom.army.mil/ombudsperson. (Best viewed using Google Chrome or Microsoft Edge)
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Quality Control Plan
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
Data Deliverables as set forth in Contract Data Requirements List (CDRL) DD Form 1423, CDRL A001.
FOB: Destination
PSC CD: E1PB
NET AMT
1001 1 Job Labor Ordering Period Year 1
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
2001 1 Job Labor Ordering Period Year 2
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
3001 1 Job Labor Ordering Period Year 3
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
4001 1 Job Labor Ordering Period Year 4
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
5001 1 Job Labor Ordering Period Year 5
FFP
DO NOT INPUT PRICES IN THIS SECTION. ALL PRICING/RATES SHALL
BE SUBMITTED ON ATTACHMENT 0001, PRICING WORKBOOK.
There is no ordering year limit for the suite of contracts. The ordering period is subject to the contract suite maximum.
Service Contract Reporting
FFP
NSP: Not Separately Priced.
The contractor shall provide the information required by the Service Contract Reporting (SCR) in accordance with the Performance Work Statement (PWS) as detailed in Section C.
CDRLs A002-A012
FFP
NSP: Not Separately Priced.
Data Deliverables as set forth in CDRL DD Form 1423, CDRL A002-A012
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Performance Work Statement (PWS) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOCs) For Museum Exhibit Design
PART C.1
GENERAL INFORMATION
C-1 INTRODUCTION
This is a non-personnel services IDIQ MATOC to provide museum exhibit design services to museums in the US Army's Center of Military History Army Museum Enterprise (AME). The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees.
It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately. As this is an AME-wide initiative and an IDIQ MATOC, it is within the individual Task Orders where specific details will be provided for the work to be performed.
C-1.1 DESCRIPTION OF SERVICES
The contractor shall provide museum design services for museum exhibits in the Army Museum Enterprise (AME) utilizing artifacts, images, Audio Visual products, exhibit storylines and other information required to accomplish the task stated in the task orders. All exhibits shall be designed to meet Americans with Disabilities Act (ADA) and National Park Service (NPS) Conservation standards as shown in NPS Guidelines.
(http://www.nps.gov/hfc/products/cons/ex-con-guidelines.cfm). All work in the individual Task Orders, shall cover designs that will be installed in exhibit space on U.S. Government property, requiring coordination and compliance with various installation commands and related environmental and/or safety offices/departments. The site locations for performance will be identified in each Task Order. Work will include the design of exhibit fixtures, graphics, Audio Visual components and lighting. Work will also include tracking the estimated cost to fabricate and install the exhibits using a budget provided by the government. All requirements will be specified in the task order. AME staff will provide technical and curatorial assistance upon request for such items as historical background on artifacts, assistance with the production of graphics such as maps and conservation restrictions on historical artifacts.
C-1.2 BACKGROUND
The U.S. Army Center of Military History (CMH) Museums Directorate requires museum exhibit design services necessary for the production of museum exhibits in the Army Museum Enterprise (AME). The AME is comprised of 42 museums located in Alabama, Arizona, California, Colorado, Georgia, Hawaii, Illinois, Kansas, Kentucky, Louisiana, Missouri, New York, New Mexico, North Carolina, Oklahoma, Pennsylvania, South Carolina, Texas, Virginia, Washington, Germany and Korea. AME exhibits and maintains in excess of 569,000 individual artifacts ranging in size from lapel pins to main battle tanks and aircraft. Both the macro and micro artifacts are usually of high interest to the museum going public, and also serve as training references for military personnel, academicians and historians. The AME is mandated by Army Regulation 870-20 and supplemental conservation directive documents to preserve these historical artifacts in as close to original, services-related condition as possible.
C-1.3 OBJECTIVES
The objective of this contract is to provide for an IDIQ MATOC that will accommodate exhibit designs at museums in the AME as covered by the Task Order. The tasks required to complete this work are the following:
C-1.3.1 EXHIBIT DESIGN – FIXTURES:
Design of cases, pedestals, graphic displays, dioramas, plinths, brackets, mounts, audio components, video components, and multimedia kiosks.
