W52P1J-19-R-0142 - HSAAP Competition - 2nd Draft RFP.pdf

PDF 348 KB Posted

Attached to
Holston Army Ammunition Plant - Virtual Library
Solicitation number
W52P1J-19-R-0142
Issued by

View the file

Other files

File Type Posted
HSAAP QA - 29SEP22.pdf PDF
Attachment 0016 - PWS 16 - Armament Retooling and Manufacturing Support 20 May 22.pdf PDF
Attachment 0004 - PWS 4 - Safety 20 May 22.pdf PDF
Attachment 0025 - Price Matrix - Production (Indemnified) 20 May 22.xlsx XLSX spreadsheet
Attachment 0022 - Price Matrix - Production 20 May 22.xlsx XLSX spreadsheet
Attachment 0007 - PWS 7 - Fire and Emergency Services 20 May 22.pdf PDF
Attachment 0001 - PWS 1 - Facility Plans Strategies and Analyses 20 May 22.pdf PDF
Attachment 0005 - PWS 5 - Security - Antiterrorism 20 May 22.pdf PDF
Attachment 0015 - PWS 15 - Material Management 20 May 22.pdf PDF
Attachment 0002 - PWS 2 - Government Property Management 20 May 22.pdf PDF
Attachment 0006 - PWS 6 - Utilities and Energy 20 May 22.pdf PDF
Attachment 0010 - PWS 10 - Occupational Health Program 20 May 22.pdf PDF
Attachment 0031 - IP Certification.pdf PDF
Attachment 0011 - PWS 11 Transition and Start-up 20 May 22.pdf PDF
Attachment 0014 - PWS 14 - Suport of Onsite Government Staff and Natural and Cultural Resources 20 May 22.pdf PDF
Attachment 0013 - PWS 13 Facility Ops and Production Reporting - Production Sprt 20 May 22.pdf PDF
Attachment 0030 - EPA Adjustment Factors.xlsx XLSX spreadsheet
HSAAP Draft RFP Q and A - 16APR22.pdf PDF
Attachment 0010 - PWS 10 - Occupational Health Program.pdf PDF
Attachment 0016 - PWS 16 - Armament Retooling and Manufacturing Support.pdf PDF
Attachment 0004 - PWS 4 - Safety.pdf PDF
Attachment 0005 - PWS 5 - Security - Antiterrorism.pdf PDF
Attachment 0023 - Price Matrix - PWS.xlsx XLSX spreadsheet
Attachment 0001 - PWS 1 - Facility Plans Strategies and Analyses.pdf PDF
Attachment 0022 - Price Matrix - Production.xlsx XLSX spreadsheet
Attachment 0015 - PWS 15 - Material Management.pdf PDF
Exhibit A - Contract Data Requirements List - Production Items.pdf PDF
Attachment 0006 - PWS 6 - Utilities and Energy.pdf PDF
Exhibit B - Contract Data Requirement List - PWS.pdf PDF
Attachment 0020 - Hazardous Material Classification Specification.pdf PDF
Attachment 0024 - Price Matrix Summary Evaluation Matrix.xlsx XLSX spreadsheet
Attachment 0011 - PWS 11 - Contract Start-Up.pdf PDF
Attachment 0017 - Sample OPSEC Plan.pdf PDF
Attachment 0012 - PWS 12 - Contract Transition.pdf PDF
Attachment 0014 - PWS 14 - Suport of Onsite Government Staff and Natural and Cultural Resources.pdf PDF
Attachment 0029 - Contract Data Requirements List Guidance.pdf PDF
W52P1J-19-R-0142 - HSAAP DRAFT RFP - 19NOV21.pdf PDF
Attachment 0028 - Example Order HSAAP.pdf PDF
Attachment 0025 - Price Matrix - Production (Indemnified).xlsx XLSX spreadsheet
Attachment 0027 - Past Performance Questionnaire.pdf PDF
Attachment 0013 - PWS 13 - Facility Operations and Production Reporting and Production Support.pdf PDF
Attachment 0002 - PWS 2 - Government Property Management.pdf PDF
Attachment 0026 - Small Business Participation Plan.pdf PDF
Attachment 0007 - PWS 7 - Fire and Emergency Services.pdf PDF
Virtual Library Use and Non Disclosure Agreement.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W52P1J-19-R-0142 X

DOA6

SEE SCHEDULE

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

JACOB HARRISON

(309)782-7519

CCRI-AB

JACOB.T.HARRISON15.CIV@ARMY.MIL

1 143

X 1

X 5 X 8

X 13 X 27 X 45

X 52

X 54

X 57

X 101

X 102

X 118

X 133

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: JACOB HARRISON

Buyer Office Symbol/Telephone Number: CCRI-AB/(309)782-7519

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

1. NOTICE ______

(a) This is a second Draft Request for Proposal (RFP) for the Holston Army Ammunition Plant competition. The purpose of this document is to obtain industry comment and feedback on its contents prior to release of the Final RFP. The Government is not utilizing this document to negotiate or solicit proposals, and issuance of this Draft RFP does not serve to bind the Government in any way. Portions of this

Draft RFP are subject to change.

