Rec Report Status Instructions

Attachment 0008 RFP W52P1J-22-R-0002 January 20, 2022RECEIVING REPORT STATUS - SHOTSHELL
DD-MMM-YY1
DATEDATEDATEDD250'sDD250'sDD250's
DODIC2DD250#3LOT #4QUANTITY5PRODUCED6PRESENTED7SIGNED8CLIN9MILSTRIP10SUPP ADD11COMMENTS12PRODUCEDPRESENTEDSIGNED
The contractor shall keep a running total throughout the month, then clear the file for the subsequent month. If more rows are needed for a DODIC(s), the contractor shall copy the formulas in Columns N, O, and P.

1. Enter date of report in DD-MMM-YY Format.

2. DODIC as indicated on contract. Do not change/edit this field

3. Enter DD250 number as indicated on WAWF.

4. Enter lot number using the 13 alpha-numberic format.

5. Enter the lot quantity.

6. Date Produced: The date in which the government lot has been packed out (canned, crated, palletized).

7. Date Presented: The date in which the lot has been preseneted to the Governmnet for signature..

8. Date Signed: The date in which the Government signs the DD250 and is in USG ownership.

9. CLIN: Enter the 6-character CLIN as it appears in the contract.

10. MILSTRIP: Enter the 14-character MILSTRIP as it appears in the contract.

11. SUPPADD: Enter the 6-character supplementary address as it appears in the contract.

12. Comments: Enter remarks with respects to the ammunition lot if needed.

13. The DD250 Produced, Presented and Signed columns are calculations. Do not enter anything into these cells.

A011

A011 TOTALTargetProducedPresentedSigned
000

A014

A014 TOTALTargetProducedPresentedSigned
000

A017

A017 TOTALTargetProducedPresentedSigned
000
TOTALTargetProducedPresentedSigned
0000

a

Weekly Production Instructions

Weekly Production Status Report - Shotshell
DD-MMM-YY1
Monthly Plan2Actual3Cum Variance4Monthly PlanActualCum Variance
22-Apr022-Oct0
The contractor shall keep a running total throughout the month, then clear the file for the subsequent month.

1. Enter date of report in DD-MMM-YY Format.

2. Monthly Plan: Enter the monthly plan for the entire Governmnet Fiscal Year (GFY) that is on contract.

3. Actuals: Enter the monthly actuals at the end of each month throughtout the GFY

4. Cum Variance: Automated field.

5. Monthly Plan: This field is a DODIC breakout for the current month of production. The total quantity should match the monthly plan above under the month of production, i.e., if Jan '21 monthly plan is 10M rounds, the monthly plan DODIC breakout should total 10M.

6. Current Target: The total quantity the contractor estimates will be DD250'd in the current month.

7. Carryover: Quantity produced from prior month(s) that did not get signed, but will get signed in the current month.

(If there is carryover product on hold for an extended period of time, only put the carryover on the chart for the month it is anticipated to be DD250’d)

8. Produced: The quantity that has been packed out (canned, crated, palletized) in the current month.

9. DD250 Presented: The quantity that has been preseneted to the Governmnet for signature, but not signed.

10. Total Accepted: The quantity that the Government has signed in the current month.

11. Remarks: Any remarks the contractor would like to enter for the Government's awareness.22-May022-Nov0
22-Jun022-Dec0
22-Jul023-Jan0
22-Aug023-Feb0
22-Sep023-Mar0
6-Mth Period 1006-Mth Period 200
MONTHLY PLAN5CURRENT TARGET6CARRYOVER7PRODUCED8DD250 PRESENTED9TOTAL
SIGNED10COMMENTS11
A011#00 Buckshot
A014#7 1/2 Shot
A017#9 Shot

Total

0 0 0 0 0 0