AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Fixed Price with EPA - Actual Costs
0001 2022OCT27
W519TC
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
JACOB HARRISON
EMAIL: JACOB.T.HARRISON15.CIV@ARMY.MIL
W52P1J-19-R-0142
2022SEP30
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 46
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JACOB HARRISON
Buyer Office Symbol/Telephone Number: CCRI-AB/(309)782-7519
Type of Contract 1: Fixed Price with EPA - Established Prices
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
W52P1J-19-R-0142 / Amendment 0001
The purpose of this amendment is to incorporate the following changes to solicitation W52P1J-19-R-0142.
1. Revise the following narratives:
a) Narrative A0001, added paragraph 1(o).
b) Narrative B0001, revised paragraph (e)(2) to reflect the proper Range 2 maximum and Range 3 minimum.
c) Narrative C0001, revised TDP # and added dates of certification.
d) Narrative E0006, E0009, and E0010, revised to remove CXM-12.
e) Narrative F0001, revised paragraph (b).
f) Narrative H0001, revised paragraph (a).
g) Narrative L0001, revised Section L, paragraph A(2) and paragraph H to add submission requirements for the cover letter and master table of contents to Volume 7.
h) Narrative L0001, revised Section L, paragraph A(6) to add charts, tables, and spreadsheets and to also remove the following sentence, "Pages printed on both sides, to include 8.5 x 14 and 11 x 17, will be counted as two pages".
i) Narrative L0001, revised Section L, paragraph (A)(7) to add instruction to separately identify documents excluded from page count requirements.
j) Narrative L0001, added A(12) to align with the addition described in 1(a) above.
k) Narrative M0001, added A(6) to align with the addition described in 1(a) above.
2. Remove FAR clause 52.245-2, Government Property Installation Operation Services, from the solicitation.
3. Update Attachment 0008 - PWS 8 - Maintenance of Facilities, dated 20 October 2022.
4. Add Attachment 0033 - TDP Exceptions, dated 20 October 2022.
5. There is no change to the solicitation closing date as a result of this amendment.
6. All other terms and conditions of solicitation W52P1J-19-R-0142 remain in full force and effect.
*** END OF NARRATIVE A0002 ***
1. EXECUTIVE SUMMARY _________________
(a) Solicitation W52P1J-19-R-0142 is for the production of explosives and the operation and modernization of the Holston Army Ammunition
Plant (HSAAP). This solicitation will result in an award of a supply contract effective 01 January 2024, with the successful awardee assuming full operational control of the facility on 01 January 2025.
(b) General information regarding this solicitation can be found on the System for Award Management (SAM) website at www.sam.gov by searching solicitation number W52P1J-19-R-0142. The Government has also established a Virtual Library (VL) on the SAM site for Offerors to use in support of proposal development. Instructions for obtaining access to the VL are available on SAM. The data furnished by the
2 46
W52P1J-19-R-0142
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Government to Offerors under this solicitation may only be used in support of proposal development. No other use of this data is authorized.
(c) This acquisition is restricted to only those firms within the U.S. or its outlying areas.
(d) A SECRET Facility Security Clearance is required of the operating contractor of HSAAP due to the criteria identified in Attachment
0019, DD254 - Contract Security Classification Specification. A SECRET Facility Security Clearance is required prior to contract award.
Reference Narrative C0008, Facility Security Clearance Requirement, for additional details.
(e) Specifications and drawings in the Technical Data Packages (TDPs) are Distribution D and Export Controlled.
(f) Contractors must have an active registration in SAM to do business with the Federal Government. Contractors are required to be registered in SAM at the time of proposal submission. The website for registering in SAM is www.sam.gov .
(g) Utilizing a best value subjective tradeoff evaluation, and subject to availability of funds, this solicitation will result in the award of a hybrid supply contract to one Offeror consisting of Firm-Fixed-Price (FFP) Requirement Contract Line Item Numbers (CLINs) for production items and Indefinite-Delivery, Indefinite-Quantity CLINs for modernization efforts that may be either Fixed Price or Cost-
Reimbursable.
(h) The resultant contract will consist of a base period with five one-year ordering periods; an evaluated option for five one-year ordering periods exercised at time of award; and two additional unevaluated five-year options. Therefore, the maximum period of performance is twenty years should both five-year unevaluated options be exercised. The resulting contract will also include a one-year transition following the contract's final ordering period to allow for completion of deliveries and ongoing projects.
(i) Offerors are advised that the current operating contractor will encumber and maintain the HSAAP facility through 31 December 2024.
Both the incumbent and the successful Offeror will be contractually required to negotiate contract transition activities in good faith to affect a complete, safe, and secure assumption of responsibilities without impacting facility operations, production deliveries, and ongoing modernization projects as required by Attachment 0011, PWS 11 - Transition and Start Up. The successful Offeror will take over operational control of the facility at 0000 EST on 01 January 2025, unless otherwise negotiated with the incumbent and contractually executed by the Government.
(j) Pursuant to FAR 9.103, a contract will only be awarded to a contractor that the Contracting Officer determines to be responsible.
Offerors must be able to demonstrate that they meet the standards of responsibility as set forth in FAR 9.104. The Government reserves the right to conduct a pre-award survey on any or all Offerors, and if applicable, joint venture partners, and major subcontractors.
(k) Receipt of an Offeror's proposal in response to this solicitation is an affirmation that the contractor has had access to and received adequate information to prepare a proposal.