(b) Comments regarding this Draft RFP are due to the below individuals, via email, no later than 31 May 2022.

Ben Gillen Jacob Harrison

Contracting Officer Contract Specialist benjamin.j.gillen.civ@army.mil jacob.t.harrison15.civ@army.mil

2. EXECUTIVE SUMMARY _________________

(a) Solicitation W52P1J-19-R-0142 is for the production of explosives and the operation and modernization of the Holston Army Ammunition

Plant (HSAAP) beginning 01 January 2024.

(b) General information regarding this solicitation can be found on the System for Award Management (SAM) website at www.sam.gov by searching solicitation number W52P1J-19-R-0142. The Government has also established a Virtual Library (VL) on the SAM site for contractors to use in support of proposal development. Instructions for obtaining access to the VL are available on SAM. The data furnished by the Government to contractors under this solicitation may only be used in support of proposal development. No other use of this data is authorized.

(c) This acquisition is restricted to only those firms within the U.S. or its outlying areas.

(d) A SECRET Facility Security Clearance is required of the operating contractor of HSAAP due to the criteria identified in Attachment

0019, DD254 - Contract Security Classification Specification. The Government reserves the right to conduct an assessment of offerors' eligibility to obtain a SECRET Facility Security Clearance prior to contract award. Reference Narrative C0008, Facility Security

Clearance Requirement, for additional details.

(e) Specifications and drawings in the Technical Data Packages (TDPs) are Distribution D and Export Controlled.

(f) Contractors must have an active registration in SAM to do business with the Federal Government. Contractors are required to be registered in SAM at the time of proposal submission. The website for registering in SAM is www.sam.gov

(g) Utilizing a best value subjective tradeoff evaluation, and subject to availability of funds, this solicitation will result in the award of one, Firm-Fixed-Price (FFP) contract, to a single contractor.

(h) The resultant contract will consist of a base period with five, one-year ordering periods; an evaluated option for five, one-year ordering periods exercised at time of award; and two additional unevaluated five-year options. Therefore, the maximum period of performance is twenty years should both five-year unevaluated options be exercised. The resulting contract will also include a one-year transition following the contract's final ordering period to allow for completion of deliveries and ongoing projects.

(i) Offerors are advised that the current operating contractor will encumber and maintain the HSAAP facility through 31 December 2024.

Both the incumbent and the successful offeror will be contractually required to negotiate contract start-up activities in good faith to affect a complete, safe, and secure assumption of responsibilities without impacting facility operations, production deliveries, and ongoing modernization projects as required by Attachment 0011, PWS 11 - Transition - Start Up for Incoming Contractor. The successful offeror will take over operational control of the facility at 0000 EST on 01 January 2025, unless otherwise negotiated with the incumbent and contractually executed by the Government.

(j) Pursuant to FAR 9.103, a contract will only be awarded to a contractor that the Contracting Officer determines to be responsible.

Offerors must be able to demonstrate that they meet the standards of responsibility as set forth in FAR 9.104. The Government reserves the right to conduct a pre-award survey on any or all offerors, and if applicable, joint venture partners and major subcontractors.

2 143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(k) Receipt of a contractor's proposal in response to this solicitation is an affirmation that the contractor has had access to and received adequate information to prepare a proposal.

(l) In accordance with FAR 9.5, Organizational and Consultant Conflicts of Interest, it has been determined that the companies, and any affiliates or subsidiaries, listed below have an Organizational Conflict of Interest (OCI) and are prohibited from offering a proposal as a prime contractor or participating as a sub-contractor or a member of any team competing for this contract. The Government reserves the right to reject any offer it considers to represent an OCI.

(1) The Shenton Group

(2) Azimuth Consulting Services

(3) Northeastern Energetic Process Services Company

(m) The Government reserves its right to award modernization projects to the prime operator, the U.S. Army Corps of Engineers, or a third party. Should the Government elect to utilize a third party for modernization projects, the successful awardee of the contract resulting this solicitation, and all of its subcontractors and joint ventures partners, will be ineligible to bid on those projects as a prime contractor. The Government has determined that the prime operator of HSAAP, and its subcontractors and joint venture partners (to include wholly owned subsidiaries) have a conflict of interest and therefore are ineligible to compete on third party modernization projects for the duration of this resultant contract.

3. REQUIREMENTS SUMMARY: ____________________

(a) The contract will consist of FFP Requirements Contract Line Item Numbers (CLINs) for production items.(b) The costs associated with performing the following indirect PWSs shall be accomplished by the contractor at no direct cost to the Government (i.e., borne by the product price):

PWS 1 Facility Plans, Strategies, and Analyses

PWS 2 Government Property Management

PWS 3 Environmental

PWS 4 Safety

PWS 5 Security / Antiterrorism

PWS 6 Utilities and Energy

PWS 7 Fire and Emergency Services

PWS 8 Maintenance of Facilities

PWS 9 Cyber Security

PWS 10 Occupational Health Program

PWS 11 Contract Start-Up

PWS 12 Contract Transition

PWS 13 Facility Operations and Production Reporting; Production Support

(c) The following PWS will be directly funded, subject to availability of funds:

PWS 14 Support of Onsite Government Staff & Natural & Cultural Resources

PWS 15 Material Management

(d) The following PWS will be funded utilizing tenant rent revenue: PWS 16 - Armament Retooling and Manufacturing Support.

