Amendment_0002_-_(18R5008).pdf
PDF 125 KB Posted
- Attached to
- Repair Electrical System, Phase V Federal contract opportunity
- Solicitation number
- W52P1J-18-R-5008
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18-R-5008-0004.pdf | ||
| 18-R-5008_Amendment_0003-.pdf | ||
| 18-R-5008_Amendment_0003.pdf | ||
| A21-1_Amendment_0001.pdf | ||
| A21_Attachment_0003_ACC-RI_POC_List.xlsx | XLSX spreadsheet | |
| A19_Attachment_0002_-_Davis_Bacon_Act_Wage_Determination.pdf | ||
| A21_Attachment_0001_Appendix_C_-_Sumittal_Form.pdf | ||
| A21_W52P1J-18-R-5008.pdf | ||
| A21_Attachment_0001__24_Apr_2018_Scope_of_Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GARRISON CONTRACTING BRANCH
CCRC-IG, JULIE CULLITON
BLDG 60, 3RD FLOOR
1 ROCK ISLAND ARSENAL
ROCK ISLAND IL 61299
2017-3914
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J18R5008
X 9B. DATED (SEE ITEM 11)
26-Apr-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-May-2018
CODE
GARRISON CONTRACTING BRANCH
CCRC-IG
BLDG 60, 3RD FLOOR
3055 RODMAN AVENUE
ROCK ISLAND IL 61299
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W52P1J
FACILITY CODECODE
EMAIL:TEL:
W52P1J18R5008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0002
The purpose for this Amendment is the following:
1. To answer the following Contractor questions:
Q1: Could you please provide the scale for all electrical drawings?
A1: There is a scale bar on the drawings and the native size is ANSI F.
Q2: Reference drawings 9 and 11 of 19:
Drawing 9 indicates feeders to be in 2" conduits and riser diagram indicates feeders to be in 2 1/2" conduits. Please clarify.
A2: The 2 1/2" conduits are the new conduits between the new switchboards and new pull box. See revised Appendix A. The revised drawings can be obtained by having an active Joint Certification Program (JCP) Account. You can obtain an active account by visiting http://public.logisticsinformationservice.dla.mil/jcp/search.aspx and submitting the necessary documents to the mailing address given. Once your account is active, you may request access to the restricted photos on FedBizOpps (www.fbo.gov).
Q3: Note 16 on drawing 2 indicates new switchboard with 1000a bus and 800a main. Riser diagram on drawing 11 indicates new switchboard with 600a bus and 600a main. Please clarify.
A3: The 240V switchboard inside BLDG 67 shall be 1000Amp bus rating with 600Amp main fused switch.
See revised Appendix A. The revised drawings can be obtained by having an active Joint Certification Program (JCP) Account. You can obtain an active account by visiting http://public.logisticsinformationservice.dla.mil/jcp/search.aspx and submitting the necessary documents to the mailing address given. Once your account is active, you may request access to the restricted photos on
Q4: Note 50 on drawing 3 indicates new switchboard to have 400a bus. Riser diagram on drawing 15 indicates switchboard with 225a bus. Please clarify.
A4: It is 400Amp Bus rating 120/208V. See revised Appendix A. The revised drawings can be obtained by having an active Joint Certification Program (JCP) Account. You can obtain an active account by visiting http://public.logisticsinformationservice.dla.mil/jcp/search.aspx and submitting the necessary documents to the mailing address given. Once your account is active, you may request access to the restricted photos on
Q5: What will be the protocol for running duct banks across roadways?
W52P1J18R5008
A5: All work will be in accordance with the scope of work.
Q6: What will be the protocol for the removal of asbestos from the medium voltage cable?
A6: The contractor is responsible for removing the asbestos in accordance with the scope of work and all state and federal regulations.
Q7: Please describe means and methods of getting a truck in to remove transformers.
A7: It is the contractors responsibility to determine what is required to remove the equipment in accordance with the scope of work.
Q8: Paragraph 2.3.1.1 of the scope says " The construction area may be used as a staging area". This work is in multiple areas. Can you clarify further as to where truck and materials may be staged?
A8: The staging area will be identified once the contract is awarded and notice to proceed is provided. If available the court yard of Bldg 64 will be utilized as the staging area.
Q9: How will shut downs be coordinated?
A9: Any shut down coordination must be coordinated with the COR.
2. To provide photos taken at the site visit conducted on 8 May 2018. These photos can be obtained by having an active Joint Certification Program (JCP) Account. You can obtain an active account by visiting http://public.logisticsinformationservice.dla.mil/jcp/search.aspx and submitting the necessary documents to the mailing address given. Once your account is active, you may request access to the restricted photos on FedBizOpps (www.fbo.gov).
3. The new POC for this project is Jill Veloz, jill.c.veloz.civ@mail.mil, 309-782-2895.
3. All other terms and conditions remain unchanged.
(End of Summary of Changes)
File details come from the government source that posted it.