C-1.3.2 EXHIBIT DESIGN – GRAPHICS:
Design of graphic panels, labels, kiosks, Photoshop and images provided by the museum and were needed scanning and editing of images.
C-1.3.3 EXHIBIT DESIGN – LIGHTING:
Design of room lighting, case lighting, and lighting for other exhibit components such as dioramas.
C-1.3.4 EXHIBIT DESIGN - PROJECT MANAGEMENT:
To include Quality Assurance Plan, schedule of deliverables, and status reports.
C-1.3.5 EXHIBIT DESIGN – DETAILER:
Prepare detailed construction drawings to be used in the fabrication of the exhibits.
C-1.3.6 EXHIBIT DESIGN: ESTIMATOR:
Track the design to assure so that it will keep to the fabrication and installation budget set by the AME.
C-1.4 SCOPE
The Contractor shall work closely with AME staff and facilities staff during the design process working to meet all tasks as defined in the PWS and specified in the task order using curatorial assistance provided by the AME and information from facilities staff, and following Americans with Disabilities Act (ADA) and National Park Service (NPS) Conservation standards as shown in NPS Guidelines
C-1.5 GENERAL INFORMATION
C-1.5.1 QUALITY CONTROL (QC):
The contractor shall develop and maintain an effective quality control plan (QCP) to ensure services are performed in accordance with (IAW) this PWS. The QCP must be delivered to the COR for acceptance no later than fifteen
(15) calendar days after award of contract. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control plan is the means by which the contractor complies with the requirement of the contract. At a minimum, the contractor shall develop quality control procedures that address the areas identified in Technical Exhibit 1, “Performance Requirements Summary.” (IAW CDRL A001), after the acceptance of the quality control plan, the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to its QC system.
C-1.5.2 QUALITY ASSURANCE:
The Government shall monitor and evaluate the Contractor's progress and performance under this contract IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure the Contractor has performed IAW the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
C-1.5.3 RECOGNIZED HOLIDAYS
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day
C-1.5.4 HOURS OF OPERATION:
This shall be specified in the contract Task Order.
C-1.5.5 PLACE OF PERFORMANCE:
This shall be specified in the contract Task Order.
C-1.5.6 SECURITY REQUIREMENTS
C-1.5.6.1 IWATCH (See Something, Say Something) Training.
The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 60 calendar days of contract award and within 60 calendar days of new employees commencing performance, with the results reported to the COR no later than 60 calendar days after contract award.
C-1.5.6.2 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
(a) The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (Federal Acquisition Regulation (FAR) clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
(b) For contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation IAW Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or
(3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the Federal Bureau of Investigation (FBI) fingerprint check and a successfully scheduled NACI at the Office of Personal Management.
(c) For contractors that do not require CAC, but require access to a DOD facility or installation: Contractor and all associated sub-contractor employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C; and Non-disclosure Statement. For OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.
C-1.5.6.3 OPERATIONS SECURITY (OPSEC) TRAINING
Operations Security (OPSEC) Plan.
Contractors shall follow TRADOC OPSEC policies and regulations. Per AR 530-1 Operations Security. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil.
C-1.5.7 SPECIAL QUALIFICATIONS:
Each of the contractor personnel performing exhibit design services are required to possess a valid Government issued photo Identification for entry onto installation. The contractor shall be prepared to provide information on personnel performing the work at the military installation.
C-1.5.8 POST AWARD CONFERENCE/PERIODIC PROGRESS MEETINGS:
The Contractor agrees to attend any online/video conference post award/ kick off meeting convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The PCO, Contracting Officers Representative (COR), and other Government personnel, meet twice a month via online/video meeting with the contractor to review the contractor's progress. At these meetings, the PCO will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
These meetings shall be at no additional cost to the government.
C-1.5.9 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
The (COR) will be identified by a separate letter. The COR monitors all aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitors the Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
C-1.5.10 IDENTIFICATION OF CONTRACTOR EMPLOYEES:
All contract personnel attending meetings or working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall accomplish this through the issuance of identification badges for all contract personnel providing work on-site. Badges must be worn to be visible at all times and must clearly identify the name of the individual, the Contractor’s company name, the date of the issuance and the date of expected expiration, which shall coincide with the anticipated Contract completion date. The Contractor must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that Contractor participation is appropriately disclosed. Personnel will be required to obtain required documentation for entry onto the base each day.