(l) In accordance with FAR 9.5, Organizational and Consultant Conflicts of Interest, it has been determined that the companies, and any affiliates or subsidiaries, listed below have an Organizational Conflict of Interest (OCI) and are prohibited from offering a proposal as a prime contractor or participating as a sub-contractor or a member of any team competing for this contract. The Government reserves the right to reject any offer it considers to represent an OCI.
(1) The Shenton Group
(2) Azimuth Consulting Services (Azimuth)
(3) Northeastern Energetic Process Services Company
(m) Offerors are advised that the Government will be using contractor support from Azimuth during the source selection process. As
Azimuth will have access to Offerors' proposals, in addition to the aforementioned restrictions under paragraph (l), Offerors are required to execute a Non-Disclosure Agreement (NDA) with Azimuth. Azimuth is prohibited from participating as a subcontractor on any efforts/projects executed under the resultant contract. Offerors shall submit the executed NDA with its proposal. The NDA found at
Attachment 0028 serves as a template and may be altered if mutually agreed upon by both parties.
(n) The Government reserves its right to award modernization projects to the prime operator, the U.S. Army Corps of Engineers, or a third party.
(o) Offerors shall not propose any assumptions that take exception to the solicitation. Should an Offeror propose assumptions that do take exception to the solicitation, the Government reserves the right to deem the proposal unacceptable and ineligible for award.
3. REQUIREMENTS SUMMARY: ____________________
(a) The contract will consist of FFP Requirements CLINs for production items.
(b) Requirement CLINs include all Research Development Explosive (RDX), High Melting Explosive (HMX), and Insensitive Munitions
Explosive (IMX) families of explosives awarded by the Army Contracting Command - Rock Island (ACC-RI).
3 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(c) The costs associated with performing the following indirect PWSs shall be accomplished by the contractor at no direct cost to the
Government (i.e., borne by the product price):
PWS 1 Facility Plans, Strategies, and Analyses
PWS 2 Government Property Management
PWS 3 Environmental
PWS 4 Safety
PWS 5 Security / Antiterrorism
PWS 6 Utilities and Energy
PWS 7 Fire and Emergency Services
PWS 8 Maintenance of Facilities
PWS 9 Cyber Security
PWS 10 Occupational Health Program
PWS 11 Transition / Start-Up
PWS 12 Contract Transition (End of Contract)
PWS 13 Facility Operations and Production Reporting; Production Support
(d) The following PWS will be directly funded, subject to availability of funds:
PWS 14 Support of Onsite Government Staff & Natural & Cultural Resources
PWS 15 Material Management
(e) The following PWS will be funded utilizing tenant rent revenue: PWS 16 - Armament Retooling and Manufacturing Support.
(f) Reference Narrative H0002, Restriction of Critical Items and Components, for a list of critical items and components whose manufacture are restricted to sources within the U.S. or its outlying areas.
(g) Government Property: The Government intends to provide the property listed at Attachment 0018 - Government Furnished Property, to the successful Offeror under this contract in an "as is, where is" condition. The Government will retain ownership of property and obtain rights to intellectual property in accordance with Narrative H0001 - Ownership of Property and Rights to Intellectual Property.
(h) The contract is F.O.B. Origin. The Government is only responsible for the costs associated with the shipment of the deliverable end item; the contractor is responsible for all other shipping, to include components, ingredients, and equipment.
(i) First Article Tests (FATs) are required in accordance with Narrative E0006, First Article Test (Contractor Testing), and shall be priced in accordance with Attachments 0022 and 0025.
(j) The successful Offeror is required to abide by the terms of the HSAAP Armament Retooling and Manufacturing Support (ARMS) Tenant Use
Agreements in existence and effective beyond 31 December 2024. The ARMS Tenant Use Agreements are provided at Attachment 0021.
(k) The Government has conducted a Baseline Facility Assessment (BFA) and Baseline Environmental Condition Assessment (BECA) at HSAAP for the purpose of presenting the current operating state of equipment and environmental conditions at the facility. This assessment is intended to be used for informational purposes only to assist in determining the suitability and conditions of the processes, facilities, and environmental conditions at the facility. In using any of the information and evaluations in the BFA or BECA, bidders should independently verify and determine whether to include specific actions in their proposals and plans and must assume all liability for the success or failure of these actions. The Government expressly makes no representations as to the probability of the success of the assets and opportunities examined in these reports, nor the accuracy or completeness of information in total. The final assessment of the adequacy of the equipment, infrastructure, and environmental conditions must be made by report users. The results are available to Offerors via HSAAP's VL.
(l) A Small Business (SB) Subcontracting Plan is required at the time of proposal submission; see FAR 52.219-9, Small Business
Subcontracting Plan -- Alternate II (Deviation 2018-O0018), for details. Small Business goals are as follows:
Small Business: 15%
Small Disadvantaged Business: 2%
Women-Owned Small Business: 4%
HUBZone Certified Small Business: 4%
Veteran-Owned Small Business: 3%
Service Disabled Veteran-Owned Small Business: 3%
(m) All contractual provisions specified are obligatory for the prime contractor. The prime contractor is responsible for enforcing contractual provisions upon all subcontractors, suppliers, and vendors.
(n) Offerors may submit an Indemnification request package. Packages shall be in accordance with Section L and are due by 02 December
4 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
2022.
(o) With the exception of Volume 6, Indemnification Request Package, Offerors' proposals shall be submitted no later than the date specified in Block 9 of the SF33, and shall be valid for a minimum of 360 days after submission. Offerors shall input 360, as a minimum, into Block 12 of the SF33.
