This Contract Data Requirements List (CDRL) outlines thirteen data items required under an indefinite-delivery, indefinite-quantity production contract for small practice bombs including the MK76-5 Twin Pack Practice Bomb, BDU-33 D/B Practice Bomb, and 25 lb. Bomb Suspension Lug. Key deliverables include a Quality Program Plan due within 150 days of award, Statistical Process Control and Inspection and Test Plans also due within 150 days, a First Article Test Plan within 120 days, and Lot Acceptance and Failure Summary Reports. Submission deadlines and distribution lists are provided for each data item. The Army Materiel Command Joint Munitions Command will oversee the contract as a 100% small business set-aside solicited under Solicitation Number W52P1J18R0143.

View the file

Other files

File Type Posted
W52P1J18R0143 Amendment 0002.pdf PDF
W52P1J18R0143 Amendment 0003.pdf PDF
ATTACHMENT 0012 - Industry Questions and Answers 02 JAN 2020.pdf PDF
ATTACHMENT 0002 - Scheduled Government Furnished Property.pdf PDF
ATTACHMENT 0012 - Industry Quesstions and Answers.pdf PDF
W52P1J-18-R-0143 Amendment 0001.pdf PDF
B08 - ATTACHMENT 0008 - QUALITY REQUIREMENTS SOW.pdf PDF
B08 - ATTACHMENT 0001 - Price Matrix 10-29-2019.xlsx XLSX spreadsheet
B08 - ATTACHMENT 0007 - OPSEC PLAN SAMPLE.pdf PDF
B08 - ATTACHMENT 0011 - QUALITY ASSURANCE PROVISIONS (QAP) MK76-5 - 2185734 REV D dated 13AUG2019 .pdf PDF
B08 - EXHIBIT B - CONTRACT DATA REQUIREMENTS LIST (CDRL) - BDU-33.pdf PDF
B08 - ATTACHMENT 0004 - List of Addresses for CDRLs.pdf PDF
B08 - ATTACHMENT 0010 - Past Performance Questionnaire.pdf PDF
B08 - ATTACHMENT 0003 - GUIDANCE ON DOCUMENTATION OF CONTRACT REQUIREMENTS LIST (CDRL).pdf PDF
B08 - ATTACHMENT 0005 - QUALITY ASSURANCE PROVISIONS (QAP) 25LB Lug - 8631481 REV B (1).pdf PDF
W52P1J18R0143.pdf PDF
B08 - EXHIBIT A - CONTRACT DATA REQUIREMENTS LIST (CDRL) - MK76-5.pdf PDF
B08 - ATTACHMENT 0002 - Scheduled Government Furnished Property.pdf PDF
B08 - ATTACHMENT 0006 - OPSEC SOW.pdf PDF
B08 - ATTACHMENT 0009 - ASSIST Instructions.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

MISC

25LB Suspension Lug UG6B06UJHI

C001 Ammunition Data Card (ADC) Data Input

DI-MISC-80043 (Current Revision) Section: C, MIL-STD-1168 AMSJM-QAP

NO

B

ASREQ ASREQ

A N/A ASREQ

WARP

08/13/2019

0 1 0

Lot Shipment 0 2 0

BLK 12: Sample ADC shall be submitted into the Munitions History Program (MHP) system and approved prior to First Article Testing (FAT) or initiation of production if FAT is not required. ADCs shall be prepared IAW MIL-STD-1168 by accessing the data repository system WARP on the Munitions History Program website at https://mhp.redstone.army.mil/.

BLK 10/13: An ADC shall be submitted with each lot.

Hard copy ADC provided with lot shipments shall be generated from the WARP and signed/dated by the Government Agency Responsible for Acceptance (GARA).

When ballistic test are required, one hard copy ADC generated from the WARP and signed/dated by the GARA shall be sent to the Proving Ground with sample shipment, plus an additional signed/dated, hard copy provided to the Proving Ground by mail.

If the critical characteristic requirement is in the contract, the critical characteristic information fields in WARP for the ADC shall be completed for each lot.