C-1.6 PERIOD OF PERFORMANCE:
This shall be specified in the contract Task Order
PART C.2
C-2.1 DEFINITIONS & ACRONYMS
CONTRACTOR- A supplier or vendor awarded a contract to provide specific supplies or service to the government.
The term used in this contract refers to the prime.
CONTRACTING OFFICER- A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
CONTRACTING OFFICER'S REPRESENTATIVE (COR)- An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
DEFECTIVE SERVICE- A service output that does not meet the standard of performance associated with the Performance Work Statement.
DELIVERABLE- Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
KEY PERSONNEL- Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
PHYSICAL SECURITY- Actions that prevent the loss or damage of Government property.
PWS-Performance Work Statement
QUALITY ASSURANCE- The government procedures to verify that services being performed by the contractor are performed according to acceptable standards.
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)- An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
QUALITY CONTROL- All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.
SUBCONTRACTOR - One that enters into a contract with a prime contractor.
WORKDAY-The number of hours per day the contractor provides services in accordance with the contract;
typically, between the hours of 0700-1600 IAW this or supplemental PWS statements.
WORK WEEK- Monday through Friday, unless specified otherwise.
PART C.3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
C-3.1 MATERIALS
The government shall provide an Exhibit Plan which contains photos and measurements of the historical objects, images to be used in the design and the first draft of text to be used in the exhibit. The government shall supply hard copies of images, negatives, slides, film, etc., and digital image files of the proper resolution no later than 4 calendar weeks after the kickoff meeting to the contractor. Final text shall be supplied to the contractor by the government no later than 60 calendar days after the start of the contract.
C-3.2 FACILITIES
The Government will provide access to the facility or location where the historical objects are stored for the designer to examine.
C-3.3 UTILITIES
PART C.4
TASK ORDER
C-4.1 TASK ORDER AWARD
C-4.1.1 CONTRACT TYPE:
The Task Orders will be Firm-Fixed-Price.
C-4.1.2 ISSUING AUTHORITY:
The Contracting Officer is designated as issuing authority for Task Orders placed against the MATOC contract.
C-4.1.3 TASK ORDER ISSUANCE:
Task Order awards will be issued on DD Form 1149 and will be sent via e-mail. Upon award of a Task Order, the contractor shall acknowledge receipt of the Task Order.
PART C.5
SPECIFIC TASKS
C-5.1 Basic Services:
The contractor shall provide services for:
C-5.1.1 PROJECT SCHEDULE:
The contractor shall within 21 days of the task order being awarded prepare and present to the COR a proposed project schedule completes with meeting and milestone dates for COR approval (IAW CDRL A002). The contractor shall, during the course of the project, track the project to see that the project remains on schedule. The contractor shall advise the COR of any real or foreseen difficulty in maintaining the schedule and the contractor shall submit proposals to the COR on any corrective action needed.
C-5.1.2 STATUS REPORT:
The contractor shall submit to the COR a status report with information relevant to the current status of the project on the 1st of each month for review and approval (IAW CDRL A003). Information is defined as drawings, files, and any other material relevant to the project at that given moment.
C-5.1.3 FIXTURE DESIGN
Fixture design focuses on the design and detailing of exhibit components such as cases, pedestals, graphic displays, plinths, brackets, mounts, audio components, video components, and multimedia kiosks. (IAW CDRL A004, A005, A006, A007, A008, A009, A011). All fixtures shall be designed to meet Americans with Disabilities Act (ADA) and National Park Service (NPS) Conservation standards as shown in NPS Guidelines.
(http://www.nps.gov/hfc/products/cons/ex-con-guidelines.cfm)
C-5.1.4 GRAPHIC DESIGN
Graphic design is the design and detailing of two and three-dimensional graphic components, which may be presented on graphic panels, labels, and kiosks. In addition, graphic design includes the scanning and manipulation of images for repair or effect using Photoshop. All graphic components shall be designed to meet ADA and NPS Conservation standards as shown in NPS Guidelines. (http://www.nps.gov/hfc/products/cons/ex-con-guidelines.cfm)
(IAW CDRL A005, A006, A007, A008, A010, A011)
C-5.1.5 LIGHTING DESIGN
Lighting design shall be for all lighting in the exhibit spaces. This covers track lighting, case lighting, wall lighting and any other lighting needs that are the result of the exhibit design (CDRL A011). All lighting design shall meet ADA and NPS Conservation standards as shown in NPS Guidelines. (http://www.nps.gov/hfc/products/cons/ex-con-guidelines.cfm).
