AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2022MAR03
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
TERESA A. SHEREDY
EMAIL: TERESA.A.SHEREDY.CIV@ARMY.MIL
W52P1J-22-R-0002
2022FEB14
X
X 2022MAR30 04:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 7
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: TERESA A. SHEREDY
Buyer Office Symbol/Telephone Number: CCRI-AB/(309)782-9999
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. The purpose of Amendment 0001 to Solicitation W52P1J-22-R-0002 is to extend the proposal submission deadline and to increase the page limitation for Volume 1, Technical Factor as described in Section L.
2. The proposal submission deadline is hereby extended from March 16, 2022 to March 30, 2022 at 4:00 pm central time.
3. In Section L under Proposal Submission, paragraph 7.a. (Page Limitations) is revised to replace 75 pages with 100 pages as follows.
From:
"Volume 1, Technical Factor, shall not exceed 75 pages and is limited to 20 oversized pages. Process Flow Diagrams are excluded from the page limitation. Government referenced documents shall denote document name and applicable page number(s)".
To:
"Volume 1, Technical Factor, shall not exceed 100 pages and is limited to 20 oversized pages. Process Flow Diagrams are excluded from the page limitation. Government referenced documents shall denote document name and applicable page number(s)".
4. Except as provided herein, all other terms and conditions of Solicitation W52P1J-22-R-0002 remain unchanged and in full force and effect.
*** END OF NARRATIVE A0002 ***
2 7
W52P1J-22-R-0002
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
For purposes of evaluation, the term Offeror is defined as the prime contractor. Proposal shall be submitted in accordance with this section. Offeror should thoroughly review Sections L and M prior to submitting a proposal. The following factors will be used to make the award determination of the LPTA proposal: Technical and Price.
A. PROPOSAL SUBMISSION
1. Offeror shall submit its proposal electronically through a file download link provided by Mark Stevens, Contract Specialist. Offeror shall contact Mark Stevens via e-mail at mark.d.stevens.civ@army.mil at least three business days prior to proposal submission to obtain the file download link. Please use "Request for Shotshell Proposal Link" in the subject line of the e-mail request. Proposals shall be transmitted to the Government through the Department of Defense (DoD) SAFE (Secure Access File Exchange) website.
2. A complete proposal shall include the following: Table of contents and separate volumes as indicated below:
Volume 1 - Technical Factor
Subfactor 1 - Design Verification Testing (DVT)
Subfactor 2 - Manufacturing Plan
Subfactor 3 - Quality System
Volume 2 - Price Factor
Volume 3 - Solicitation, Offer and Award Documents and Certifications/ Representations
3. Offeror shall submit its proposal in Adobe PDF (Portable Document Format) with the exception of the price matrix. Scanned PDF documents must be legible and shall have the ability to be viewed in Adobe Acrobat. The Offeror shall not lock or password protect any file. All files shall be virus-scanned, searchable, reproducible, accessible, and printable. Bookmarks must be utilized to easily locate sections of the proposal.
4. All volumes are due to the designated location by the date and time specified in Block 9 of the SF33. Failure to do so will result in the proposal being considered late and treated in accordance with FAR 15.208.
5. Each volume shall contain a table of contents and a matrix cross-referencing the proposal and the solicitation to allow the
Government to ascertain that all required sections of the proposal are fully addressed. Each volume stands on its own for evaluation purposes and must include all information necessary for evaluation (e.g., if it is to be evaluated in response to a Section L, Volume 1 requirement, the information must be included in the Offeror's Volume 1 proposal for it to be considered). Offerors are also required to provide all required information for each subfactor independently. When rating a subfactor, the Government will only evaluate the information provided in the section of the proposal addressing that particular subfactor. The Government will not consider information located in other sections or other volumes of the proposal in its evaluation of an individual factor or subfactor.
6. Pages shall be 8.5 inches x 11 inches; however, graphs, charts, tables and diagrams may use oversized paper of 8.5 inches x 14 inches or 11 inches x 17 inches. Any other page sizes are not permitted. Text size shall be no less than 12 point font; however, graphs, charts, tables, and diagrams may use text size no less than 8 point font. All pages shall be numbered, contain at least a one inch margin, and utilize Times New Roman font for paragraphs of text and either Times New Roman or Arial, except for Arial Narrow, for paragraph headings, graphs, charts, tables, spreadsheets, and diagrams. Pages printed on both sides, to include 8.5 x 14 and 11 x 17 will be counted as two pages.