(p) The successful Offeror's proposal in response to this solicitation may be incorporated into the resultant contract in whole or in part at the time of the award. If incorporated, the Offeror's proposal will therefore be a material term of the contract and failure to fully implement it could result in termination. No revisions or changes to the contractor's proposal may be made after award without prior approval of the Contracting Officer.
(q) The Government will re-negotiate, as required, the terms and conditions of this contract if future Base Realignment and Closure
(BRAC) legislation or other Government decisions alter current plant status/missions. The Government shall retain the right to modify the mission of the facility; this may include, or result in, the potential closure of the facility.
(r) The Contractor is advised that contract changes, to include engineering changes, will be authorized only by the Contracting Officer in accordance with the terms of the resultant contract. No other Government personnel, whether in the act of technical supervision or administration, is authorized to make any commitment or instruct the contractor to perform or terminate any work, or to incur any obligation.
(s) The ACC-RI Contracting Officer is the only individual authorized to issue orders under the resultant contract.
*** END OF NARRATIVE A0001 ***
5 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
(a) The HSAAP price matrix is applicable to Government direct buys procured under the contract resulting from this solicitation, as well as third party orders that are received in support of systems contracts that utilize HSAAP components. Prices in support of third party orders shall not exceed the prices established in the HSAAP price matrix as a result of this competition, or if future unevaluated options are exercised and negotiated. This requirement is also applicable to any future products not currently on the matrix that are subsequently negotiated and added.
(b) All proposed prices shall be entered into the price matrices at Attachments 0022-0024. If the Offeror is requesting indemnification, Attachment 0025 shall be submitted as well.
(c) Unit prices under this acquisition shall not contain more than two (2) decimal places.
(d) Evaluation quantities and weights are included in the price matrix. The evaluation quantities and weights are estimates only and are not obligatory under this contract; they are not binding and shall not be relied upon for execution purposes. Not meeting, or exceeding, the evaluation quantities should be expected and will not constitute revision of the price matrices or grounds for a request for equitable adjustment. If the Government's requirements do not result in orders meeting or exceeding the evaluation quantities, it shall not constitute the basis for a request for equitable adjustment or claim. All orders placed against this contract are subject to availability of funds.
(e) Plant Wide Volume:
(1) Offerors shall propose unit prices under three total plant volume ranges. Total Evaluated Price will be based on the sum of the total values of each weight-adjusted Range. Ranges will be weighted as specified below. Annual range determinations will occur prior to the start of each ordering period. All orders placed during the applicable ordering period will be priced at the pre-determined range.
Total plant volume will be defined as the sum of all HSAAP SMCA direct, 3rd party Government, and commercial product orders (in lbs.)
anticipated to be placed within the ordering period. Range 2 will be the default range unless the Contracting Officer determines that total plant volume based on orders will be in Ranges 1 or 3. In such a case, the Contracting Officer will notify the Contractor of the range pricing to be utilized no later than 30 days prior to entering the ordering period. The Contractor will be required to honor the range pricing the PCO determines is applicable for the given ordering period. Delays in production of orders will not be considered during the Range determination process.
(2) The range determination will be binding throughout the ordering period. Retroactive adjustments due to variations between the pre-ordering period determination and actual orders received will not be allowable.
Plant-wide ranges and weighting factors are provided below.
Range 1: 0 to 4,000,000 Lbs. (15%)
Range 2: 4,000,001 to 10,500,000 (75%)
Range 3: 10,500,001 to 15,000,000 (10%)
(f) Economic Price Adjustment: All matrix unit prices are subject to an economic price adjustment in accordance with Narrative I0002, Economic Price Adjustment - Natural Gas and Narrative I0004, Economic Price Adjustment - Escalation.
(g) Combined Orders for Selected Products: The Government reserves the right to combine orders for the identified RDX, IMX, and TATB based products for the purpose of product level quantity range assignment when those orders are placed on the same business day. The quantity range for any one product will be assigned based on the total combined order size for the group of relevant products. The range for an individual order will be selected based on that individual orders size (in lbs.) plus the total lbs. from the other orders within the same-day group of related products. This will apply to SMCA direct orders only. Individual orders that fall within product level
Range 2 or below are exempt from consideration as components of a combined order.
In certain cases, the combined total quantity of all orders within the group may exceed a given products Range 4 (for products with 4 ranges) or Range 5 (for products with 5 ranges) maximum. However, the individual order will not be deemed to have exceeded this maximum based on the combined total of all products within the group.
Example:
Total same-day orders placed under the combined order feature are displayed below in Lbs.:
Order 1 - CXM-7 350,000
Order 2 - CXM-AF-7 740,000
Order 3 - CXM-AF-5 150,000
Order 4 - PBXN-10 Type 1 50,000
Total Lbs. 1,290,000
Quantity ranges applicable to each order under this example are identified via asterisks below.
