B08 - EXHIBIT A - CONTRACT DATA REQUIREMENTS LIST (CDRL) - MK76-5.pdf
PDF 2 MB Posted
- Attached to
- MK76-5 Twin Pack Practice Bomb, BDU-33 D/B Practice Bomb, and 25 lb. Bomb Suspension Lug
- Solicitation number
- W52P1J18R0143
About this file
This Request for Proposal (RFP) solicits proposals for the production of small practice bombs including the MK76-5 Twin Pack Practice Bomb, BDU-33 D/B Practice Bomb, and 25 lb. Bomb Suspension Lug. The RFP will be competed as a 100% small business set-aside using a best value approach. The applicable NAICS code is 332993 for Ammunition Manufacturing with a size standard of 1,500 employees. The solicitation is seeking proposals for an Indefinite-Delivery Indefinite-Quantity production contract with Firm Fixed Pricing to be awarded by the Department of the Army Materiel Command Joint Munitions Command.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001 AMMUNITION DATA CARD
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MISC-80043B SECTION C, MIL-STD-1168 AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
NO ASREQ (SEE 16) ASREQ (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
N/A N/A ASREQ (SEE 16) Reg Repro
16. REMARKS DCMA-MCWB (QAR) 0 1 0
BLK 10, 12, 13: AMMUNITION DATA CARDS (ADC) SHALL BE
PREPARED IAW MIL-STD-1168, SECTION C, AND BY ACCESSING THE
WORLDWIDE AMMUNITION DATA REPOSITORY PROGRAM (WARP),
WHICH IS LOCATED AT https://mhp.redstone.army.mil.
BLK 14: SUBMIT VIA THE INTERNET OR MAIL A CD ROM (PC FORMAT)
IN ACCORDANCE WITH CDRL DISTRIBUTION LIST.
*HARD COPY ADC PROVIDED WITH LOT SHIPMENTS SHALL BE
GENERATED FROM THE WARP PROGRAM AND SIGNED AND DATED
BY THE GOVERNMENT AGENCY RESPONSIBLE FOR ACCEPTANCE
(GARA).
**WHEN BALLISTIC TESTS ARE REQUIRED, ONE HARD COPY
GENERATED FROM THE WARP PROGRAM SIGNED AND DATED BY THE
GARA SHALL BE SENT TO THE PROVING GROUND WITH SAMPLE
SHIPMENT, PLUS AN ADDITIONAL SIGNED HARD COPY PROVIDED TO
THE PROVING GROUND BY MAIL.
WARP 0 1 0
LOT SHIPMENT* 0 2 0
MAIL TO DEST** 0 2 0
(SEE BLK 16)
15. TOTAL 0 6 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
MISC
Jennifer Diaz
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A002 QUALITY PROGRAM PLAN (QPP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81722 SECTION E (SEE BLK 16) AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ONE/R (SEE 16) 150 DAC (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-QAP 0 1 0 16. REMARKS
BLK 5: THE QUALITY PROGRAM PLAN (QPP) SHALL DOCUMENT THE
CONTRACTOR'S IMPLEMENTATION OF A QUALITY SYSTEM IN
ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP).
BLK 10, 12: THE QPP SHALL BE SUBMITTED NO LATER THAN 150
CALENDAR DAYS AFTER CONTRACT AWARD. THE GOVERNMENT
REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE QPP WILL BE
PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER (PCO).
IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT
SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF
RECEIPT. THE QPP SHALL BE APPROVED PRIOR TO FAT, IF FAT IS
REQUIRED, OR PRIOR TO INITIATION OF PRODUCTION.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION.
BLK 14: SUBMIT VIA EMAIL IN ACCORDANCE WITH CDRL
DISTRIBUTION LIST OR DOD SAFE (https://Secure.apps.mil/).