Mail to Dest 0 2 0

0 5 0

PIFER.BEN.A.13

96556517

Digitally signed by

PIFER.BEN.A.1396556517

Date: 2018.08.13 13:50:06 -05'00'

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

MISC

25LB Suspension Lug UG6B06UJHI

C002 Quality Program Plan (QPP) N/A

DI-QCIC-81722 (Current Revision) Section: E AMSJM-QAP

LT

B

ONE/R 150DAC

A N/A ASREQ

AMSJM-QAP

08/13/2019

0 1 0

ACC-RI 0 1

BLK 12: Quality Program Plan (QPP) shall be submitted no later than 150 calendar days after contract award. The Government shall provide response within 30 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days. Approval is required prior to first article test (FAT), if FAT is required, or prior to initiation of production. Disposition will be provided by the Procuring Contracting Officer (PCO).

BLK 13: Submit updates/revisions for review and approval prior to implementation.

BLK 14: Submit via email or DOD SAFE (https://Secure.apps.mil/).

Specific email addresses for the distribution list will be provided after contract award.

SFAE-AA-JB 0 1 0

AFLCMC/EBHCB 0 1 0

0 4 0

PIFER.BEN.A.13

96556517

Digitally signed by

Date: 2018.08.13 13:50:31 -05'00'

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

MGMT

25LB Suspension Lug UG6B06UJHI

C003

DI-MGMT-81987 (Current Revision)

Statistical Process Control (SPC) N/A

Section: E AMSJM-QAP

LT

B

ONE/R 150DAC

A N/A ASREQ

AMSJM-QAP

08/13/2019

0 1 0

ACC-RI 0 1 0

BLK 12: The general plan shall be submitted no later than 150 calendar days after contract award. The final detailed plan shall be submitted 30 after first article test (FAT) approval, if FAT is required, or 30 days after initiation of production.. Approval of the general plan is required prior to (FAT), or initiation of production if FAT is not required. The Government requires 30 days for review. Disposition of the general and detailed sections will be provided through the procuring contracting officer (PCO).

BLK 13: If further revisions are necessary, the contractor shall have 15 calendar days to provide revisions and the Government shall review and provide disposition within 15 calendar days of receipt.

BLK 14: Submit via email or DOD SAFE (https://Secure.apps.mil/).

Specific email addresses for the distribution list will be provided after contract award.

AFLCMC/EBHCB 0 1 0

SFAE-AA-JB 0 1 0

0 4 0

PIFER.BEN.A.139

6556517

Digitally signed by

Date: 2018.08.13 13:51:00 -05'00'

(1 Data Item)

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

QCIC

25LB Suspension Lug UG6B06UJHI

C004 Measurement System Evaluation (MSE) – Measurement and Inspection Equipment System Design Documentation for Acce

Measurement System Evaluation/Acceptance Inspection Equipment (MSE/AIE)

DI-QCIC-81960 (Current Revision) Section: E AMSJM-QAP

DD

B

ONE/R 120DAC

A N/A ASREQ

16. REMARKS

BLK 12: The Contractor shall submit a completed AIE package no later than

(120) calendar days after contract award. The AIE shall be approved prior to First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract. The PCO will provide disposition within (45) calendar days of final AIE package receipt.

BLK 13: If further revisions are necessary, the Contractor shall have (30) calendar days to generate them and the Government shall have (30) calendar days to review and respond to them. The approved AIE shall be available for First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract.

If Contractor revises a previously Government accepted AIE for this contract, the revised AIE must be submitted to the Government for review and approval.

Approval must be granted before AIE is used for acceptance of product. The Government will respond within (30) calendar days.

The Contractor shall notify the responsible Government technical agency a minimum of (30) calendar days prior to acceptance (prove out) testing for AAIE.

BLK 14: Submit via email or DOD SAFE (https://Secure.apps.mil/).

Specific email addresses for the distribution list will be provided after contract award.

An MSE Review Guide is available to assist Contractors on the ARDEC Public Website (http://www.ardec.army.mil/organizations/QESA/) in the application of the MSE Clause. The MSE Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the MSE Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the MSE clause itself nor into the terms and conditions of any underlying contract which contains the MSE clause.

AMSJM-QAP

08/13/2019

0 1 0

ACC-RI 0 1 0

AFLCMC/EBHCB 0 1 0

SFAE-AA-JB 0 1 0

0 4 0

PIFER.BEN.A.1396

556517

Digitally signed by

Date: 2018.08.13 13:51:17 -05'00'

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

NDTI

25LB Suspension Lug UG6B06UJHI

C005 First Article Qualification Test Plan and Procedure N/A

DI-NDTI-81307 (Current Revision) Section: E AMSJM-QAP

LT

B

ASREQ 120DAC

A N/A ASREQ

ACC-RI

08/13/2019

0 1 0

AMSJM-QAP 0 1 0

BLK 12: First Article Test Plans shall be submitted no later than 120 calendar days after contract award. Government shall provide response within 30 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days.