(e) Reference Narrative H0002, Restriction of Critical Items and Components, for a list of critical items and components whose manufacture are restricted to sources within the U.S. or its outlying areas.

(f) Government Property: The Government intends to provide the property listed at Attachment 0018 - Government Furnished Property, to the successful offeror under this contract in an "as is, where is" condition. The Government will retain ownership of property and obtain rights to intellectual property in accordance with Narrative H0001 - Ownership of Property and Rights to Intellectual Property.

(g) The contract is F.O.B. Origin. The Government is only responsible for the costs associated with the shipment of the deliverable end item; the contractor is responsible for all other shipping.

(h) First Article Tests (FATs) are required in accordance with Narrative E0006, First Article Test (Contractor Testing), and shall be priced in accordance with Attachments 0022 and 0025.

(i) The successful offeror is required to abide by the terms of the HSAAP Armament Retooling and Manufacturing Support (ARMS) Tenant Use

Agreements in existence and effective beyond 31 December 2023. The ARMS Tenant Use Agreements are provided at Attachment 0021.

(j) The Government has conducted a Baseline Facility Assessment (BFA) and Baseline Environmental Condition Assessment (BECA) at HSAAP for the purpose of presenting the current operating state of equipment and environmental conditions at the facility. This assessment is intended to be used for informational purposes only to assist in determining the suitability and conditions of the processes, 3 143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

facilities, and environmental conditions at the facility. In using any of the information and evaluations in the BFA or BECA, bidders should independently verify and determine whether to include specific actions in their proposals and plans and must assume all liability for the success or failure of these actions. The Government expressly makes no representations as to the probability of the success of the assets and opportunities examined in these reports, nor the accuracy or completeness of information in total. The final assessment of the adequacy of the equipment, infrastructure, and environmental conditions must be made by report users. The results are available to contractors via HSAAP's VL.

(k) A Small Business (SB) Subcontracting Plan is required at the time of proposal submission; see FAR 52.219-9, Small Business

Subcontracting Plan -- Alternate II (Deviation 2018-O0018), for details. Small Business goals are as follows:

Small Business: 15%

Small Disadvantaged Business: 2%

Women-Owned Small Business: 4%

HUBZone Certified Small Business: 4%

Veteran-Owned Small Business: 3%

Service Disabled Veteran-Owned Small Business: 3%

(l) All contractual provisions specified are obligatory for the prime contractor. The prime contractor is responsible for enforcing contractual provisions upon all subcontractors, suppliers, and vendors.

(m) Offerors may submit an Indemnification request package. Packages shall be IAW Section L and are due TBD.

(n) With the exception of Volume 6, Indemnification Request Package, offerors' proposals shall be submitted no later than the date specified in Block 9 of the SF33, and shall be valid for a minimum of 360 days after submission. This requirement takes precedence over the days stated in Block 12 of the SF33.

(o) The successful offeror's proposal in response to this solicitation may be incorporated into the resultant contract in whole or in part at the time of the award. If incorporated, the offeror's proposal will therefore be a material term of the contract and failure to fully implement it could result in termination. No revisions or changes to the contractor's proposal may be made after award without prior approval of the Contracting Officer.

(p) The Government will re-negotiate, as required, the terms and conditions of this contract if future Base Realignment and Closure

(BRAC) legislation or other Government decisions alter current plant status/missions. The Government shall retain the right to modify the mission of the facility; this may include, or result in, the potential closure of the facility.

(q) The Contractor is advised that contract changes, to include engineering changes, will be authorized only by the Contracting Officer

IAW the terms of the resultant contract. No other Government personnel, whether in the act of technical supervision or administration, is authorized to make any commitment or instruct the contractor to perform or terminate any work, or to incur any obligation.

(r) The ACC-RI Contracting Officer is the only individual authorized to issue orders under the resultant contract.

*** END OF NARRATIVE A0001 ***

4 143

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 CONTRACT DATA REQUIREMENTS LIST _______________________________

CDRLS SHALL NOT BE SEPARATELY PRICED

INFORMATION REQUIRED BY THE CDRLS SHALL BE DELIVERED

AS SPECIFIED IN EXHIBITS A AND B.

(End of narrative B001)

0002 FIRST ARTICLE _____________

ALL PROPOSED PRICES FOR FIRST ARTICLE TESTS SHALL BE

ENTERED INTO ATTACHMENT 0022.