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 7 0
H. DATE I. APPROVED BY J. DATEG. PREPARED BY
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
QCIC
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A003 STATISTICAL PROCESS CONTROL (SPC) PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-81987 SECTION E AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ONE/R (SEE 16) 150 DAC (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-QAP 0 1 0 16. REMARKS
BLK 10, 12: THE GENERAL PLAN SHALL BE SUBMITTED NO LATER
THAN 150 CALENDAR DAYS AFTER CONTRACT AWARD. THE FINAL
DETAILED PLAN SHALL BE SUBMITTED 30 DAYS AFTER FAT
APPROVAL, IF FAT IS REQUIRED, OR 30 DAYS AFTER INITIATION OF
PRODUCTION. THE GOVERNMENT REQUIRES 30 DAYS FOR REVIEW.
DISPOSITION OF THE GENERAL AND DETAILED SECTIONS WILL BE
PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER (PCO).
IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT
SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF
RECEIPT.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION.
BLK 14: SUBMIT VIA EMAIL IN ACCORDANCE WITH CDRL
DISTRIBUTION LIST OR DOD SAFE (https://Secure.apps.mil/).
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
MGMT
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A004 MEASUREMENT SYSTEM EVALUATION (MSE) –
MEASUREMENT AND INSPECTION EQUIPMENT
SYSTEM DESIGN DOCUMENTATION FOR
ACCEPTANCE OF PRODUCT
ACCEPTANCE INSPECTION EQUIPMENT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81960 SECTION E (MSE CLAUSE) NSWC (MS-21)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 14. DISTRIBUTION
LT ONE/R (SEE 16)
12. DATE OF FIRST SUBMISSION
120 DAC (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
NSWC (MS-21) 0 1 0 16. REMARKS
BLK 10, 12: THE CONTRACTOR SHALL SUBMIT A COMPLETED
ACCEPTANCE INSPECTION EQUIPMENT (AIE) PACKAGE NO LATER
THAN 120 CALENDAR DAYS AFTER CONTRACT AWARD. THE
GOVERNMENT WILL PROVIDE DISPOSITION WITHIN 45 DAYS AFTER
FINAL AIE PACKAGE RECEIPT.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR
SHALL HAVE 30 DAYS TO GENERATE REVISIONS AND THE
GOVERNMENT SHALL HAVE 30 DAYS TO REVIEW AND RESPOND.
THE APPROVED AIE SHALL BE AVAILABLE FOR FAT, IF FAT IS
REQUIRED, PRODUCTION, AND/OR ALL ACCEPTANCE OF PRODUCT
UNDER THE CONTRACT. IF CONTRACTOR REVISES A PREVIOUSLY
GOVERNMENT-ACCEPTED AIE FOR THIS CONTRACT, THE REVISED
AIE MUST BE SUBMITTED TO THE GOVERNMENT FOR REVIEW AND
APPROVAL. GOVERNMENT APPROVAL MUST BE GRANTED BEFORE
AIE IS USED FOR ACCEPTANCE OF PRODUCT. THE GOVERNMENT
WILL RESPOND WITHIN 30 DAYS AFTER RECEIPT OF AIE.
THE CONTRACTOR SHALL NOTIFY THE RESPONSIBLE GOVERNMENT
TECHNICAL AGENCY WITHIN A MINIMUM OF 30 DAYS PRIOR
TO ACCEPTANCE (PROVE OUT) TESTING.
BLK 14: SUBMIT VIA EMAIL IN ACCORDANCE WITH CDRL
DISTRIBUTION LIST OR DOD SAFE (https://Secure.apps.mil/).
AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 8 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Designed using Perform Pro, WHS/DIOR, Aug 96
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A006 TEST/INSPECTION REPORT FIRST ARTICLE TEST REPORT (FATR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B SECTION E AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ONE/R (SEE 16) 270 DAC (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-QAP 0 1 0 16. REMARKS
BLK 10, 12: THE FIRST ARTICLE TEST (FAT) REPORT SHALL BE
SUBMITTED WITH QAR FINDINGS ON DD FORM 1222. FAT REPORT
SHALL BE SUBMITTED 270 DAYS AFTER CONTRACT AWARD. THE
GOVERNMENT REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE
FAT REPORT WILL BE PROVIDED THROUGH THE PCO. FAT MUST BE
APPROVED PRIOR TO PRODUCTION.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR
SHALL HAVE 15 DAYS TO GENERATE REVISIONS AND THE
GOVERNMENT SHALL HAVE 15 DAYS TO REVIEW AND RESPOND.