C-5.1.6 AUDIO VISUAL DESIGN
This shall cover the specification of all audio-visual hardware, electronic systems, and high-definition television (HDTV) as required on a project and the design of Audio-Visual programs from standard 35mm slide systems to hi-tech interactive computer systems. All work must be done to meet ADA requirements.
C-5.1.7 Detailing Detailing shall be for the production of drawings showing construction methods, specifications such as hardware and materials, electrical plans, and any other information required for the construction of the exhibits. Drawings must be produced in AutoCAD or similar format. All materials specified shall meet NPS Conservation standards as shown in NPS Guidelines. (http://www.nps.gov/hfc/products/cons/ex-con-guidelines.cfm).
C-5.1.8 ESTIMATING
Using a budget provided by the AME the contractor shall analyze the exhibit design to make sure that it meets the budget AME has set for the following fabrication and installation project.
This tracking will allow alterations to be made to the design where needed to see that the design addresses the budget for the fabrication and installation of the exhibit. A final estimate sheet should be produced showing breakdown of material cost, labor cost for fabrication of exhibits, labor cost for installation of exhibits, travel costs, shipping cost and any other costs necessary due to the exhibit design.
C-5.1.9 50% CONCEPT DESIGN PACKAGE:
The contractor shall produce a drawing package (IAW CDRL A004). The drawing package should contain:
1. Cover Sheet that identifies the site, project location, date of submission, and table of contents.
2. Floor plans showing space planning to include exhibit sections, flow pattern, and locations of any vignettes (dioramas) with indication whether they are immersion or not. This drawing package should include two options.
Each option showing all of the required elements: exhibit sections, flow patterns and locations of dioramas.
3. Files sent to COR for review should be Portable Document Format (PDF) file format.
The Army’s review period for deliverables is fourteen (14) calendar days. Review comments will be transmitted to Contractor at the end of each review period for response.
C-5.1.10 100% CONCEPT DESIGN PACKAGE:
The contractor shall produce a drawing package IAW CDRL A005. Delivery date to be established in the proposed schedule produced by the contractor. The drawing package should that contains:
1. Cover Sheet that identifies the site, project location, date of submission, and table of contents.
2. Floor plan showing exhibit sections, locations of any vignettes (dioramas), and indication whether they are immersion or not.
3. Floor plan showing proposed floor treatments.
4. Sample elevations in full color. Minimum of two walls.
5. Graphic standards to include font types, sizes, colors and samples of object and section labels.
6. Files sent to COR for review should be PDF file format.
The Army’s review period for deliverables is fourteen (14) calendar days. Review comments will be transmitted to Contractor at the end of each review period for response.
C-5.1.11 35% DESIGN DEVELOPMENT PACKAGE:
The contractor shall produce a drawing package IAW CDRL A006. Delivery date to be established in the proposed schedule produced by the contractor. The drawing package should that contains:
1. Cover Sheet that identifies the site, project location, date of submission, and table of contents.
2. Floor plan showing final locations and sizes of exhibit sections. Drawings shall show preliminary case and graphic panel placements, plan views of vignettes, locations of multimedia components.
3. Floor plan showing proposed floor treatments. Floor treatments shall be shown in full color.
4. Updates on Sample elevations in full color. Elevations shall include cases and graphics. Cases shall include preliminary object placement. Graphics shall approximate the final product. Four Elevations minimum.
5. Refinement of Graphic standards to include font types, sizes, colors. Sheets shall include full color examples of at least one section panel, one object label and one subsection panel.
6. Files sent to COR for review should be PDF file format.
The Army’s review period for deliverables is fourteen (14) calendar days. Review comments will be transmitted to the contractor at the end of each review period for response.