Quantity Range Quantity Range
6 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CLIN 0007: CXM-7 Type II CLIN 0009: CXM-AF-7
Range 1 1 - 6,200 Range 1 1 - 4,100
Range 2 6,201 - 100,000 Range 2 4,101 - 100,000
Range 3 100,000 - 500,000 Range 3 100,001 - 500,000
*Range 4 500,001 - 2,000,000* *Range 4 500,001 - 2,000,000*_____________________________________ ________________________________
Range 5 2,000,001 - 4,500,000 Range 5 2,000,001 - 4,500,000
Quantity Range Quantity Range
CLIN 0008: CXM-AF-5 CLIN 0010: PBXN-10 Type 1
Range 1 1 - 3,690 Range 1 1 - 1,900
Range 2 3,691 - 50,000 Range 2 1,901 - 25,000
Range 3 50,001 - 250,000 Range 3 25,001 - 75,000
Range 4 250,001 - 1,000,000 *Range 4 75,001 - 500,000* ________________________________
*Range 5 1,000,001 - 4,500,000*_____________________________________
Selected RDX Based Products
Composition B, Type 1, Grade A Composition B4
Composition C-4 CXM-7
CXM-AF-5 CXM-AF-7
PBXN-10 Type 1
RDX, Type 2, Class 1
Selected TATB Based Products
PBXN-12 Type I PBXN-12 Type II
PBXN-7 Type 1, Class 2
PBXN-7, Type 2 TATB Type 2 (DRY)
TATB Type I Class 2
TATB Type III Class 1
TATB Type III Class 2
Selected IMX Based Products
IMX-101
IMX-104
(h) Non-Competitive Contract Actions: No profit or fee will be allowed on the actual purchase of utilities under non-competitive contract actions awarded under the contract resulting from this solicitation.
(i) FFP Delivery Orders (DO) and DO modifications will be utilized to place requirements for explosives based on the quantities and the ordering period within which the DO is placed. DO numbers will be assigned a unique 14-digit number upon establishment of the DO. As such, CLINs will be identified via Ordering Period (OP) as follows:
OP 01 Production Orders: 01XX
OP 02 Production Orders: 02XX
OP 03 Production Orders: 03XX
OP 04 Production Orders: 04XX
OP 05 Production Orders: 05XX
OP 06 Production Orders: 06XX
OP 07 Production Orders: 07XX
OP 08 Production Orders: 08XX
OP 09 Production Orders: 09XX
OP 10 Production Orders: 10XX
The first two digits of the awarded CLIN will represent the Ordering Period (i.e. OP 01-10) and the last two digits of the awarded CLIN will represent that product number from the Attachment 0022 - Price Matrix. For example, an order of CLIN 0018: CXM-9 in Ordering Period
04 would be executed under CLIN 0418.
(j) Production Base Support (PBS) efforts (inclusive of Modernization projects) will be negotiated and awarded via separately priced
Fixed Price or Cost Reimbursable delivery orders or delivery order modifications. The successful awardee will not be permitted to charge costs associated with execution of the PWS scopes to Production Base Support efforts as direct costs or indirect allocations.
(k) New Facilities Under On-going Modernization Initiatives: The Government has shared the most current information available regarding scope, schedule, status, and various other items for the modernization projects being executed by the incumbent operator that will be completed subsequent to award of the contract resulting from this solicitation. The transition of these new facilities to the successful
Offeror will not constitute change conditions to this contract. Additionally, the Government has provided its best estimate of project completion dates, but actual completion dates may vary from these estimates. Delays in project completion will not constitute change
7 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
conditions to this contract. However, the successful awardee will not be accountable for achieving post modernization capacity requirements until such time that the modernized facilities are transitioned to production. Any variance in the actual date facilities are transitioned to production to those provided in support of this solicitation will not be grounds for a change condition, request for equitable adjustment, or claim.
(l) The Government may require modernization analysis, interface, engineering support, and the procurement of components and raw materials. Such efforts will be negotiated and awarded via separately priced Fixed Price or Cost Reimbursable delivery orders or delivery order modifications.
(m) The contractor shall propose fair and reasonable prices for components and/or explosives for third party contracts in support of any
Government contract.
(n) All products presented for acceptance to the Government under the resultant contract shall be fully compliant with the TDPs provided with the solicitation. Any cost impact due to Government approved configuration change(s) during contract execution will be limited exclusively to the costs directly attributable to the change(s), require substantiation, and be negotiated in accordance with the
Changes Clause (52.243-1, Changes-Fixed Price).
(o) In the event unevaluated option periods are executed in the future, the HSAAP contractor agrees to utilize a mutually agreeable pricing curve, in lieu of range pricing, to establish prices for production items. Information regarding implementation of pricing curves in DoD acquisitions can be found at the following website: https://www.acq.osd.mil/asda/dpc/pcf/pricing-tools.html
*** END OF NARRATIVE B0001 ***
8 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
TECHNICAL DATA PACKAGES_______________________
The following drawings and specifications are applicable to this solicitation. Exceptions can be found at Attachment 0033 TDP
Exceptions.