(End of narrative B001)

0003 PRODUCTION QUANTITY ___________________

ALL PROPOSED UNIT PRICES FOR PRODUCTION QUANTITY

SHALL BE ENTERED INTO ATTACHMENT 0022.

IF REQUESTING INDEMNIFICATION, PROPOSED UNIT PRICES

SHALL ALSO BE ENTERED INTO ATTACHMENT 0025.

(End of narrative B001)

5 143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(a) The HSAAP price matrix is applicable to Government direct buys procured under the contract resulting from this solicitation, as well as third party orders that are received in support of systems contracts that utilize HSAAP components. Prices in support of third party orders shall not exceed the prices established in the HSAAP price matrix as a result of this competition, or if future unevaluated options are exercised and negotiated.

(b) All proposed prices shall be entered into the price matrices at Attachments 0022-0024. If the Offeror is requesting indemnification, Attachment 0025 shall be submitted as well.

(c) Unit prices under this acquisition shall not contain more than two (2) decimal places.

(d) Evaluation quantities and weights are included in the price matrix. The evaluation quantities and weights are estimates based on planning quantities at this time and are not obligatory under this contract; they are not binding and shall not be relied upon for execution purposes. Not meeting, or exceeding, the evaluation quantities should be expected and will not constitute revision of the price matrices. If the Government's requirements do not result in orders for the estimated evaluation quantities, it shall not constitute the basis for an equitable price adjustment. All orders placed against this contract are subject to availability of funds.

(e) Plant Wide Volume:

(1) Offerors shall propose unit prices under three total plant volume ranges. Total Evaluated Price will be based on the sum of the total values of each weight-adjusted Range. Ranges will be weighted as specified below. Annual range determinations will occur prior to the start of each ordering period. All orders placed during the applicable ordering period will be priced at the pre-determined range.

Total plant volume will be defined as the sum of all HSAAP SMCA direct, 3rd party USG, and commercial product orders (in lbs.)

anticipated to be placed within the ordering period. Range 2 will be the default range unless the Contracting Officer determines that total plant volume based on orders will be in Ranges 1 or 3. In such a case, the Contracting Officer will notify the Contractor of the range pricing to be utilized no later than 30 days prior to entering the ordering period. Delays in production of orders will not be considered during the Range determination process.

(2) At the end of each ordering period, actual orders will be compared with the volume range quantity utilized for the specific ordering period. If the sum of actual orders recevied exceeds upper boundary or falls below the lower boundary of the Range applied during that ordering period, a retroactive adjustment will be made base on the application of prices from the new Range. This adjustment will apply to all SMCA and 3rd party USG orders.

Plant-wide ranges and weighting factors are provided below.

Range 1: 0 to 4,500,000 Lbs. (10%)

Range 2: 3,500,001 to 11,500,000 (75%)

Range 3: 10,500,001 to 15,000,000 (15%)

(3) If anticipated annual orders exceed 15,000,000 lbs. for given ordering period, it will be considered a change condition and prices will be renegotiated accordingly.

(f) Economic Price Adjustment: The Government intends to share the risk of natural gas price volatility through an economic price adjustment. All matrix unit prices are subject to an economic price adjustment in accordance with Narrative I0002, Economic Price

Adjustment - Natural Gas.

(g) Combined Orders For Selected Products: The Government reserves the right to combine orders for the identified RDX based products for the purpose of product level quantity range assignment when those orders are placed on the same business day. The quantity band for any one product will be assigned based on the total combined order size for the group of relevant products. This will apply to orders for

SMCA direct products only. Individual orders that fall within product level Range 1 are exempt from consideration as components of a combined order. Product groups subject to the combined order feature are detailed below.

Selected RDX Based Products ___________________________

Composition B, Type 1, Grade A

Composition B4

Composition C-4

CXM-7

CXM-AF-5

CXM-AF-7

PBXN-10 Type 1

RDX, Type 2, Class 1

Selected TATB Based Products ____________________________

LX-17

PBX-9502

PBXN-12 Type I

PBXN-12 Type II

6 143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

PBXN-7 Type 1, Class 2

PBXN-7, Type 2

TATB Type 2 (DRY)

Selected IMX Based Products ___________________________

IMX-101

IMX-104

(h) Non-Competitive Contract Actions: No profit or fee will be allowed on the actual purchase of Natural Gas and the actual pruchase/lease of materials/equipment under non-competitive contract actions awarded under the contract resulting from this solicitation.

(i) FFP Delivery Orders (DO) and DO modifications will be utilized to place requirements for explosives based on the quantities and the ordering period within which the DO is placed.

(j) Production Base Support (PBS) efforts (inclusive of Modernization projects) will be negotiated and awarded via separately priced FFP or Cost Reimbursable efforts.

(k) Production Base Support (PBS) efforts (inclusive of Modernization projects) will be negotiated and awarded via separately priced FFP or Cost Reimbursable plus Fee (fixed or incentive) modifications. The successful awardee will not be permitted to charge costs associated with execution of the PWS scopes to Production Base Support efforts as direct costs or indirect allocations.