C-5.1.12 100% DESIGN DEVELOPMENT PACKAGE:
The contractor shall produce a drawing package IAW CDRL A007. Delivery date to be established in the proposed schedule produced by the contractor. The drawing package should that contains:
1. Cover Sheet that identifies the site, project location, date of submission, and table of contents.
2. Floor plan showing locations and sizes of exhibit sections, cases, vignettes, layouts of vignettes and any other feature in the design.
3. Floor plan showing proposed floor treatments. Floor treatments shall be shown in full color.
4. Wall elevations in both black and white (50% of walls) and full color (minimum four).
5. Frontal Elevations of vignettes. This shall include both black and white and full color versions of the elevations.
Elevations shall include cases and graphics. Cases shall include preliminary object placement. Graphics shown in the full color elevations shall approximate the final product.
5. Refinement of Graphic standards to include font types, sizes, colors. Sheets shall include full color examples of at least two section panels, two object labels and two subsection panels.
6. Files sent to COR for review should be PDF file format.
The Army’s review period for deliverables is fourteen (14) calendar days. Review comments will be transmitted to the contractor at the end of each review period for response.
C-5.1.13 50% FINAL DESIGN PACKAGE:
The contractor shall produce a drawing package IAW CDRL A008. Delivery date to be established in the proposed schedule produced by the contractor. The drawing package should that contains:
1. Cover Sheet that identifies the site, project location, date of submission, and table of contents.
2. Floor plan showing locations and sizes of exhibit sections, cases, vignettes, layouts of vignettes, and any other feature in the design.
3. Floor plan showing floor treatments including model numbers, specifications, etc. Floor treatments shall be shown in full color.
4. Section drawings. This shall include floor plans of each section showing cases, graphics and all other exhibit components. Elevations of each wall (black and white) showing all graphics, cases, etc. Elevations of walls (full color) all vignettes and one wall per section.
5. Graphic standards package. Including all fonts at full size, color charts for each section (if different), full color examples of area text panel, main text panel, subject panel, rails and object labels.
6. Files sent to COR for review should be PDF file format.
The Army’s review period for deliverables is fourteen (14) calendar days. Review comments will be transmitted to the contractor at the end of each review period for response.
C-5.1.14 GRAPHIC PDF PROOF PACKAGE:
The contractor shall provide electronic files IAW CDRL A009 showing all graphics at either full size if possible or scaled to be used by the client to proof the graphics. Client will then either mark up the proofs with corrections or provide a list of corrections (Microsoft Word document). Delivery date to be established in the proposed schedule produced by the contractor.
The Army’s review period for deliverables is fourteen (14) calendar days. Review comments will be transmitted to the contractor at the end of each review period for response.
C-5.1.15 100% FINAL DESIGN PACKAGE:
The contractor is required to produce a drawing package IAW CDRL A010. Delivery date to be established in the proposed schedule produced by the contractor. that contains at a minimum:
1. Cover Sheet that identifies the site, project location, date of submission, and table of contents.
2. Index of drawings
3. Finish schedule
4. Scenic finish schedule
5. Floor plan showing locations and sizes of exhibit sections. Paint specifications for walls.
6. Floor plan showing floor treatments including model numbers, specifications, etc. Floor treatments shall be shown in full color.
7. Demolition plan showing walls, furniture, lighting, etc. to be removed.
8. Construction drawings for any new architectural features (walls, doors, etc.).
9. Section drawings. This shall include:
• Floor plans of each section showing cases, graphics and all other exhibit components including identifiers matching case, and graphic schedules.
• Elevations of each wall (black and white) showing all graphics, cases, etc. including identifiers matching case and graphic schedules.
• Elevations of walls (full color) this covers all vignettes and any wall with graphic murals including identifiers matching case and graphic schedules.
• Case layouts (black and white) including identifiers matching case and graphic schedules and showing object numbers.
• Case construction drawings.
• Any other necessary construction drawings.
10. Graphic standards package. Including all fonts at full size, color charts for each section (if different).
11. Reflected ceiling plan of the exhibit space showing locations of new lighting fixtures and hardware. Include a separate sheet for the lighting schedule.
12. An electrical plan of the exhibit space showing floor and wall outlets, ceiling junction boxes, power circuits, and power load for each exhibit fixture.