CLIN NOMENCLATURE NSN TDP # Date____ ____________ ___ _____ ____
CLIN 0001 Composition A-3 1376-00-628-3300 MIL-DTL-440-COMP-A-3:19200 11 SEP 2020
CLIN 0002 Composition A-4 1376-01-055-9905 MIL-DTL-440-COMP-A-4:19200 16 SEP 2020
CLIN 0003 Composition A-5 Class 1 1376-00-764-8065 MIL-DTL-14970-CLASS-1:19200 16 SEP 2020
CLIN 0004 Composition B Type I Grade A 1376-00-628-3306 MIL-C-401-T1-GA:19200 20 NOV 2020
CLIN 0005 Composition B-4 Type I 1376-00-077-6402 MIL-C-46652:19200 16 SEP 2020
CLIN 0006 Composition C-4 Class 3 1376-01-393-0259 MIL-DTL-45010:19200 16 SEP 2020
CLIN 0007 CXM-7 Type II 1376-01-280-5339 6256843 14 DEC 2020
CLIN 0008 CXM-AF-5 1376-01-632-8663 MIL-DTL-20084713 04 FEB 2014
CLIN 0009 CXM-AF-7 1376-01-562-8442 MIL-DTL-20065102 04 FEB 2014
CLIN 0010 PBXN-10 Type I TBD 7428271 14 DEC 2020
CLIN 0011 PBXN-10 Type 2 TBD 7428293 14 DEC 2020
CLIN 0012 RDX Type II Class 1 1376-00-764-8070 MIL-DTL-398-T2-C1:19200 20 NOV 2020
CLIN 0013 RDX Type II Class 3 1376-00-007-4875 MIL-DTL-398-T2-C3:19200 20 NOV 2020
CLIN 0014 RDX Type II Class 5 1376-00-007-4877 MIL-DTL-398-T2-C5:19200 20 NOV 2020
CLIN 0015 RDX Type II Class 7 1376-01-071-2164 MIL-DTL-398-T2-C7:19200 20 NOV 2020
CLIN 0016 IMX-101 1376-01-564-0493 MIL-DTL-32357:19200 16 SEP 2020
CLIN 0017 IMX-104 1376-01-591-8987 MIL-DTL-32425:19200 20 NOV 2020
CLIN 0018 CXM-9 TBD 7428265 14 DEC 2020
CLIN 0019 CXM-10 Type II 1376-01-632-8692 7428267 14 DEC 2020
CLIN 0020 CXM-10 Type III 1376-01-647-5841 7428268 14 DEC 2020
CLIN 0021 CXM-11 1376-01-632-8678 7428266 14 DEC 2020
CLIN 0022 HMX 80S 1376-01-262-5397 7428288 14 DEC 2020
CLIN 0023 HMX Grade B Class 1 1376-00-865-3850 MIL-DTL-45444-GB-C1:19200 16 SEP 2020
CLIN 0024 HMX Grade B Class 2 1376-00-865-3964 MIL-DTL-45444-GB-C2:19200 16 SEP 2020
CLIN 0025 HMX Grade B Class 3 1376-00-865-4003 MIL-DTL-45444-GB-C3:19200 16 SEP 2020
CLIN 0026 HMX Grade B Class 5 1376-00-865-4435 MIL-DTL-45444-GB-C5:19200 16 SEP 2020
CLIN 0027 LX-14-0 1376-01-153-8408 MIL-H-48358:19200 16 SEP 2020
CLIN 0028 PAX-2A, Type I 1376-01-538-5776 MIL-DTL-71053-T1:19200 16 SEP 2020
CLIN 0029 PAX-2A, Type II TBD MIL-DTL-71053-T2:19200 16 SEP 2020
CLIN 0030 PAX-3 Type III TBD MIL-DTL-32636-T3:19200 16 SEP 2020
CLIN 0031 PBX-9501 Depart. of Energy 1376-01-076-3415 RM6K0015 16 SEP 2020
CLIN 0032 PBXN-11 Class 1 1376-01-497-4435 7428249 14 DEC 2020
CLIN 0033 PBXN-5 Type I Class 3 1376-01-074-9321 7428292 14 DEC 2020
CLIN 0034 PBXN-5 Type 2 Class 3 1376-01-074-0494 6737412 14 DEC 2020
CLIN 0035 PBXN-9 1376-01-376-3743 6737406 14 DEC 2020
CLIN 0036 Composition D-2 1376-00-628-3323 5388922 14 DEC 2020
CLIN 0037 NTO Coarse TBD MIL-DTL-32355-COARSE:19200 16 SEP 2020
CLIN 0038 PBXN-12 Type I 1376-01-672-7369 7428272 15 DEC 2020
CLIN 0039 PBXN-12 Type II 1376-01-672-9351 7428273 15 DEC 2020
CLIN 0040 PBXN-7 Type 1, Class 2 1376-01-376-5576 6737405 15 DEC 2020
CLIN 0041 PBXN-7 Type 2 TBD 7428291 15 DEC 2020
CLIN 0042 TATB Type II (Dry) TBD 7428284 14 DEC 2020
CLIN 0043 Octol 75/25 1376-00-560-2206 MIL-O-45445-T1:19200 16 SEP 2020
CLIN 0044 CXM-10 Type 1 1376-01-647-5839 7428264 14 DEC 2020
CLIN 0045 PAX-48 TBD MIL-DTL-32419:19200 16 SEP 2020
CLIN 0046 TATB Type I Class 2 TBD 7428294 14 DEC 2020
CLIN 0047 TATB Type III Class 1 TBD 7428289 14 DEC 2020
CLIN 0048 TATB Type III Class 2 TBD 7428290 14 DEC 2020
TDPs for the items identified above can be found on SAM.gov in the Virtual Library. It is the Offeror's responsibility to ensure it has obtained the most recent specifications that the Government has made available in the Virtual Library to support proposal development.
The Government will incorporate approved engineering change proposals (ECPs) into the resulting contract as they are submitted, reviewed, and approved.
*** END OF NARRATIVE C0001 ***
9 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
FIRST ARTICLE TEST (CONTRACTOR TESTING)_______________________________________
(a) The first article shall consist of the requirements of the following item specifications, which shall be examined and tested in accordance with contract requirements, the item specifications, Quality Assurance Provisions (QAPS) and all drawings listed in the
Technical Data Package.
