B08_-_APPENDIX_C___SUBMITTAL_REGISTER.pdf
PDF 70 KB Posted
- Attached to
- Replace the 225 Ton Chillers Building 68 Federal contract opportunity
- Solicitation number
- W52P1J-19-R-5017
About this file
Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19R5017-0003_Solicitation_Amendment.pdf | ||
| 19R5017-0002_Solicitation_Amendment.pdf | ||
| 19R5017-0001_Solicitation_Amendment.pdf | ||
| 19R5017_--_APPENDIX_B_PROJECT_DRAWINGS.PDF | ||
| B08_-_ATTACHMENT_0003____DAVIS_BACON_WAGE_DETERMINATION_06_SEPT_2019_(1).pdf | ||
| B08_-_ATTACHMENT_0001___BLDG_68_CHILLERS_SOW_DATED_27_JUNE_2019.pdf | ||
| B08_-_APPENDIX_A___PROJECT_SPECIFICATIONS.pdf | ||
| W52P1J19R5017.pdf | ||
| B08_-_APPENDIX_E___NON-HAZARDOUS_CONSTRUCTION_&_DEMOLITION_SUBMITTAL_FORM.pdf | ||
| B08_-_ATTACHMENT_0002___RIA_ACCESS_CONTROL_RECORDS_CHECK_REQUEST_FORM.pdf | ||
| B08_-_APPENDIX_D___ENGINEERING_GRAPHICS_STANDARD.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
RIA Building 68 Chiller Replacement
01 78 00 SD-10 Operation and Maintenance
Data
3.4 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3Final Approved Shop Drawings
01 91 00.15 10 SD-01 Preconstruction Submittals
1.7 GCommissioning Firm
SD-06 Test Reports
3.1.1.1 G DOInterim Construction Phase
Commissioning Plan
3.1.1.2 G DOFinal Construction Phase
Commissioning Plan
3.1.3.2 GPre-Functional Checklists
1.8Issues Log
3.2 GCommissioning Report
SD-07 Certificates
1.9 GCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.4 GSystems Manual
SD-11 Closeout Submittals
3.2 SFinal Commissioning Report
03 30 00 SD-02 Shop Drawings
1.6.1.1Formwork
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
03 30 00 1.6.1.2 GReinforcing Steel
SD-03 Product Data
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.1Concrete Curing Materials
2.6Reinforcement
SD-06 Test Reports
2.3.2Water
23 05 93 SD-01 Preconstruction Submittals
1.5.3.1 GTAB Firm
SD-03 Product Data
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.5.4 GTAB Execution
SD-06 Test Reports
1.5.5.1 GTAB Report
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.6.1.1 GTAB Pre-Field Engineering
Report
1.5.3.1 GTAB Firm
23 07 00 SD-02 Shop Drawings
3.2.2.4 GMICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
23 07 00 SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
23 64 10 SD-03 Product Data
GWater Chiller
3.1.3Posted Instructions
1.6.1Verification of Dimensions
3.5System Performance Tests
2.5.1Refrigerant
3.4.1Water Chiller - Field Acceptance
Test Plan
SD-06 Test Reports
3.4Field Acceptance Testing
3.4.2Water Chiller - Field Acceptance
Test Report
3.5System Performance Tests
SD-07 Certificates
3.1.8 GRefrigeration System
1.3.1Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.1 GWater Chiller - Installation
Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
23 64 10 SD-10 Operation and Maintenance
Data
GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.3 SIndoor Air Quality During
Construction
23 64 26 SD-03 Product Data
2.2.2.3 GGrooved Mechanical Connections
For Steel
SD-06 Test Reports
3.3.2 GPressure Tests Reports
25 08 10 SD-06 Test Reports
3.4 GPerformance Verification Test
3.5Endurance Testing
26 05 00.00 40 SD-01 Preconstruction Submittals
2.1Material, Equipment, and Fixture
Lists
SD-03 Product Data
2.1.1 GConduits and Raceways
2.1.2 GWire and Cable
3.2.1.4 GSplices and Connectors
2.1.3 GSwitches
SD-06 Test Reports
3.3 GContinuity Test
3.3 GInsulation Resistance Test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
26 05 00.00 40 SD-08 Manufacturer’s Instructions
3.1Manufacturer's Instructions
26 05 19.10 10 SD-03 Product Data
2.1.1 GWire and Cable
2.1.3.1 GConductors
3.1Cable Manufacturing Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it.