(l) New Facilities Under On-going Modernization Initiatives: The Government has shared the most current information available regarding scope, schedule, status, and various other items for the modernization projects being executed by the incumbent operator that will be completed subsequent to award of the contract resulting from this solicitation. The transition of these new facilities to the successful awardee will not constitute change conditions to this contract. Additionally, the Government has provided its best estimate of project competition dates, but actual completion dates may vary from these estimates. Delays in project completion will not constitute change conditions to this contract. However, the successful awardee will not be accountable for achieving post modernization capacity requirements until such time that the modernized facilities are transitioned to production.

(m) The Government may require modernization analysis, interface, engineering support, and the procurement of components and raw materials. Such efforts will be negotiated and awarded via separately priced FFP or Cost Reimbursable plus Fee (fixed or incentive) modifications.

(n) The contractor shall propose fair and reasonable prices for components and/or explosvies for third party contracts in support of any

Government contract.

(o) Prices for production items shall be compliant with the TDPs provided with the RFP. Any cost impact due to configuration change(s) during contract execution will be limited exclusively to the costs directly attributable to the change(s), require substantiation, and be negotiated in accordance with the Changes Clause (52.243-1, Changes-Fixed Price).

*** END OF NARRATIVE B0001 ***

INDUSTRIAL CAPACITY___________________

(a) The Contractor is required to retain a production capacity of 9,000,000 lbs. of RDX, 2,000,000 lbs. of HMX, and 5,000,000 lbs. of

IMX for the contract, until such time that new facilities under on-going modernization initiatives are transitioned to production. Upon transition of all on-going modernization projects to production, the Contractor will be required to retain a production capacity of

15,000,000 lbs. of RDX, 2,000,000 lbs. of HMX, and 6,000,000 lbs. of IMX.

(b) Retention of capacity is satisfied if the equipment and facilities comprising the family quantity capacities are (1) being operated for this contract or approved commercial and 3rd party/facility use production, and maintained in accordance with the contract or (2) idle, but adequately protected from physical degradation and there are resources trained and available to operate the equipment and facilities comprising the family quantity capacity. Retention of capacity is subject to Government audit.

(c) The family quantity capacities identified in this narrative are product mix dependent. The Contractor is required to accept orders up to these annual capacities unless the Contractor can provide supporting documentation that demonstrates that an individual product quantity cannot be met due to a specific capacity constraint tied to the processes necessary for that product, or specific capacity constraint(s) tied to interdependency of facilities used for all products on order to be produced in that year. Exemptions to meeting the requirements of this narrative are subject to written approval by the Contracting Officer.

*** END OF NARRATIVE B0002 ***

7 143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PROGRAM MANAGEMENT REVIEWS (PMR)________________________________

The Contractor shall support/host onsite quarterly Program Management Reviews (PMRs) at the request of JPEO A&A, HSAAP Government Staff, and/or Joint Munitions Command (JMC) in accordance with paragraph 3.3 of PWS 1 - Facility Plans, Strategies, and Analyses

*** END OF NARRATIVE C0001 ***

SUPPORT OF SUCCESSOR CONTRACT_____________________________

(a) In the last three (3) ordering periods of the contract, the operating contractor agrees to allow potential bidders to tour the facility on a non-interference basis during normal operations and/or during shut down, as requested by the Contracting Officer, to view the equipment and facilities. Equipment and facilities shall include Government Property as well as contractor property for which title will pass to the Government at the end of the contract.

(b) In addition to the intermediate delivery of technical data pursuant to Narrative H0001, the contractor shall provide other information and documentation describing current state of plant equipment and facilities, utilities, and other infrastructure (e.g., real property drawings), as requested by the Contracting Officer. Other information and documentation requested will largely be extracted from permanent and enduring records maintained pursuant to C0009, Safeguarding Permanent and Enduring Records.

(c) Contractor shall agree to the release of all information delivered to the Government under PWS and CDRLs requirements to prospective bidders in support of a successor competition. Such data shall include, but not be limited to, reports, assessments, analyses, and data pertaining to maintenance, production efficiency, utility consumption, and production, PWS, and modernization costs.

*** END OF NARRATIVE C0002 ***

NOTIFICATION OF REDUCTION IN FORCE OR FURLOUGH______________________________________________

In addition to the requirements of the U.S. Department of Labor Worker Adjustment and Retraining Notification Act, the contractor shall provide written notification to the Contracting Officer and the HSAAP ACO fourteen (14) days prior to enacting on a Reduction in Force which would affect twenty-five (25) or more employees. The contractor shall provide written notification to the Contracting Officer and the HSAAP ACO in the event of a furlough of twenty-five (25) or more employees for a period greater than five (5) workdays once the final quantity or quantity range of employees is determined for impact. Notification shall identify the number of employees affected and the effective date.