- Composition A-3 MIL-DTL-440D
- Composition A-4 MIL-DTL-440D
- Composition A-5 Class 1 MIL-DTL-14970E
- Composition B Type I Grade A MIL-C-401E w/ Amd 1
- Composition B4 MIL-C-46652A w/ Amd 2
- Composition C-4 MIL-DTL-45010B
- Composition D-2 MIL-DTL-18164B w/ exceptions in ADL 5388922
- CXM-7 Type II MIL-DTL-82907B
- CXM-9 MIL-E-82895 w/ Amd 1
- CXM-10 Type 1 MIL-DTL-32189C
- CXM-10 Type 2 MIL-DTL-32189C
- CXM-10 Type 3 MIL-DTL-32189C
- CXM-11 MIL-DTL-32230A
- CXM-AF-5 MIL-DTL-20084713A
- CXM-AF-7 MIL-DTL-20065102A
- HMX 80S WS 27816
- HMX GRADE B CLASS 1 MIL-DTL-45444C w/ Amd 1
- HMX GRADE B CLASS 2 MIL-DTL-45444C w/ Amd 1
- HMX GRADE B CLASS 3 MIL-DTL-45444C w/ Amd 1
- HMX GRADE B CLASS 5 MIL-DTL-45444C w/ Amd 1
- IMX-101 MIL-DTL-32357
- IMX-104 MIL-DTL-32425 w/ Amd 2
- LX-14-0 MIL-H-48358 w/Amd 7
- NTO Coarse MIL-TDL-32355 w/ Amd 3
- Octol 75/25 MIL-O-45445B w/ Amd 1
- PAX-2A, Type I MIL-DTL-71053A
- PAX-2A, Type II MIL-DTL-71053A
- PAX-3 Type III MIL-DTL-32636
- PAX-48 MIL-DTL-32419
- PBX-9501 RM6K0015
- PBXN-5 Type I Class 3 MIL-E-81111C
- PBXN-5 Type 2 Class 3 MIL-E-81111C
- PBXN-7 Type 1, Class 2 MIL-DTL-82874E
- PBXN-7 Type 2 MIL-DTL-82874E
- PBXN-9 MIL-DTL-82875A
- PBXN-10 Type I MIL-DTL-32057B
- PBXN-10 Type II MIL-DTL-32057B
- PBXN-11 Class I MIL-DTL-32064 w/ Amd 3
- PBXN-12 Type I MIL-DTL-32280A
- PBXN-12 Type II MIL-DTL-32280A
- RDX TYPE II CLASS 1 MIL-DTL-398D w/ ECP BAE-19M-001 & BAE-15D-001
- RDX TYPE II CLASS 3 MIL-DTL-398D w/ ECP BAE-19M-001 & BAE-15D-001
- RDX TYPE II CLASS 5 MIL-DTL-398D w/ ECP BAE-19M-001 & BAE-15D-001
- RDX TYPE 2 CLASS 7 MIL-DTL-398D w/ ECP BAE-19M-001 & BAE-15D-001
- TATB Type I Class 2 DTL WS 23158C
- TATB Type II (DRY) DTL WS 23158C
- TATB Type III Class 1 DTL WS 23158C
- TATB Type III Class 2 DTL WS 23158C
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package provided by the Government.
(c) The first article shall be inspected and tested by the Contractor for all requirements of the drawing(s), the QAP(s), and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed
10 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within one-year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
(5) One-time qualification tests, which are defined as a one-time on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractors facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
(e) A First Article Test Report shall be compiled by the Contractor documenting the results of all inspections and tests (including suppliers and Vendors inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The Government Quality Assurance Representatives (QAR) findings shall be documented on DD Form 1222, Request for and Results of Tests, and attached to the Contractor's test report. Two copies of the First Article Test Report and the DD Form 1222 will be submitted through the Administrative Contracting Officer to the Contracting Officer with an additional information copy furnished to PQM.
(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 180 days, or (iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the Contractor.
*** END OF NARRATIVE E0006 ***
AMMUNITION DATA CARDS_____________________
(a) Detailed requirements and guidance for the preparation of Ammunition Data Cards (ADCs) and Ammunition Lot Numbers are contained in
MIL-STD-1168, the applicable DD Form 1423 and the Worldwide Ammunition-data Repository Program (WARP) online users manual. Detailed requirements for obtaining and using a manufacturers identification symbol, which is an integral component of the ammunition lot number, can be found in MIL-STD-1168 and the WARP users manual. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term should are considered to be replaced with the word shall.
(b) The contractor shall develop and submit ADCs in accordance with the requirements of this section, MIL-STD-1168, and the users manual located on the WARP database. The WARP application is accessed through the Munitions History Program (MHP) website. (Refer to
Ammunition Data Cards and Report of Contractor Ballistic Testing for more information.) The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(c) The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.
(d) Unless otherwise authorized by the Contracting Officer, the contractor shall include, in the components sections on the ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.