13. Locations and routing of all multimedia signal wiring.
14. Drawings reference package including:
• Graphic schedule
• Scenic finishes references
• Case schedule
• Artifact schedule
• Props/mannequins
• Lighting cut sheets
• AV hardware cut sheets
• Exhibit hardware reference sheets
15. Case layout package including:
• Drawing index
• Drawings of object mounts, blocks, book cradles, and any other support devices.
• Drawings of conservation forms
• Case layouts including locations of graphics in or mounted to cases.
• Drawings of vignettes/dioramas showing locations of objects, props, mannequins, etc.
16. Department of Public Works package including:
• Table of contents
• Existing floor plan
• Finishes schedule
• Demolition plan
• New lighting plan (does not include interior case lighting)
• Elevations of space including existing devices, new devices or movement of existing devices.
• New wall construction including construction details.
• New floor finishes (if done by Department of Public Works (DPW) determined during design phase)
17. Files sent to COR for review should be PDF file format.
The Army’s review period for deliverables is fourteen (14) calendar days. Review comments will be transmitted to the contractor at the end of each review period for response.
C-5.1.16 100% FINAL DESIGN PACKAGE COST ELEMENT
The contractor shall produce a cost estimate package (IAW CDRL A0011: Delivery date to be established in the proposed schedule produced by the contractor. The drawing package should contain:
1. Cover sheet identifying Project Designers name.
2. Cost estimate sheet showing breakdown of material cost, labor cost for fabrication of exhibits, labor cost for installation of exhibits, travel costs, shipping cost and any other costs necessary due to the exhibit design.
3. Number of labor hours for installation.
C-5.1.17 100% FINAL DIGITAL ART:
The contractor shall supply production ready files (IAW CDRL A012). Files sent to COR shall consist of electronic files needed for the fabrication and installation Delivery date to be established in the proposed schedule produced by the contractor. These shall include but not be limited to: Adobe Illustrator, InDesign, Computer Aided Design (CAD) drawings and PDFs of the before mentioned files for the fabrication and installation of the exhibit.
PART C.6
LABOR CATEGORIES REQUIRED AND MINIMUM QUALIFICATIONS
The following labor categories and minimum qualifications must be met by any personnel used by the Contractor to fulfill the requirements of work undertaken as part of this contract.
C-6.1 PROJECT MANAGER:
A minimum of five years’ experience as project manager managing all phases of museum exhibition or similar design projects. Must be skilled in working with professional, multi-disciplinary groups in a team environment. Skill and knowledge of software tools for scheduling, budgeting, and project management required.
C-6.2 SENIOR DESIGNER:
A minimum of five years’ experience as principal designer on major and minor museum or similar exhibitions of varying types, complexities, and sizes. Requires demonstrated ability to integrate client input and manage design teams, from initial concept to final design.
C-6.3 DESIGNER:
A minimum of three years’ experience working on major and minor exhibition projects. Requires demonstrated ability to integrate objects, images, and graphics in effective ways to communicate content.
C-6.4 SENIOR GRAPHICS DESIGNER:
A minimum of five years as a senior graphics designer on major and minor museum or similar exhibitions of varying types, complexities, and sizes. Requires demonstrated ability to work with other designers and clients to produce acceptable graphics packages.
C-6.5 GRAPHICS DESIGNER:
A minimum of three years’ experience working as a graphic designer on museum or similar exhibition projects.
Requires demonstrated ability to work with exhibition team members to produce acceptable graphic design packages that convey the exhibition themes, story lines and messages.
C-6.6 LIGHTING DESIGNER:
A minimum of five years’ experience developing lighting designs for building interiors and a minimum of three of those years developing museum or similar exhibition lighting and actually lighting museum or similar installations.
Ability to work with compatible electronic file formats required to produce construction documents.
C.6.7 DETAILER:
A minimum of five years’ experience developing detailed specifications and construction documents. Must be skilled in producing and integrating construction packages and schedules for large, complex projects. Must be capable of producing construction drawings in CAD formats. Proficiency at compatible electronic file formats required.