BLK 14: SUBMIT VIA EMAIL IN ACCORDANCE WITH CDRL
DISTRIBUTION LIST OR DOD SAFE (https://Secure.apps.mil/).
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
NDTI
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A007 TEST/INSPECTION REPORT LOT ACCEPTANCE TEST REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80809B (SEE BLK 16) SECTION E DCMA-MCWB (QAR)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ (SEE 16) ASREQ (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
16. REMARKS DCMA-MCWB (QAR) 0 1 0
BLK 4: LOT ACCEPTANCE TEST (LAT) REPORTS SHALL CONTAIN ALL
INSPECTION RECORDS OF CLASSIFIED CHARACTERISTIC SAMPLES
AND ANY OTHER TESTS REQUIRED FOR EACH LOT PER THE
CONTRACT.
BLK 10, 12, 13: SUBMISSION OF LAT REPORTS AND PRODUCTION
ACCEPTANCE TEST REPORTS SHALL BE NO LATER THAN 30 DAYS
AFTER LAT. THE QAR WILL PROVIDE DISPOSITION OF
LOT/PRODUCTION ACCEPTANCE TEST REPORTS.
BLK 14: LAT REPORTS SHALL BE SUBMITTED BY ACCESSING THE
WORLDWIDE AMMUNITION DATA CARD REPOSITORY PROGRAM
(WARP) WHICH IS LOCATED ON THE MUNITIONS HISTORY PROGRAM
(MHP) WEBSITE AT: https://mph.redstone.army.mil/. SUBMIT
ELECTRONICALLY UNLESS OTHERWISE SPECIFIED.
WARP 0 1 0
(SEE BLK 16)
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 3. SUBTITLE
A008
2. TITLE OF DATA ITEM
FAILURE SUMMARY AND ANALYSIS REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80255A SECTION C (SEE BLK 16) AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ (SEE 16) ASREQ (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-QAP 0 1 0 16. REMARKS
BLK 5: THE FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT
(FACAR) SHALL BE IN ACCORDANCE WITH THE QUALITY ASSURANCE
PROVISION (QAP).
BLK 10, 12, 13: CONTRACTOR SHALL NOTIFY NAWCWD (QA),
NAWCWD (685200D), AMSJM-QAP, AND THE PCO VIA EMAIL WITHIN 24
HOURS AFTER THE OCCURRENCE OF A FAILURE DURING
ACCEPTANCE TESTING; INCLUDING, BUT NOT LIMITED TO, ANY
FAILURES DURING FAT/LAT AND ANY DESTRUCTIVE OR
NONDESTRUCTIVE TEST FAILURES. FORMAL SUBMITTAL SHALL BE
NO LATER THAN 10 DAYS AFTER REPORTED FAILURE. FINAL REPORT
SHALL BE SUBMITTED NO LATER THAN 30 DAYS AFTER
DETERMINING/CONDUCTING ROOT CAUSE FAILURE ANALYSIS.
BLK 14: SUBMIT VIA EMAIL IN ACCORDANCE WITH CDRL
DISTRIBUTION LIST OR DOD SAFE (https://Secure.apps.mil/).
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
SESS
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A009 INSPECTION AND TEST PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-QCIC-81110 SECTION E (SEE BLK 16) AMSJM-QAP
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ONE/R (SEE 16) 150 DAC (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
AMSJM-QAP 0 1 0 16. REMARKS
BLK 5: THE INSPECTION AND TEST PLAN (ITP) SHALL BE IN
ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP).
BLK 10, 12: THE ITP SHALL BE SUBMITTED NO LATER THAN 150
CALENDAR DAYS AFTER CONTRACT AWARD. THE GOVERNMENT
REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE ITP WILL BE
PROVIDED THROUGH THE PROCURING CONTRACTING OFFICER (PCO).
IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT
SHALL REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS. THE ITP
SHALL BE APPROVED PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR
TO INITIATION OF PRODUCTION.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION.
BLK 14: SUBMIT VIA EMAIL IN ACCORDANCE WITH CDRL
DISTRIBUTION LIST OR DOD SAFE (https://Secure.apps.mil/).
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 7 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A010 REQUEST FOR VARIANCE (RFV)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80640D (SEE BLK 16) SECTION C NAWCWD (685200D)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ Reg Repro
NAWCWD (685200D) 0 1 0 16. REMARKS
BLK 4: DELETE PARAGRAPH 2B AND 2C AND INCLUDE ADEQUATE
DATA/ANALYSIS/TESTING TO SUPPORT THE REQUEST IN THE
CONTENT OF THE RFV. THE CONTRACTOR SHALL PREPARE AND
SUBMIT A RFV FOR EACH VARIANCE ON DD FORM 1694, LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT VIA EMAIL IN ACCORDANCE WITH CDRL
DISTRIBUTION LIST OR DOD SAFE (https://Secure.apps.mil/).
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 5 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A011 ENGINEERING CHANGE PROPOSAL (ECP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80639D (SEE BLK 16) SECTION C NAWCWD (685200D)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ Reg Repro
NAWCWD (685200D) 0 1 0 16. REMARKS
BLK 4: DELETE PARAGRAPH 2B AND 2C. SUBMIT TEXT FILES IN
GOVERNMENT COMPATIBLE MICROSOFT WORD AND VIEW FILES IN
GOVERNMENT COMPATIBLE ADOBE ACROBAT. FOR DRAWINGS,
SUBMIT PDF VIEW FILES IN GOVERNMENT COMPATIBLE ADOBE
ACROBAT.
THE CONTRACTOR SHALL PREPARE AND SUBMIT AN ECP ON DD
FORM 1692, LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT VIA EMAIL IN ACCORDANCE WITH CDRL
DISTRIBUTION LIST OR DOD SAFE (https://Secure.apps.mil/)
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 5 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE, MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A012 NOTICE OF REVISION (NOR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-SESS-80642D (SEE BLK 16) SECTION C NAWCWD (685200D)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ASREQ ASREQ
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ Reg Repro
NAWCWD (685200D) 0 1 0 16. REMARKS
BLK 4: DELETE PARAGRAPH 2B AND 2C. SUBMIT IN CONJUNCTION
WITH CDRL A006 (ECP).
FOR EACH DRAWING, ASSOCIATED LIST, OR OTHER REFERENCED
DOCUMENT WHICH REQUIRES REVISION, THE CONTRACTOR SHALL
PREPARE AND SUBMIT NOR ON DD FORM 1695, LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT VIA EMAIL IN ACCORDANCE WITH CDRL
DISTRIBUTION LIST OR DOD SAFE (https://Secure.apps.mil/).
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 5 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _______ of _______ Pages
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 1 of 3 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER
E. CONTRACT / PR NO.
R16A06RQHI
F. CONTRACTOR D. SYSTEM/ITEM
BOMB, PRACTICE, MK 76 MOD 5, TWIN PACK
(LEVEL B PACK)
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Operations Security (OPSEC) Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Documentation No.)
DI-MGMT-80934C
5. CONTRACT REFERENCE
OPSEC SOW
6. REQUIRING OFFICE
AMSJM-FP/G2
7. DD 250 REQ.
XX
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
ASREQ
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
ASREQ
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ
Draft Final
Reg Repro
16. REMARKS:
DELETE REFERENCE 'APPLYING OPSEC TO U.S. GOVERNMENT
CONTRACTS'. REPLACE WITH REFERENCE 'SAMPLE ACQUISITIONS
OPSEC PLAN'. 10 CALENDAR DAYS REQUIRED FOR GOVERNMENT
REVIEW AND APPROVAL. *30 CALENDAR DAYS AFTER THE
CONTRACTING OFFICER PROVIDES THE LIST OF KNOWN CRITICAL
INFORMATION (CI)/THREAT INFORMATION. ** RESUBMIT 10
CALENDAR DAYS AFTER GOVERNMENT REVIEW. SUBMIT
ELECTRONICALLY TO usarmy.ria.jmc.mbx.OPSEC-FD@mail.mil.