*** END OF NARRATIVE C0003 ***

MODERNIZATION SUPPORT FOR INCUMBENT OPERATING CONTRACTOR________________________________________________________

There will be multiple projects in execution by the incumbent contractor that will exceed its existing facility use contract period of performance end date of 31 December 2023 and will extend into the awardee's execution of this HSAAP contract. The awardee will be required to support the incumbent's execution of those modernization projects to final completion by entering into agreements with the incumbent that address, at a minimum, the following:

- Providing facility access, support facilities, and personnel necessary for project execution (facilities, maintenance, safety, health, and environmental, emergency response, security, property, etc.)

- Ensuring the incumbent receives on-site infrastructure and other provisions from office space, IT, vehicles for operation within the limited area, equipment, etc.

- Providing analytical lab and research and development support as necessary

- Ensuring availability of existing plant equipment (nutsches, transporters, etc.) as required to commissioning and transition facility until project acceptance

- Providing and including costs for utilities, energy usage, and other processes necessary for project execution (i.e., filtered water, river water, steam, electrical, plant air, waste water treatment, explosive waste disposal, treatment of explosive contaminated items, etc.), to include commissioning and transition to production

- Maintain and provide qualified operators to run new facilities

- Maintaining, coordinating the timing of, and providing raw materials/commissioning materials

- Providing required levels of intermediate materials and downstream facility processing to support incumbent commissioning requirements

- Utilize incumbent standards and procedures

8 143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE C0004 ***

Key Personnel:______________

Prior to replacing any key personnel as outlined in the offeror's proposal, Volume 1 - Production, the contractor shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the program.

*** END OF NARRATIVE C0005 ***

MATERIAL SAFETY DATA SHEETS___________________________

FAR 52.223-3, Hazardous Material Identification and Material Safety Data, indicates failure to submit the Material Safety Data Sheet

(MSDS) prior to award may result in the apparently successful Offeror being considered nonresponsible and ineligible for award. However, MSDSs are not required to be submitted with the Offerors' proposals but will be required from the successful Offeror subsequent to award.

*** END OF NARRATIVE C0006 ***

TECHNICAL DATA PACKAGE BASELINE_______________________________

The contractor shall provide a TDP Baseline Report identifying the TDP configuration of each individual item produced under the resultant contract (i.e. the production items included in Attachment 0022). The TDP configuration is defined by the contract and any subsequent modifications to the contract that result in configuration changes. The report shall be prepared as required by Exhibit A, CDRL TBD, and shall describe the TDP configuration (i.e., ECPs) in effect on the date that the report is issued. The TDP Baseline shall be for informational purposes only. The contract and any subsequent modifications shall take precedence.

*** END OF NARRATIVE C0007 ***

FACILITY SECURITY CLEARANCE REQUIREMENT_______________________________________

Requirements of this contract will require the contractor to have access to classified material up to and including the SECRET level. As such, a Facility Security Clearance at the SECRET level is required. Classified material must be handled in accordance with the current

National Industrial Security Program Operating Manual (NISPOM), DoD 5220.22-M, Department of the Army Information Security Program, AR

380-5, and any local security classification guidance and source documents. Remaining security requirements, to include handling of sensitive information, are stated on Attachment 0019, DD 254 - Contract Security Classification Specification.

*** END OF NARRATIVE C0008 ***

SAFEGUARDING PERMANENT AND ENDURING RECORDS___________________________________________

(a) The contractor shall implement a process to and shall capture, catalog, retain, and preserve records (which includes, but is not limited to data, technical data and documents) that are necessary for the operation and maintenance of HSAAP facilities, equipment, and systems to include present/past Research and Development activities; and contribute to the safety of HSAAP personnel and protection of

HSAAP property. Permanent records from this contract and from prior contracts shall be organized, maintained and archived in designated locations for use by both the Government and contractor representatives during this contract; and retained for use during successor contracts. The contractor shall maintain and provide an index (in electronic format) upon Government request describing the structure of records by type, title, designated storage media and locations. Records shall be organized such that they are recoverable; either through cataloging, indexing, and/or arrangement by building, area, equipment number, or other functional grouping. The requirement to comply with this narrative will be effective upon contract award. Preservation of historical records will include any documentation provided by the Government and/or transitioned by the incumbent to the successful awardee, as necessary.

(b) Permanent records shall include, but not be limited to, the following:

(1) Manuals, spec sheets, spare parts lists, maintenance procedures, engineering drawings and two and three dimensional computer-aided design models, supplied by vendors or original equipment manufacturers with new equipment, facility or utility systems and components.

(2) Procedures and drawings developed by the contractor and prior contractors or provided to the contractor or prior contractors for operation and maintenance of HSAAP property (real and personal) and processes to include production; drawings for construction, fabrication, and modification of property, including design analyses and records of significant deviations of as-built configurations from designs. This includes, but is not limited to: Standard Operating Procedures (SOPs), Manufacturing Instructions, Process

9 143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Instructions, Engineering Standards, Process Change Equipment Change records, calibration settings, Detailed Maintenance Procedures, Maintenance Job Aids, corrective and preventative maintenance logs, preventative maintenance tasks and schedules, Plant Protection

Standards, control systems documents and source code, test procedures, analytical test procedures, analytical compatibility test results, analytical test data, Electrical Transient Analyzer Program (ETAPS) models, Geospatial Information Systems (GIS) Data, Inventory Control System data and any equivalents.