End Item Component Listing:
COMPOSITION B, TYPE I Grade A
MIL-DTL-398D RDX
MIL-DTL-248D TNT
11 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
MIL-W-20553D Indramic Wax
COMPOSITION C-4
MIL-DTL-398D RDX
A-A-59410A DMDNB
DOD-D-23443B DOA
MIL-P-13298A PIB
MIL-P-14796 Process Oil
CXM-7
MIL-DTL-398D RDX
DOD-D-23443B DOA
CXM-AF-5
MIL-DTL-398D RDX
DOD-D-23443B DOA
CXM-AF-7
MIL-DTL-398D RDX
DOD-D-23443B DOA
PBXN-12
MIL-DTL-45444C HMX
WS 23158C TATB
7428223 Viton
CXM-10, TYPE I
MIL-DTL-45444C HMX
AS 2328A Isodecyl Pelargonate (IDP)
CXM 10, TYPE II
MIL-DTL-45444C HMX
AS 2328A Isodecyl Pelargonate (IDP)
CXM 10, TYPE III
MIL-DTL-45444C HMX
AS 2328A Isodecyl Pelargonate (IDP)
HMX, GRADE B, CLASS 1
Commercial Spec Acetic Acid
Commercial Spec Acetic Anhydride
Commercial Spec Ammonia
MIL-H-502B Hexamine
Commercial Spec Nitric Acid
HMX, GRADE B, CLASS 2
Commercial Spec Acetic Acid
Commercial Spec Acetic Anhydride
Commercial Spec Ammonia
MIL-H-502B Hexamine
Commercial Spec Nitric Acid
HMX, GRADE B, CLASS 3
Commercial Spec Acetic Acid
Commercial Spec Acetic Anhydride
Commercial Spec Ammonia
MIL-H-502B Hexamine
Commercial Spec Nitric Acid
HMX, GRADE B, CLASS 5
Commercial Spec Acetic Acid
Commercial Spec Acetic Anhydride
Commercial Spec Ammonia
MIL-H-502B Hexamine
Commercial Spec Nitric Acid
12 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CXM-11
MIL-DTL-45444C HMX
AS 2328A Isodecyl Pelargonate (IDP)
PBXN-7, TYPE 2
MIL-DTL-398D RDX
WS 23158C TATB
7428223 Viton
PBXN-9
DOD-D-23443B DOA
MIL-DTL-45444C HMX
WS 32630A Hytemp
RDX, TYPE 2, CLASS 1
Commercial Spec Acetic Acid
Commercial Spec Acetic Anhydride
Commercial Spec Ammonia
MIL-H-502B Hexamine
Commercial Spec Nitric Acid
RDX, TYPE 2, CLASS 3
Commercial Spec Acetic Acid
Commercial Spec Acetic Anhydride
Commercial Spec Ammonia
MIL-H-502B Hexamine
Commercial Spec Nitric Acid
RDX, TYPE 2, CLASS 7
Commercial Spec Acetic Acid
Commercial Spec Acetic Anhydride
Commercial Spec Ammonia
MIL-H-502B Hexamine
Commercial Spec Nitric Acid
RDX, TYPE 2, CLASS 5
Commercial Spec Acetic Acid
Commercial Spec Acetic Anhydride
Commercial Spec Ammonia
MIL-H-502B Hexamine
Commercial Spec Nitric Acid
IMX-101
MIL-DTL-32354A DNAN
MIL-DTL-32355 w/amd 1 NTO
MIL-N-494A w/draft apdx Nitroguanidine
IMX-104
MIL-DTL-398D RDX
MIL-DTL-32354A DNAN
MIL-DTL-32355w/amd 1 NTO
TATB, TYPE 2 (DRY)
Commercial Spec Ammonia
Commercial Spec Nitric Acid
A-A-59893 TCB
Commercial Spec Toluene
PBXN-10 Type 1
MIL-DTL-398D RDX
WS 32630A Hytemp
DOD-D-23443B DOA
HMX 80S
13 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Commercial Spec Acetic Acid
Commercial Spec Acetic Anhydride
Commercial Spec Ammonia
MIL-H-502 Hexamine
Commercial Spec Nitric Acid
LX-14
MIL-DTL-45444C HMX
MIL-P-63196A Polyurethane Elastomer
PBXN-5 Type I Class 3
MIL-DTL-45444C HMX
7428223C Viton
PBXN-5 Type II Class 3
MIL-DTL-45444C HMX
7428223C Viton
PBXN-10 Type 2
MIL-DTL-398D RDX
WS 32630A Hytemp
DOD-D-23443B DOA
PBXN-11
MIL-DTL-45444C HMX
DOD-D-23443B DOA
WS 32630A Hytemp
Composition A-3
MIL-DTL-398, RDX Type II
MIL-W-20553, Desensitizing wax
Composition A-4
MIL-DTL-398, RDX Type II
MIL-W-20553, Desensitizing wax
Composition A-5 Class 1
MIL-DTL-398, RDX Type II, Class 1
MIL-S-271, Stearic acid
Composition B4
MIL-DTL-398, RDX
MIL-T-248, TNT
Calcium Silicate, MIL-C-51077
Composition D-2
MIL-L-3061, Lecithin
MIL-W-20553, Wax, Desentizing
Nitrocellulose, TT-N-350 Type II
CXM-9
MIL-H-45333, HMX Grade B
WS 33247, LMA
MIL-L3061, Lecithin
CXM-11
MIL-DTL-45444, HMX
AS 2328, IDP
NTO Coarse
Commercial spec, Nitric Acid
Octol 75/25
MIL-DTL-248, Trinitrotoluene
MIL-DTL-45444, HMX
14 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
PAX-2A, Type I
MIL-DTL-45444, HMX
WS 1141, BDNPA/F
CAB-381-20, CAB
PAX-2A, Type II
MIL-DTL-45444, HMX
WS 1141, BDNPA/F
CAB-381-20, CAB
ASTM D 5675, Fluoropolymer micropowder
PAX-3, Type III
MIL-DTL-45444, HMX
MIL-DTL-512, Aluminum Powder
WS 1141, BDNPA/F
CAB-381-20, CAB
PAX-48
MIL-DTL-45444, HMX
MIL-DTL-32355, NTO
MIL-DTL-32354, DNAN
PBX-9501
MIL-DTL-45444, HMX
PS6K0291-000, Polymer
13Y-188412, Plasticizer
Commercial spec, Stabilizer
(e) The component items identified below are from paragraph (d) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168 and WARP requirements. Drawing Number from paragraph
(d) above N/A, components as follows: N/A
(f) Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements. Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components. When not required by technical data package and not an end item or major component, the component lot number may be constructed through contractor lot number convention.