JMC OPSEC 0 1 0
PCO 0 1 0
15. TOTAL 0 2 0
H. DATE
6/28/2018
I. APPROVED BY J. DATE
G. PREPARED BY
K. Mosher for SDMO, RDAR-EIS-PD
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ___________ TM ___________ OTHER ________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
BOMB, PRACTICE MK 76 MOD 5,
TWIN PACK (LEVEL B PACK)
R16A06RQHI
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A014 TEST PROCEDURE PHOSPHATE COATING PRE-PRODUCTION
PROCEDURE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-NDTI-80603A SECTION E NAWCWD (QA)
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
LT ONE/R (SEE 16) 150 DAC (SEE 16)
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft Final
A N/A ASREQ (SEE 16) Reg Repro
NAWCWD (QA) 0 1 0 16. REMARKS
BLK 10, 12: THE PHOSPHATE PROCEDURE SHALL BE SUBMITTED NO
LATER THAN 150 CALENDAR DAYS AFTER CONTRACT AWARD. THE
GOVERNMENT REQUIRES 30 DAYS FOR REVIEW. DISPOSITION IS
PROVIDED THROUGH THE PCO. IF FURTHER REVISIONS ARE
NECESSARY, THE CONTRACTOR SHALL HAVE 15 DAYS TO PROVIDE
REVISIONS AND THE GOVERNMENT SHALL REVIEW AND PROVIDE
DISPOSITION WITHIN 15 DAYS OF RECEIPT. THE TEST
PLAN/PHOSPHATE COATING PRE-PRODUCTION PROCEDURE SHALL
BE APPROVED PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR TO
INITIATION OF PRODUCTION.
THE PREPRODUCTION VALIDATION PANELS SHALL BE
SUBMITTED PER TT-C-490 TO THE FOLLOWING ADDRESS:
NAWCWD
1900 N. KNOX RD, MS6213
BUILDING 02466, ROOM 1250
CHINA LAKE, CA 93555-6106
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO PRODUCTION.
BLK 14: SUBMIT IN ACCORDANCE WITH ATTACHMENT 0004 VIA
EMAIL OR DOD SAFE (https://Secure.apps.mil/).
NAWCWD (685200D) 0 1 0
AMSJM-QAP 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AA-JB 0 1 0
(SEE BLK 16)
15. TOTAL 0 7 0
H. DATE I. APPROVED BY J. DATEG. PREPARED BY
Jennifer Diaz DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages
17. PRICE
GROUP1. DATA ITEM NO.
A015
18. ESTIMATED
TOTAL PRICE
NO
8. APP CODE
0 1 0
Page: 2 of 3DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
H. DATE
6/28/2018
I. APPROVED BY J. DATE
DUE TO BEGIN 30 DAYS AFTER PRODUCTION COMMENCES
FREQUENCY: 3 WORKING DAYS FOLLOWING REPORTING MONTH
SHALL BE SUBMITTED IN ELECTRONIC FORMAT AND INCLUDE AT A MINIMUM:
DESCRIPTION/NSN OF GFM
TOTAL OF GFM REQUIRED VS. TOTAL DELIVERED AS OF THE CURRENT MONTH
RECEIPTS: CUMULATIVE VS. CURRENT MONTH
CONSUMED: CUMULATIVE VS. CURRENT MONTH
REJECTED/DAMAGED MATERIAL: LOT NUMBERS AND SERIAL NUMBERS OF GFM
LAP CLINS: CONTRACT QUANTITY VS. DELIVERED QUANTITY
THIS INFORMATION SHOULD BE PROVIDED FOR EACH DELIVERY ORDER
SUBMIT ELECTRONICALLY TO THE PCO, OTHER DISTRIBUTION WILL BE DISCUSSED AFTER AWARD OF
REQUIREMENT.