(3) Safety data, analyses and test results supporting safety site plans and establishment of safe operating conditions; e.g., hazard analyses, results of barricade/hopper tests, sensitivity testing of energetics, testing of physical/software safeguards/interlocks, design or structural analyses. This includes, but is not limited to: relief calculations, Safety Action Logs, Process Hazards Analyses

(PHAs) (current and prior), Safety Data Sheets (SDS) Electrical Area Classifications and any equivalents.

(4) Manufacturing process and inspection equipment performance testing related to equipment capabilities, quality inspection and

AAIE.

(5) Results of compliance monitoring/testing/inspections required by federal, state, and local laws or regulations; permits; or stipulated in PWSs and/or clauses in this contract. This includes, but is not limited to: Environmental Action Logs and any equivalents.

(6) Analytical data, certificates of conformance, batch records and any equivalents.

(c) Designated representatives authorized by the Contracting Officer shall have access to permanent records during the course of this contract. Upon request by the ACO or Contracting Officer, the contractor shall provide copies of permanent records for use by the

Government.

(d) Procedures shall be established by the contractor to instruct personnel involved in receiving, developing, using or storing records on proper records accession and handling. Records stored electronically in software systems or file sharing sites shall not be degraded or lost due to software, server, or storage system migration/replacement.

(e) Consistent with other rights in technical data provisions of this contract (e.g., Narrative H0001, Ownership of Property), the

Government shall have no less than Government Purpose Rights to permanent records defined in this clause.

(f) The contractor shall provide access to data pursuant to this narrative to the Contracting Officer and representatives designated by the Contracting Officer during the course of this contract. The contractor must deliver all applicable technical data to the Government on an annual basis by no later than 31 December of each year and certify that it is free of all proprietary information. After the initial full transfer to the Government, subsequent transfers on the one-year cycle shall only be updated or new documents. Data shall be delivered in its current form as of the date of submission. The form/media to be used for data delivery (e.g., electronic, flat file) will be specified by the Contracting Officer at that time and must facilitate its transfer to, and use by, the Government. The contractors support and performance of this data deliverable will be provided at no additional cost to the Government and requests for data pursuant to the terms of this clause will not be subject to the changes clause.

*** END OF NARRATIVE C0009 ***

AGE OF ENERGETICS_________________

1. All energetic materials (to include inputs, intermediates and final formulations) presented to the Government for acceptance shall be no more than two years old from the date produced. Furthermore, energetic input and intermediate material (including purchased materials) used in the production of final explosive formulations shall be no more than two years old (unless a shorter time period is specified within the Item Specification / Technical Data Package (TDP). Note: the recrystallization process for HMX and RDX, either as final energetic material or energetic input in a formulation, is considered to be a new date of produced material.

The following are exclusions from the requirement above: Government Furnished Material and non-energetic material.

If Contractor wishes to present any final energetic material greater than two years in age to the Government for acceptance, or use any energetic input and intermediate material that is greater than two years in age (and not excluded from the requirement) in a final explosive formulation, approval must be provided through the cognizant contracting officer.

2. Blending and rework: When blending two final batches of explosives (i.e. a conforming PBXN-9 batch with another conforming PBXN-9 batch) or performing any rework on a non-conforming batch, the age of the original energetic input and/or intermediate material (i.e.

recrystallization process for HMX and RDX) cannot be greater than two years (unless a shorter time period is specified in the Item

Specification / TDP). Note: When blending, the date of manufacture for the blend shall be the recrystallization date of the oldest batch.

The following are exclusions from the requirement above: Government Furnished Material and non-energetic material.

If Contractor wishes to blend any energetic input (intermediate or final material) that is greater than two years in age and not

10 143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

excluded from the requirement, approval must be provided through the cognizant contracting officer.

*** END OF NARRATIVE C0010 ***

CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION_____________________________________________

(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the

Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, NORs, and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.

(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notices of Revision (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.

(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form

1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within

48 hours of submittal of the ECP.

(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre- production (formerly known as Request for Deviation (RFD)) or post- production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the

Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.

(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

*** END OF NARRATIVE C0011 ***

MODERNIZATION SUPPORT CAPABILITY REQUIREMENTS_____________________________________________

To maintain preparedness and meet the needs of the Warfighter, HSAAP requires infrastructure, facilities, and process sustainment and modernization projects for the explosives production mission. The Contractor shall be capable of providing engineering, design, architectural, procurement, construction and commissioning support for sustainment and modernization including:

- Acid production facilities - weak acetic acid recovery, glacial acetic acid to acetic anhydride conversion, NAC/SAC

- Nitration Bachmann RDX/HMX, DNAN and NTO with mixed nitrating acid, specialty high explosives

- Washing and filtration batch vacuum filtration, continuous indexed belt filter

- Recrystallization batch recrystallization of RDX and HMX, purification of NQ

- Formulation coating and blending operations to produce CXMs, PBXs, Comp B-3, etc.

