TECHNICAL_EXHIBIT_2.pdf

PDF 84 KB Posted

Attached to
Maintenance, inspection, repair of sprinkler systems
Solicitation number
W564KV-16-T_0080
Issued by

About this file

TECHNICAL EXHIBIT 2

View the file

Other files

File Type Posted
TECHNICAL_EXHIBIT_1.pdf PDF
ATTACHMENT_3.xlsx XLSX spreadsheet
ATTACHMENT_2.pdf PDF
CombinedSynopsisSolicitation.pdf PDF
ATTACHMENT_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 2 W564KV-16-T-0080

DELIVERABLES SCHEDULE

Deliverable Frequency # of Copies Medium/Format Submit To

Proof of recognition and certification as specialized firm

(PWS para 1.6.15)

Prior to Contract

Award, revised as required

1 Copy for the official file

Approved

Contractor Format

KO

Post-Award Meeting

Minutes from Post-

Award Meeting

(PWS para 1.6.16)

• NLT 7 calendar days after award

• NLT 7 calendar days after meeting

MS Word by

Email

COR and Contractor

Scheduled Meetings

• Minutes from the

Meeting (Govt.)

• Contractor Rebuttal

(PWS para 1.6.4)

TBD

• NLT 7 calendar days after meeting

• NLT 7 calendar days after receipt of minutes

1 Copy for the official file

By Email KO/COR and

Contractor

TBD

• NLT 7 calendar days after meeting

• NLT 7 calendar days after receipt of minutes

MS Word by

Email

COR and Contractor

Designation of

Project Manager and an Alternate

(PWS para 1.6.2

At Post Award

Conference

COR

Quality Control

Program

(PWS para 1.6.8)

NLT 10 calendar days after contract award

COR

Certificates of AT

Level I Training

(PWS para 1.6.12)

NLT 30 calendar days after contract award

Approved Form COR

Maintenance

Checklist and

Installation Report

(PWS para 5.2.2)

NLT 30 calendar days after completion of maintenance

COR

NOTE: Meeting minutes will be recorded by the Government, and distributed to the appropriate individuals

*following any meeting. Should there be disagreement with the minutes, the Contractor will provide a written notification identifying areas of non-concurrence for joint resolution.

File details come from the government source that posted it. Updated .