(g) The flowdown of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (e) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.
(h) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (e) above. The WARP users manual provides information on the level of detail required.
(i) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.
*** END OF NARRATIVE E0009 ***
MIL-STD-1171B, ENERGETIC MATERIAL DESCRIPTION SHEETS AND PROPELLANT LOADING AUTHORIZATION SHEETS________________________________________________________________________________________________
(a) The contractor shall prepare Energetic Material Description Sheets and Propellant Loading Authorization Sheets in accordance with
MIL-STD-1171B when mandated by the Contract Data Requirements List (CDRL). The Worldwide Ammunition-data Repository Program (WARP) shall be utilized to store the data sheets required by MIL-STD-1171B. The Munitions History Program (MHP) network located at https://mhp.redstone.army.mil/ must be used to gain access to WARP.
(b) The requirements of MIL-STD 1171B specified in the CDRL is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(c) The contractor is responsible for on-screen entry of the data sheets into the appropriate Description Sheets and Loading
Authorizations module located in the WARP system.
(d) The presence of the Contractor's typed signature has the same legal effect and consequences of a handwritten signature. The
15 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
signatory of the data sheets has the authority to sign for the contractor and certifies the information contained on the data sheets is truthful and accurate as evidenced by release of the typed signature.
The explosives/chemicals requiring Description Sheets for Explosives, Chemicals are:
Composition A-3
Composition A-4
Composition A-5 Class 1
Composition B Type I Grade A
Composition B4
Composition C-4
Composition D-2
CXM-7
CXM-9
CXM-10 Type 1
CXM-10 Type 2
CXM-10 Type 3
CXM-11
CXM-AF-5
CXM-AF-7
HMX 80S
HMX GRADE B CLASS 1
HMX GRADE B CLASS 2
HMX GRADE B CLASS 3
HMX GRADE B CLASS 5
IMX-101
IMX-104
LX-14-0
NTO Coarse
Octol 75/25
PAX-2A, Type I
PAX-2A, Type II
PAX-3 Type III
PAX-48
PBX-9501
PBXN-5 Type I Class 3
PBXN-5 Type 2 Class 3
PBXN-7 Type 1, Class 2
PBXN-7 Type 2
PBXN-9
PBXN-10 Type I
PBXN-10 Type II
PBXN-11 Class I
PBXN-12 Type I
PBXN-12 Type II
RDX TYPE II CLASS 1
RDX TYPE II CLASS 3
RDX TYPE II CLASS 5
RDX TYPE 2 CLASS 7
TATB Type I Class 2
TATB Type II (DRY)
TATB Type III Class 1
TATB Type III Class 2
*** END OF NARRATIVE E0010 ***
16 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Required Delivery Schedule__________________________
(a) All production orders placed under the HSAAP contract shall be delivered within 12 months of award, with the exception of those orders placed in the first ordering period. Production orders placed within the first ordering period shall be delivered within 24 months of award. Exceptions to the delivery schedule requirements identified herein may only be authorized upon written approval by the
Contracting Officer.
(b) In the event of a national emergency, including engagement in conflict or declaration of war, the Government reserves the right to establish expedited delivery schedule requirements.
(c) Any delinquencies or delays in delivery caused by the Contractor's failure to successfully complete First Article Testing will be deemed contractor fault and will not constitute an excusable delay. Government denial of the Contractor's First Article Test plans and/or denial of the Contractor's request to waive First Article Testing is also not be considered an excusable delay for any delinquencies in delivery.
(d) Disputes and controversies of any nature whatsoever between the Government and Contractor regarding this narrative will be settled via determination by the Contracting Officer. The Contracting Officer's determination shall be final and binding on the Government and
Contractor.
*** END OF NARRATIVE F0001 ***
17 46
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION H - SPECIAL CONTRACT REQUIREMENTS
OWNERSHIP OF PROPERTY AND RIGHTS TO INTELLECTUAL PROPERTY_________________________________________________________
(a) Ownership of Personal Property:
Government property provided under this contract includes the personal property outlined in Attachment 0018 - Government Furnished
Property and all real property. This property is furnished to the contractor in an "as is, where is" condition. The Government makes no warranty regarding the suitability for use of the Government property specified in this contract.
In accordance with, FAR 52.245-1, Government Property, and PWS 2 - Government Property Management, the Government will retain title and ownership to all Government-furnished property and modifications to Government furnished property provided under the contract. In addition, the Government will establish title and ownership in all property acquired and/or utilized by the Contractor in the performance of the contract as provided for in FAR 52.245-1. Pursuant to FAR 52.245-1, paragraph (e)(2), this narrative establishes specific requirements for passage of title, wherein title to property acquired, fabricated, or utilized by the Contractor for use on fixed price contracts or fixed price line items will vest with the Government, rather than be retained by the Contractor. This requirement for passage of title to the Government for property acquired and/or utilized by the Contractor under fixed price efforts applies to acquisitions under the contract resulting from solicitation W52P1J-19-R-0142, as well as third party contracts authorized by the Government under the contract.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .