B08_-_APPENDIX_C___SUBMITTAL_REGISTER.pdf

PDF 70 KB Posted

Attached to
Replace the 225 Ton Chillers Building 68 Federal contract opportunity
Solicitation number
W52P1J-19-R-5017
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

Submittal Register

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES

RIA Building 68 Chiller Replacement

01 78 00 SD-10 Operation and Maintenance

Data

3.4 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3Final Approved Shop Drawings

01 91 00.15 10 SD-01 Preconstruction Submittals

1.7 GCommissioning Firm

SD-06 Test Reports

3.1.1.1 G DOInterim Construction Phase

Commissioning Plan

3.1.1.2 G DOFinal Construction Phase

Commissioning Plan

3.1.3.2 GPre-Functional Checklists

1.8Issues Log

3.2 GCommissioning Report

SD-07 Certificates

1.9 GCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.4 GSystems Manual

SD-11 Closeout Submittals

3.2 SFinal Commissioning Report

03 30 00 SD-02 Shop Drawings

1.6.1.1Formwork

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES

03 30 00 1.6.1.2 GReinforcing Steel

SD-03 Product Data

2.1Formwork Materials

2.3.1Cementitious Materials

2.4.1Concrete Curing Materials

2.6Reinforcement

SD-06 Test Reports

2.3.2Water

23 05 93 SD-01 Preconstruction Submittals

1.5.3.1 GTAB Firm

SD-03 Product Data

1.5.2 GTAB Procedures

1.5.2 GCalibration

1.5.4 GTAB Execution

SD-06 Test Reports

1.5.5.1 GTAB Report

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.6.1.1 GTAB Pre-Field Engineering

Report

1.5.3.1 GTAB Firm

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES

23 07 00 SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

23 64 10 SD-03 Product Data

GWater Chiller

3.1.3Posted Instructions

1.6.1Verification of Dimensions

3.5System Performance Tests

2.5.1Refrigerant

3.4.1Water Chiller - Field Acceptance

Test Plan

SD-06 Test Reports

3.4Field Acceptance Testing

3.4.2Water Chiller - Field Acceptance

Test Report

3.5System Performance Tests

SD-07 Certificates

3.1.8 GRefrigeration System

1.3.1Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.1 GWater Chiller - Installation

Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES

23 64 10 SD-10 Operation and Maintenance

Data

GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.3 SIndoor Air Quality During

Construction

23 64 26 SD-03 Product Data

2.2.2.3 GGrooved Mechanical Connections

For Steel

SD-06 Test Reports

3.3.2 GPressure Tests Reports

25 08 10 SD-06 Test Reports

3.4 GPerformance Verification Test

3.5Endurance Testing

26 05 00.00 40 SD-01 Preconstruction Submittals

2.1Material, Equipment, and Fixture

Lists

SD-03 Product Data

2.1.1 GConduits and Raceways

2.1.2 GWire and Cable

3.2.1.4 GSplices and Connectors

2.1.3 GSwitches

SD-06 Test Reports

3.3 GContinuity Test

3.3 GInsulation Resistance Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES

26 05 00.00 40 SD-08 Manufacturer’s Instructions

3.1Manufacturer's Instructions

26 05 19.10 10 SD-03 Product Data

2.1.1 GWire and Cable

2.1.3.1 GConductors

3.1Cable Manufacturing Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it.