Disposition will be provided by the procuring contracting officer (PCO).

Approval of the plan shall be obtained prior to FAT.

BLK 14: Submit via email or DOD SAFE (https://Secure.apps.mil/).

Specific email addresses for the distribution list will be provided after contract award.

AFLCMC/EBHCB 0 1 0

SFAE-AA-JB 0 1 0

0 4 0

PIFER.BEN.A.139

6556517

Digitally signed by

Date: 2018.08.13 13:51:33 -05'00'

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

NDTI

25LB Suspension Lug UG6B06UJHI

C006 Test/Inspection Reports First Article Test Report (FATR)

DI-NDTI-80809 (Current Revision) Section: E AMSJM-QAP

LT

B

ASREQ 270DAC

A N/A ASREQ

AMSJM-QAP

08/13/2019

0 1 0

ACC-RI 0 1 0

BLK 12: The First Article Test report shall be submitted with QAR findings on DD Form 1222. The FATR shall be submitted 270 calendar days after contract award and no later than 30 calendar days after completion of the FAT. The Government requires 30 calendar days for review. Disposition of the FAT report will be provided through the Procuring Contracting Officer.

If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days. PCO approval of the FATR shall be obtained prior to start of production.

BLK 14: Submit electronically via email or DOD SAFE (https:// Secure.apps.mil/).

Specific email addresses for the distribution list will be provided after contract award.

SFAE-AA-JB 0 1 0

AFLCMC/EBHCB 0 1 0

0 4 0

PIFER.BEN.A.13965

56517

Digitally signed by

Date: 2018.08.13 13:51:50 -05'00'

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

NDTI

25LB Suspension Lug UG6B06UJHI 1.

C007 Test/Inspection Reports Lot Acceptance Test Report

DI-NDTI-80809 (Current Revision) Section: E AMSJM-QAP

NO

B

ASREQ 30DATC

N/A N/A ASREQ

WARP

08/13/2019

0 1 0

DCMA 0 1

BLK 10/12: Lot Acceptance Test Reports (LATRs) shall be submitted for each lot and contain all inspection records of all classified characteristic samples and any other tests required for each lot per the contract.

LATRS shall be submitted 30 calendar days after completion of LAT.

BLK 14: LATRs shall be submitted by accessing the worldwide ammunition data card repository program which is located on the munitions history program website at https://mhp.redstone.army.mil/.

0 2 0

PIFER.BEN.A.1396

556517

Digitally signed by

Date: 2018.08.13 13:52:08 -05'00'

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

SESS

25LB Suspension Lug

C008

2. TITLE OF DATA ITEM

FAILURE SUMMARY AND ANALYSIS REPORT N/A

DI-SESS-80255 (Current Revision) Section: E AMSJM-QAP

LT

B

ASREQ ASREQ

A N/A ASREQ

AMSJM-QAP

08/13/2019

0 1 0

ACC-RI 0 1

BLK 10/12/13: Contractor shall notify the the addressee list in block 14 via email within 24 hours after the occurrence of a failure during acceptance testing, including but not limited to, any failures during FAT/LAT and any destructive/nondestructive test failures. Formal submittal shall be no later than 10 calendar days after reported failure. Final report shall be submitted no later than 30 calendar days after determining/conducting root cause/failure analysis.

The Government will provide a response within 15 calendar days of initial submission. If further revisions are necessary, the contractor shall have 15 calendar days to provide revisions. Disposition will be provided by the procuring contracting officer (PCO).

BLK 14: Submit via email or DOD SAFE (https://Secure.apps.mil/).

Specific email addresses for the distribution list will be provided after contract award.

AFLCMC/EBHCB

SFAE-AA-JB

0 2 0

PIFER.BEN.A.139655

Digitally signed by

Date: 2018.08.13 13:52:29 -05'00'

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

QCIC

25LB Suspension Lug

C009 Inspection and Test Plan (ITP) N/A

DI-QCIC-81110 (Current Revision) Contract Section E (SEE BLK 16) AMSJM-QAP

LT

B

ONE/R 150DAC

A N/A ASREQ

AMSJM-QAP

08/13/2019

0 1 0

ACC-RI 0 1

BLK 5: The ITP shall be in accordance with the quality assurance provision

(QAP).