C-6.8 AUDIO-VISUAL SPECIALIST:
A minimum three years of experience in engineering, developing, and producing all audio-visual hardware, lighting, electronic systems, and high-definition television (HDTV) as required on a project. Technical capability of developing programs from standard 35mm slide systems to hi-tech interactive computer systems and digital images.
Work may include providing complete integrated design and engineering services; engineering and project management; production of shop drawings; and design and development of a centralized, user-friendly system to control built-in and modular Audio Visual (AV) hardware and software.
C-6.9 ESTIMATOR:
A minimum of five years’ experience working with exhibition designs to determine the overall project cost and material content. Must be able to produce detailed budget estimates reflecting labor and material unit costs.
PART C.7
SERVICE CONTRACTING REPORTING
Service contractor reporting of information is required in the SCR section in the System for Award Management (SAM) by 31 October, when a contract or task order has a total estimated value, including options, that exceeds $3 million; and is for services in the following service acquisition portfolio groups:
1) logistics management services,
2) equipment related services,
3) knowledge-based services, or
4) electronics and communications services.
TECHNICAL EXHIBIT 1
Performance Requirements Summary
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Please refer to Attachment 0004, Performance Requirements Summary.
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Please refer to Attachment 0005, Deliverables Schedule.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government 5001 Destination Government Destination Government 9000 N/A N/A N/A N/A 9001 N/A N/A N/A N/A
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
1001 N/A N/A N/A N/A
2001 N/A N/A N/A N/A
3001 N/A N/A N/A N/A
4001 N/A N/A N/A N/A
5001 N/A N/A N/A N/A
9000 N/A N/A N/A N/A
9001 N/A N/A N/A N/A
CLAUSES INCORPORATED BY REFERENCE
52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991
Section H - Special Contract Requirements
ORDERING FOR MULTIPLE AWARDS
H.1 Ordering For Multiple Awards
H.1.1 For Task Orders beyond the guaranteed contract minimum, the Government intends to issue awards competitively in accordance with (IAW) Fair Opportunity provision of FAR 16.505(b), unless an exception exists in FAR 16.505(b)(2)(i).
H.1.2 Generally, offerors will be allowed at least one week to respond to a request for a task order proposal.
H.1.3 Firm Fixed Price CLINs: Base contract(s) unit range prices for CLINs 1001-5001 constitute ceiling prices. As such, offerors are not allowed to propose higher prices than the ceiling prices. An offeror may propose lower than the ceiling prices during Fair Opportunity competition.
(a) Each awardee shall be provided a fair opportunity to be considered for each order in excess of $3,500.00, unless one of the exceptions outlined in subparagraph (b) is met. The basis for award will be identified in Task Order Proposal Request(s). The Contracting Officer, in making the decision in the award of any individual task order, shall consider price or cost under each order as one of the factors in the selection decision; however, the decision may result in an award to other than the lowest priced proposal. The Contracting Officer may also consider the following criteria when developing factors in the selection decision tailored for each individual order:
The Contracting Officer may use streamlined procedures, including oral presentations, when selecting an order awardee. The competition requirements of FAR Part 6 and the policies of FAR subpart 15.3 do not apply to the ordering process and the Contracting Officer is not required to use a formal evaluation plan or scoring of offers.
Additionally, if the order does not exceed the simplified acquisition threshold, the Contracting Officer need not contact each of the multiple awardees under the contract before selecting an order awardee if the Contracting Officer has information available to ensure that each awardee is provided a fair opportunity to be considered for each order.
A multiple contract awardee may at any time after contract award offer a lower price than that provided for in this contract, and the Contracting Officer may accept the contractor's lower cost/price in making decisions in the award of any order.
The Government intends to evaluate and award task orders without discussions. However, the Government reserves the right to conduct discussions if the Contracting Officer determines them to be necessary.
(b) Awardees need not be given a fair opportunity to be considered for a particular order in excess of $3,500.00 under this contract if the Contracting Officer determines that:
(1) The agency need for the supplies or services is of such urgency that providing a fair opportunity would result in unacceptable delays;
(2) Only one contractor is capable of providing the supplies or services required at the level of quality required because the supplies or services ordered are unique or highly specialized;
(3) The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order; or
(4) It is necessary to place an order to satisfy a minimum guarantee.