7. Page Limitations: The Government will not read or evaluate pages exceeding the below prescribed page limitations. Excess pages will be removed from the proposals. Page limitations do not include table of contents, cross reference matrices, list of figures, list of acronyms, section bookmarks/dividers, or indices. No material may be incorporated in the proposal by reference, attachment, appendix, videotape, audiotape or other electronic media as a means to circumvent the page limitation. No electronic video or audio material will be reviewed or considered in the evaluation. Files shall not contain classified data. The use of hyperlinks in proposals is prohibited.
a. Volume 1, Technical Factor, shall not exceed 100 pages and is limited to 20 oversized pages. Process Flow Diagrams are excluded from the page limitation. Government referenced documents shall denote document name and applicable page number(s).
b. Volume 2, Price Factor, does not contain a page limitation.
8. Offeror is expected to provide sufficient detail in a clear and concise manner to completely and logically address each evaluation factor. The Government does not desire excess verbiage, unnecessary and elaborate brochures, lengthy, repetitious, disorganized presentations, or any information beyond that sufficient to present and complete an effective offer. Deficiencies, whether informational or technical, may be cause for elimination from the competitive range and/or rejection of an offer. Unsupported promises to comply with the contractual requirements are not sufficient. The proposal shall not merely reiterate the contractual specifications, but rather shall provide convincing documentary evidence of how contract requirements will be met.
9. The Government presumes the Offeror's proposal represents its best effort to respond to the solicitation. Submission shall
3 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
therefore be thorough and complete.
10. The successful proposal may be incorporated into the resultant contract in whole or in part.
B. VOLUME 1 - TECHNICAL FACTOR
Technical Factor: The Technical Factor consists of the following three (3) subfactors: Design Verification Testing (DVT), Manufacturing
Plan, and Quality System.
1. Subfactor 1 - Design Verification Testing (DVT): The Offeror shall provide information pertaining to 12 Gauge A011, A014, and A017 designs containing the following elements for review:
a. The Offeror shall provide supporting technical data detailing the A011, A014, and A017 designs intended for delivery to the U.S.
Government, which meets the following drawings:
i. Drawing 9390438 - Cartridge, 12 Gauge Shotshell, No. 00 Buckshot (A011); 12551623 - Combination of Adopted Items (COAI);
Cartridges, Loose Carton Pack - 12 Ga Shotshell, No. 00 Buckshot
ii. Drawing 9390439 - Cartridge, 12 Gauge Shotshell, No. 7-1/2 Shot (A014); 12551625 - COAI; Cartridges, Commercial Pack - 12 Ga
Shotshell, No. 7-1/2 Shot
iii. Drawing 9390440 - Cartridge, 12 Gauge Shotshell, No. 9 Shot (A017); 12551626 - COAI; Cartridges, Commercial Pack - 12 Ga
Shotshell, No. 9 Shot
b. For designs previously approved by the U.S. Government, the Offeror shall provide adequate evidence of supporting technical data and contractual documentation demonstrating the designs have received prior U.S. Government approval. For designs not previously approved by the U.S. Government, the Offeror shall provide adequate evidence of supporting technical data for their design, demonstrating compliance with all DVT requirements in accordance with (IAW) MIL-PRF-48656C.
2. Subfactor 2 - Manufacturing Plan: The Offeror shall provide a detailed Manufacturing Plan, which clearly demonstrates the Offeror's understanding and ability to produce 12 Gauge A011, A014, and A017 cartridges, as well as the capability to meet the requirements of the solicitation. The Manufacturing Plan shall include, but not necessarily be limited to the following:
a. Manufacturing Process:
i. The Offeror's Manufacturing Plan shall include an operational flow chart and a description of each operation and procedure that details how the 12 Gauge A011, A014, and A017 cartridges will be produced.
ii. The Offeror's Manufacturing Plan shall include information that demonstrates understanding of the drawing and specification requirements and technical expertise in the areas of manufacturing processes pertinent to the production of the 12 Gauge A011, A014, and A017 cartridges.
iii. The Offeror shall identify the key parameters that will require higher levels of quality and the process controls in place to ensure quality production of the 12 Gauge A011, A014, and A017 cartridges. The Offeror shall identify personnel required, with a description of abilities, assigned duties, and responsibilities.
iv. The Offeror shall provide detailed information on the materials that will be used during the manufacturing of the 12 Gauge
A011, A014, and A017 cartridges. The Offeror's information shall include specifications, material property certification information, and procurement, receipt, and storage plans.