BLK 12: The ITP shall be submitted no later than 150 calendar days after contract award. The Government requires 30 calendar days for review.

Disposition of the ITP will be provided through the procuring contracting officer (PCO). If further revisions are required, the contractor shall have 15 calendar days to provide revisions and the Government shall provide disposition within 15 calendar days. The ITP shall be approved prior to first article test (FAT), if FAT is required, or prior to initiation of production.

BLK 13: Submit update/revisions for review and approval prior to implementation.

BLK 14: Submit via email or DOD SAFE (https://Secure.apps.mil/).

Specific email addresses for the distribution list will be provided after contract award.

AFLCMC/EBHCB

SFAE-AA-JB

0 2 0

PIFER.BEN.A.13965

56517

Digitally signed by

Date: 2018.08.13 13:52:49 -05'00'

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

UG6B06UJHI

F. CONTRACTOR D. SYSTEM/ITEM

25Lb Suspension Lug

1. DATA ITEM NO.

C010

2. TITLE OF DATA ITEM

REQUEST FOR VARIANCE (RFV)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80640D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

RDAR-EIS-PD

7. DD 250 REQ.

LT

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. THE PREFERRED

METHOD FOR SUBMITTAL IS DD FORM 1694 LOCATED AT http:// www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil; COPY FURNISH

THIS SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

ACO 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

8/14/2018

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 1 of 5 Pages

K. Mosher for SDMO, RDAR-EIS-PD

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

UG6B06UJHI

F. CONTRACTOR D. SYSTEM/ITEM

25Lb Suspension Lug

1. DATA ITEM NO.

C011

2. TITLE OF DATA ITEM

ENGINEERING CHANGE PROPOSAL (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80639D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

RDAR-EIS-PD

7. DD 250 REQ.

LT

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. THE PREFERRED

METHOD FOR SUBMITTAL IS DD FORM 1692 LOCATED AT http:// www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil; COPY FURNISH THIS

SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

ACO 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

8/14/2018

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 2 of 5 Pages

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 3 of 5 Pages

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

UG6B06UJHI

F. CONTRACTOR D. SYSTEM/ITEM

25Lb Suspension Lug

1. DATA ITEM NO.

C012

2. TITLE OF DATA ITEM

NOTICE OF REVISION (NOR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80642D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

RDAR-EIS-PD

7. DD 250 REQ.

LT

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. THE PREFERRED

METHOD FOR SUBMITTAL IS DD FORM 1695 LOCATED AT http:// www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil; COPY FURNISH THIS

SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

ACO 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

8/14/2018

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 4 of 5 Pages

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

UG6B06UJHI

F. CONTRACTOR D. SYSTEM/ITEM

25Lb Suspension Lug

1. DATA ITEM NO.

C013

2. TITLE OF DATA ITEM

Operations Security (OPSEC) Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-MGMT-80934C

5. CONTRACT REFERENCE

OPSEC SOW

6. REQUIRING OFFICE

AMSJM-FP/G2

7. DD 250 REQ.

XX

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

ASREQ

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DELETE REFERENCE 'APPLYING OPSEC TO U.S. GOVERNMENT

CONTRACTS'. REPLACE WITH REFERENCE 'SAMPLE ACQUISITIONS

OPSEC PLAN'. 10 CALENDAR DAYS REQUIRED FOR GOVERNMENT

REVIEW AND APPROVAL. *30 CALENDAR DAYS AFTER THE

CONTRACTING OFFICER PROVIDES THE LIST OF KNOWN CRITICAL

INFORMATION (CI)/THREAT INFORMATION. ** RESUBMIT 10

CALENDAR DAYS AFTER GOVERNMENT REVIEW. SUBMIT

ELECTRONICALLY TO usarmy.ria.jmc.mbx.OPSEC-FD@mail.mil.

JMC OPSEC 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

8/14/2018

I. APPROVED BY J. DATE

FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM -

Technical Manual; Other - other category of data, such as

"Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of

CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the

Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items

12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The

Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423 (BACK)

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the

Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form

1423.

INSTRUCTIONS FOR COMPLETING DD FORM 1423

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form

1423.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the

Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD

Form 1423 at no cost.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the

Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

5Page 5 of

QA_CDRL_UG6B06UJHI!
UG6B06UJHI_ppi_CDRL