FORMAT AND CONTENT WILL BE APPROVED THROUGH PCO
N/A N/A Reg Repro
ASREQ
16. REMARKS PRODUCTION MANAGER
PCO
N/A
MTHLY ASREQ
a. ADDRESSEE
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80438B
5. CONTRACT REFERENCE
FAR PART 45
6. REQUIRING OFFICE
AMSJM-SO
2. TITLE OF DATA ITEM 3. SUBTITLE
GOVERNMENT FURNISHED MATERIEL (GFM) CONSUMPTION REPORT CONSUMPTION REPORT
TDP____________ TM____________ OTHER____________
CONTRACT / PR NO.
R16A06RQHI
F. CONTRACTOR
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
Form Approved OMB No. 0704-0188
G. PREPARED BY
M. Vetter
E. D. SYSTEM/ITEM
BOMB, PRACTICE, MK 76 MOD 5, TWIN PACK (LEVEL B
PACK)
0 2 0
0 1 0
FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM -
Technical Manual; Other - other category of data, such as
"Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of
CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the
Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items
12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.
The estimated data prices shall not include any amount for rights in data. The
Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423 (BACK)
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the
Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form
1423.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form
1423.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the
Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD
Form 1423 at no cost.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the
Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
3Page 3 of
| QA_CDRLS_R16A06RQHI |
| R16A06RQHI_ppi_CDRL |
| lcaap_gfm.pdf |
| 4A8A18QDM2_gfm.pdf |
| 80438A |
| FATP Exhibit: |
| TDP: |
| A FATP 0(CDRL#): |
| TM: |
| FATP OTHER: |
| FATP System: BOMB, PRACTICE, MK 76 MOD 5, TWIN PACK (LEVEL B PACK_ |
| E FATP CONTRACTPR NO: |
| F FATP CONTRACTOR: |
| FATP CDRL #: A005 |
| FATP TITLE OF DATA ITEM: First Article Qualification Test Plan and Procedure - N/A |
| FATP SUBTITLE: N/A |
| FATP Authority: |
| FATP CONTRACT REFERENCE: |
| 6 FATP REQUIRING OFFICE: |
| FATP DD 250: |
| 17: |
| 18: |
| FATP DIST STATEMENT REQUIRED: |
| FATP FREQUENCY: |
| FATP DATE OF FIRST SUBMISSION: |
| FATP App Code: |
| FATP AS OF DATE: N/A |
| FATP DATE OF SUBSEQUENT SUBMISSION: |
| FATP Addressee 1: |
| DATE: |
| FATP DraftRow1: 0 |
| FATP RegRow1: |
| FATP ReproRow1: 0 |
| FATP Addressee 2: |
| FATP DraftRow2: 0 |
| FATP RegRow2: |
| FATP ReproRow2: 0 |
| FATP Remarks: N/A |
| FATP Addressee 3: |
| FATP DraftRow3: 0 |
| FATP RegRow3: |
| FATP ReproRow3: 0 |
| FATP Addressee 4: |
| FATP DraftRow4: 0 |
| FATP RegRow4: |
| FATP ReproRow4: 0 |
| FATP Addressee 5: |
| FATP DraftRow5: |
| FATP RegRow5: |
| FATP ReproRow5: |
| FATP Addressee 6: |
| FATP DraftRow6: |
| FATP RegRow6: |
| FATP ReproRow6: |
| FATP Addressee 7: |
| FATP DraftRow7: |
| FATP RegRow7: |
| FATP ReproRow7: |
| FATP Addressee 8: |
| FATP DraftRow8: |
| FATP RegRow8: |
| FATP ReproRow8: |
| Draft15 TOTAL: 0 |
| FATP Reg15 TOTAL: 0 |
| Repro15 TOTAL: 0 |
| A DATE: |
| number: |
| FATP number: |
File details come from the government source that posted it. Updated .