v. The Offeror shall identify the production rate capabilities for all processes, tests, and inspections. In addition, the Offeror shall identify the key parameters and any potential problem areas or risks of the processes or its ability to meet the production rates. This description of the Offeror's Manufacturing Plan shall include potential rate limiting processes and how the Offeror proposes to mitigate these risks.
vi. The Offeror's Manufacturing Plan shall identify any process/part that is manufactured or procured from a subcontractor. All subcontracted work shall be discussed at the same level of detail as the in-house production. Parts which are procured from a sole source shall be identified as such.
b. Facilities and Equipment:
i. The Offeror shall provide detailed information on the proposed facilities and equipment along with the associated capabilities to manufacture and deliver product to the 12 Gauge A011, A014, and A017 cartridge requirements. Plans regarding initial equipment setup, day-to-day equipment upkeep, and tooling preventative maintenance shall be described, to include the determination of tooling replacement intervals and tracking/maintenance of replacement spare part inventory levels.
4 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ii. Detailed information shall be provided by the Offeror on the proposed facilities, gages, and equipment which will be utilized for the testing and verification of 12 Gauge A011, A014, and A017 cartridge production. This includes, but is not limited to, the facilities and equipment necessary to perform dimensional inspections, destructive or non-destructive testing, First Article Testing
(FAT), and Lot Acceptance Testing (LAT).
c. Organization:
i. The Offeror's Manufacturing Plan shall include information regarding any teaming structure, as well as organizational reporting lines and key positions within the organization to determine if the proposed structure demonstrates an effective approach to meeting solicitation requirements.
ii. Key technical positions, including certification and experience, shall be identified by the Offeror to demonstrate the
Offeror's ability to conform to solicitation requirements.
d. Configuration Management: The Offeror shall provide plans as contained in the proposed Configuration Management system including how configuration management requirements are flowed down, managed, and controlled through Offeror's organization and sub-vendors. The
Offeror shall detail what their formal process is to submit, review, and implement Configuration Management Actions (Engineering Change
Proposals, Requests for Variation, etc.).
e. Risk Management: The Offeror shall identify risk areas and provide a risk mitigation plan to manage all areas of risk to include production risk, delivery risk, sole source/single point failures, and performance risk.
3. Subfactor 3 - Quality System: The Offeror shall provide a description of the quality system including, but not limited to:
a. A description of the Offeror's Quality Manual, which demonstrates compliance with the requirements of ISO 9001:2015. If the
Offeror is not currently compliant with ISO 9001:2015 requirements, then a plan to become compliant shall be described.
b. Identification of its organizational structure, responsibilities, procedures, processes, methods for process control, and resources proposed for implementing quality management.
c. Applicable certifications such as those referenced in Section E - Higher Level Contract Quality Requirements, and other relevant certifications. The Offeror shall provide narratives on how they maintain and prepare for new and/or renewing such certifications.
d. A narrative describing the supplier evaluation & control program that demonstrates the ability to evaluate suppliers, and flow down contractual requirements and internal pertinent requirements to suppliers to control supplier product.
e. A thorough description of the material control system used for controlling vendor certification, raw materials, in-process material, and processes to address non-conforming material (i.e. identification, segregation, disposition and re-inspection of non-conforming material).
f. Evidence of the process control systems which will prevent non-conformances, reduce variation in processes, and demonstrate the ability to implement preventative action initiatives as part of the overall quality system. The Offeror shall also include a summary of any applicable ongoing process improvement activities and/or plans to remedy shortfalls in processes/equipment.
g. A narrative explaining calibration systems and associated maintenance procedures, which shall provide evidence that the calibration systems will yield inspection results that will be reliable, capable, and accurate on a continuous basis for all measured/tested characteristics.
h. A thorough description of the Offeror's proposed approach to be used in conducting failure analysis for product deficiencies or test failures, including how and when the findings will be transmitted back to the U.S. Government.
i. Details addressing how the Offeror maintains a continuous improvement process, to include how ideas are submitted, evaluated, and implemented.
j. A description and evidence which demonstrates implementation of a robust internal and external audit process, compliance to that process, and the results of a recent internal audit. Examples of evidence shall include, but are not limited to, audit schedules, previous corrective action requests and resolutions, customer satisfaction surveys, and all results, findings, and resolution of recent external audits performed within the last 18 months (or since quality management system registration, whichever is less). These examples shall include those audits performed by customers, independent auditors, and the government, and shall also indicate award or revocation of certification, as applicable.
C. VOLUME 2 - PRICE FACTOR
1. The Offeror must provide all required information IAW the following instructions.
5 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
2. The Offeror shall provide its proposed unit prices for the quantities in the Price Matrix - RFP Attachment 0001. All information relating to the proposed price including all required supporting documentation must be included in the section of the proposal designated as the Price Volume. Under no circumstances shall this information and documentation be included elsewhere in the proposal.
3. First Article Testing (FAT) prices are required for all five Ordering Periods. Offerors should not assume FAT will be waived and must provide FAT prices as requested. However, the Government reserves the right to require or waive FAT throughout the life of the contract. Offerors should price each FAT on the Price Matrix to reflect the total price of FATs required for the start of production for a new configuration or if a previous Ordering Period was not awarded. All FAT and unit prices proposed will be binding.
4. Offeror shall propose unit prices for all quantity ranges in each Ordering Period for each end item. Failure to do so may result in the offer being rejected. The end items are as follows: CTG, 12 Gauge No. 00 Buck, Military Pack, DODIC A011, NSN: 1305-01-232-8338;
CTG, 12 Gauge No. 7 1/2 Shot, Commercial Pack, DODIC A014, NSN: 1305-01-232-8339; CTG, 12 Gauge No. 9, Commercial Pack, DODIC A017, NSN: 1305-01-232-7415.
5. Certified Cost or Pricing Data/Data Other than Certified Cost or Pricing Data - The Government anticipates receiving competitive proposals and using competition to determine price reasonableness. However, the Government reserves the right to request certified cost or pricing data or data other than certified cost or pricing data necessary to determine price reasonableness if competition is not adequate for that purpose. Certified cost or pricing data and data other than certified cost or pricing data, if required, must be submitted IAW the instructions specified at FAR 15.403-5 and at DFARS 215.371-3.
6. Price Information: Price proposals are assumed to represent the Offeror's best efforts, as final proposal revisions may not be requested. Any additional information considered necessary to explain the proposed pricing shall be submitted at the time of proposal submission.
7. The five Ordering Periods for this requirement are as follows:
Ordering Period 1: Date of Contract Award to September 30, 2023
Ordering Period 2: October 1, 2023 to September 30, 2024
Ordering Period 3: October 1, 2024 to September 30, 2025
Ordering Period 4: October 1, 2025 to September 30, 2026
Ordering Period 5: October 1, 2026 to Five Years Date of Contract Award
8. Completing the Price Matrix - RFP Attachment 0001:
a. Offeror is required to fill in all cells highlighted in blue.
b. Offeror shall enter full name, Commercial and Government Entity (CAGE) code, and date in spaces provided on Total Evaluated Price
(TEP) Summary tab.
c. Offeror shall state all prices for this acquisition in current U.S. Dollars. Proposed unit prices are limited to four decimal places.
d. The Price Matrix - RFP Attachment 0001 is locked to prevent inadvertent changes. The Offeror shall not add additional information or make any changes to it; doing so may deem an Offeror non-compliant, and its proposal may not be considered for award.
e. Offeror shall enter proposed unit prices for all firm fixed price Contract Line Item Numbers or CLINs (CLIN X001 through CLIN
X003) and all associated FATs contained within the tabs of the Price Matrix - RFP Attachment 0001.
f. CLINs are grouped by end items.
g. Offeror shall not add any other information to the Price Matrix, nor shall Offeror make any changes to the Price Matrix - RFP
Attachment 0001.
h. Failure to complete all required blue cells on the Price Matrix - RFP Attachment 0001 may result in Offeror's proposal being rejected.
D. VOLUME 3 - SOLICITATION, OFFER AND AWARD DOCUMENTS AND CERTIFICATIONS/REPRESENTATIONS
Certifications and Representations - Each Offeror shall complete (fill-in and signatures) the solicitation sections indicated below. An authorized official of the firm shall sign the required documents.
Section A through K - Fill-ins as required.
Section A - Standard Form 33 (SF 33), Solicitation, Offer and Award and any Solicitation amendments.
Section K - Completed Representations, Certifications, and Other Statements of Offeror.
6 7
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
For Other Than Small Businesses ONLY. Small Business Subcontracting Plan shall be submitted with this volume in accordance with FAR
52.219-9.
*** END OF NARRATIVE L0001 ***