Attach_0008_Defense_Priorities.pdf

PDF 23 KB Posted

Attached to
MK7 Anti-Personnel Obstacle Breaching System (APOBS) and APOBS Inert Trainer
Solicitation number
W52P1J-18-R-0034
Issued by

About this file

This document contains a federal contract opportunity notice for the MK7 Anti-Personnel Obstacle Breaching System (APOBS) and the APOBS Inert Trainer. The Department of the Army Materiel Command Joint Munitions Command intends to issue a request for proposal on or after December 11, 2018 seeking proposals for up to two firm fixed price indefinite-delivery indefinite-quantity contracts covering fiscal years 2019 through 2023. A total guaranteed minimum quantity of 3,000 MK7 APOBS units will be divided evenly between the contracts. Offerors must be able to provide first article test reports within 450 days of award and begin production deliveries within 540 days to meet a twelve month delivery schedule. The technical data packages for the items are distribution statement D and access is restricted to the Department of Defense and its contractors through the U.S./Canada Joint Certification Program.

ATTACH 0008 DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM (15 CFR 700)

As a defense contractor for the Department of the Army, you are required to follow the provisions of the Defense Priorities and Allocations System (DPAS) and the other applicable regulations and orders of the Department of Commerce (DOC) in obtaining products, services, and materials needed to fill this order (Ref General Provisions, FAR 52.211-15).

The rules relating to the status, placement, acceptance, and treatment of priority ratings and rated orders are contained in DPAS. There are two types of priority ratings: DO ratings and DX ratings. A priority rating consists of either of these rating symbols and one of program identification. For example, DO-A6 identifies the program as ammunition (A6) and gives the contract a DO rating. DX-A5 identifies the program as weapons (A5) and gives the contract a DX rating. The program identification symbol (A5, A6, etc.) does not affect the preferential status of the rating on the applicable contract.

Use of the priorities system is appropriate during the solicitation phase in aligning potential suppliers/ subcontractors. It is therefore imperative that prospective bidders/offerors identify each request for quotations issued to suppliers as a defense order with the applicable priority rating that would be assigned.

GENERAL

JMC FORM 715-3, DEC 2007 Replaces JMC Form 715-3, Mar 2005, which is obsolete.

Acceptance of a rated order requires scheduling of operations to fill each rated order by the required delivery or performance date, regardless of the sequence in which the orders were received. If this is not possible, precedence must be given as follows:

a. DX rated orders take precedence over DO rated orders, and DO rated orders take precedence over unrated orders. All DX ratings have equal preferential status; all DO ratings have equal preferential status.

b. A conflict between rated orders of equal priority status: precedence shall be given to the order that was received first.

c. A conflict between rated orders of equal priority status received on the same day: precedence shall be given to the order that has the earliest required delivery or performance date.

SEQUENCE OF FILLING RATED ORDERS

It is mandatory that prime contractors receiving rated orders extend the rating to their subcontractors and suppliers for the materials necessary to complete the rated contract. The priority rating appearing in the contract shall be used when placing subcontracts and purchase orders for production materials, components and/or items (e.g., special jigs, dies, fixtures and inspection gauges) required for performance on a rated contract. The contractor shall advise subcontractors (first, second, or subsequent tier) to extend the rating and program identification when placing subcontracts and purchase orders. A rated order must contain the following:

a. The priority rating - which consists of the prefix DO or DX, followed by the program identification, A6, B9, C3, or C9, etc.

b. A statement that reads in substance: This is a rated order certified for national defense use, and you are required to follow all the provisions of the Defense Priorities and Allocations System regulation (15 CFR 700).

c. The signature of an authorized official of the firm placing the order.

d. The delivery date or dates required.

MANDATORY USE OF RATINGS

DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM (15 CFR 700)

As a defense contractor for the Department of the Army, you are required to follow the provisions of the Defense Priorities and Allocations System (DPAS) and the other applicable regulations and orders of the Department of Commerce (DOC) in obtaining products, services, and materials needed to fill this order (Ref General Provisions, FAR 52.211-15).

The rules relating to the status, placement, acceptance, and treatment of priority ratings and rated orders are contained in DPAS. There are two types of priority ratings: DO ratings and DX ratings. A priority rating consists of either of these rating symbols and one of program identification. For example, DO-A6 identifies the program as ammunition (A6) and gives the contract a DO rating. DX-A5 identifies the program as weapons (A5) and gives the contract a DX rating. The program identification symbol (A5, A6, etc.) does not affect the preferential status of the rating on the applicable contract.

Use of the priorities system is appropriate during the solicitation phase in aligning potential suppliers/ subcontractors. It is therefore imperative that prospective bidders/offerors identify each request for quotations issued to suppliers as a defense order with the applicable priority rating that would be assigned.

GENERAL

JMC FORM 715-3, DEC 2007 Replaces JMC Form 715-3, Mar 2005, which is obsolete.

Acceptance of a rated order requires scheduling of operations to fill each rated order by the required delivery or performance date, regardless of the sequence in which the orders were received. If this is not possible, precedence must be given as follows:

a. DX rated orders take precedence over DO rated orders, and DO rated orders take precedence over unrated orders. All DX ratings have equal preferential status; all DO ratings have equal preferential status.

b. A conflict between rated orders of equal priority status: precedence shall be given to the order that was received first.

c. A conflict between rated orders of equal priority status received on the same day: precedence shall be given to the order that has the earliest required delivery or performance date.

SEQUENCE OF FILLING RATED ORDERS

It is mandatory that prime contractors receiving rated orders extend the rating to their subcontractors and suppliers for the materials necessary to complete the rated contract. The priority rating appearing in the contract shall be used when placing subcontracts and purchase orders for production materials, components and/or items (e.g., special jigs, dies, fixtures and inspection gauges) required for performance on a rated contract. The contractor shall advise subcontractors (first, second, or subsequent tier) to extend the rating and program identification when placing subcontracts and purchase orders. A rated order must contain the following:

a. The priority rating - which consists of the prefix DO or DX, followed by the program identification, A6, B9, C3, or C9, etc.

b. A statement that reads in substance: This is a rated order certified for national defense use, and you are required to follow all the provisions of the Defense Priorities and Allocations System regulation (15 CFR 700).

c. The signature of an authorized official of the firm placing the order.

d. The delivery date or dates required.

MANDATORY USE OF RATINGS

Defense Priorities
Defense Prorities 2

File details come from the government source that posted it. Updated .