- Melt casting - Comp B, Comp B-4, Cyclotol, IMX-104, etc.

- Drying kettle drying, bed drying, tray drying, vacuum drying

- Grinding fluid energy mill, pump grind

- Drumming and packaging

- Industrial wastewater treatment

- River water intake structures, pump systems, reservoir maintenance, plant-wide distribution, filtration systems, conservation controls, closed-loop cooling systems

- Explosive waste treatment - OB/OD, flashing furnaces (car bottom furnaces), Static Detonation Chamber

- Standard Operating Procedure development, Manufacturing Instruction/Process Instruction development, and Maintenance procedure

11 143

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

developmentThe explosives production capabilities encompass three families of energetics: HMX, RDX and IMX, as well as specialty explosives. The HSAAP contractor must have the modernization capability to execute technology insertion and facility and infrastructure upgrades. Projects will span the range from renovation and sustainment of existing facilities while maintaining production, to conceptualization, design and implementation of entirely new production facilities incorporating state of the art technologies.

Execution of this range of projects will require capabilities including:

- Project Development: Master Planning, Project Estimating, Trade Studies/Technology Evaluation/Analysis of Alternatives, Design

Basis, Manufacturing System Flexibility & Capability, and Permitting - Project Management: Cost and Schedule Management, Earned Value

Management, Cost as an Independent Variable, and Integrated Master Scheduling

- Facility Design: Systems Engineering, Design Charrettes, UFC Applicability and Compliance, Quantity/Distance Analysis, Sustainable

Design, Shell (Architectural, Structural, Interiors), Mechanical Systems, Electrical Systems, Fire Protection/Life Safety, Civil

Engineering, Wastewater Treatment, Sanitation, and BIM Modeling

- Process Engineering: Descriptions/Flow Diagrams/Equipment Specifications, Concept Design and Budget Development, Chemical Process

Design, Design for Service with Explosive Materials, Hazards Analysis, Facility Sizing, Construction and Layout for Process Functions, PLC & HMI Design & Programming, System Modeling and Throughput Analysis, Raw Material Handling/Storage, Material Flow, Finished Goods

Packaging and Shipping, 3D Models & Layout Drawings, Training using Virtual Reality Integrated Simulation, System Analytics

- Project Implementation: IFC Design, Shutdown / Turnaround Planning, Field Project Management, Equipment / Vendor Specifications, Procurement, Construction Management, Configuration Control, Validate Construction Integrity, Mechanical Completion Audits, Equipment

Troubleshooting, System Checkout, Commissioning, and Transition to Production

*** END OF NARRATIVE C0012 ***

HSAAP RESEARCH AND DEVELOPMENT CAPABILITY REQUIREMENTS______________________________________________________

The HSAAP contractor shall be capable of providing on-site Research & Development (R&D) capabilities at HSAAP to support new product development initiatives, scale-up of newly developed processes, and improvements to current production processes. This capability shall address required disciplines to perform R&D related activities related to explosive materials and intermediates.

Development and Scale Up: The contractor shall be capable of providing________________________ the personnel, knowledge, and processes to successfully execute the development of new explosive formulations, ingredients, synthesis methodologies and processes. This includes the scale-up of production processes for explosives and other critical ingredients, as well as particle size and crystal modification. The Contractor will engage with various DoD and third-party R&D customers, as necessary, and be capable of responding to solicitations for externally funded R&D activities.

Support to Production Operations: The Contractor shall be capable of supporting production of legacy explosive formulations and________________________________ ingredients using legacy processes. This may include improvements to legacy process, modifications to current formulations, technology insertion opportunities, and investigative functions when necessary.

Operation of the HSAAP Pilot Facilities: The Contractor shall be capable of operating HSAAPs various pilot facilities to execute scale-_______________________________________ up of explosive ingredients and formulations, transition of explosive ingredients and formulations to full-scale production, and external R&D customer support activities at HSAAP. Government owned equipment and infrastructure utilized in the pilot scale operations include various glass-lined reactors, various stainless steel formulation coating stills, a 4-inch fluid energy mill, pilot scale tray dryer, 16-inch stainless steel filter press, as well as other equipment items utilized in development activities.

Analytical Testing: The Contractor shall be capable of performing analytical testing in support of HSAAP manufacturing operations,__________________ investigative functions, and direct funded customer requests. These requirements may include energetic performance, thermal stability, sensitivity, identification/qualification, and physical measurement testing.

*** END OF NARRATIVE C0013 ***

MODERNIZATION SUPPORT FOR THIRD PARTY MODERNIZATION___________________________________________________

During execution of this HSAAP contract the Government reserves its right to award future modernization projects directly to the HSAAP contractor, through the U.S.

This is the start of the file's text. The full file is on GovTribe.