Amendment_0001-11_Feb.pdf

PDF 80 KB Posted

Attached to
MK7 Anti-Personnel Obstacle Breaching System (APOBS) and APOBS Inert Trainer
Solicitation number
W52P1J-18-R-0034
Issued by

About this file

This is a synopsis for a competitive Request for Proposal for the MK7 Anti-Personnel Obstacle Breaching System and inert trainer. The U.S. Army Contracting Command intends to issue the RFP on or after December 11, 2018, with an estimated closing date 30 days after issuance. The solicitation will be for Firm Fixed Price IDIQ contracts covering Fiscal Years 2019 through 2023, with a minimum guaranteed quantity of 3,000 MK7 systems to be divided between up to two awardees. Offerors must provide a First Article Test Report 450 days after award for both items, with production deliveries beginning within 540 days and based on a 12-month delivery period. The applicable NAICS code is 332993. The Technical Data Packages will be available electronically via FBO, and contractors must be registered in SAM to receive them or be considered for award. Points of contact are provided.

Solicitation Amendment

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req No. 5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code) 9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print) 16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2019FEB11

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

ADAM M. GENEVA

EMAIL: ADAM.M.GENEVA.CIV@MAIL.MIL

W52P1J-18-R-0034

2019JAN03

X

X 2019FEB28 03:00pm

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 35

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: ADAM M. GENEVA

Buyer Office Symbol/Telephone Number: CCRC-AR/(309)782-3505

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

1. The purpose of this amendment is to:

a. Add attachment 0010, Questions and Answers 1 (Q+A 1), answering questions 1-48. A follow up amendment will be processed to incorporate the engineering exceptions or ECP's into the solicitation. Q+A 1 can be found at the TDP link found in section C:

https://www.fbo.gov/notices/87f32a02b8311346f2fe9142e73e1150

2. The following changes were made to the solicitation:

a. (Q1) Change Manufacturing Part Number to 87012A9000-3, CLIN 0003.

b. (Q2) Correct revision for WS-35168 is F.

c. (Q23) Remove Grain Assembly from section L.4.1.1.a.I, and M.4.1.1.a.I.

d. (Q24) Correct typo, Small Business Participation Plan is attachment 0009.

e. (Q26) Correct typo, the minimum quantity for APOBS Inert Trainer is one (1), reference I-2, FAR 52.216-19.

f. The solicitation close date has been extended and can be found on page one, block 11 of this amendment.

3. All other Questions have been addressed in the Q+A 1 attachment.

*** END OF NARRATIVE A0002 ***

2 35

W52P1J-18-R-0034

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0003 APOBS INERT FIRST ARTICLE TEST REPORT $ $ _____________________________________ ______________ __________________

COMMODITY NAME: INERT TRAINER FAT REPORT

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 1325I

Mfr Part Number: 87012A9000-3

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Government Approval/Disapproval Days: 25

The First Article Test Report shall be submitted within 450 days after award, with

FAT approval estimated at 480 days after contract award based upon a 25 day Government review timeframe.

All proposed First Article Test costs shall be provided on the pricing matrix (attachment

0001)

(End of narrative F001)

3 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

First Article Test (Contractor Testing)_______________________________________

(a) The first article shall consist of:

Items and quantities per PRF WS-35168F, sections 3.1, 4.3 and Table 1 for APOBS MK7 MOD 2; Items and quantities per WS 33029 for APOBS

Inert Trainer, which shall be examined and tested in accordance with contract requirements, the item specifications, Quality Assurance

Provisions (QAPS) and all drawings listed in the Technical Data Package.

(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package provided by the Government.

(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAP(s), and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the

First Article Test Report.

(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the

First Article Test Report.

(5) Onetime qualification tests, which are defined as a onetime on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractors facility and certifications are submitted with the First Article Test Report.

(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.

(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including suppliers and Vendors inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The Government Quality Assurance Representatives (QAR) findings shall be documented on DD Form 1222, Request for and Results of Tests, and attached to the contractors test report. Two copies of the First Article Test Report and the DD Form 1222 will be submitted through the Administrative Contracting Officer to the Contracting Officer with an additional information copy furnished to AMSJM-QAP (Joint Munitions Command, Product Quality Manager) .

(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the

Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the Contractor.

Measurement System Evaluation_____________________________

(a) Definitions. This paragraph defines specific terms utilized throughout the rest of this section and in the accompanying Contract

Data Requirements List (CDRL) and Data Item Description (DID). This aids in clarifying the MSE requirements to Government and contractor personnel.

(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., 4 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Detail, Performance, Weapon specifications, and QAPs).

(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.

(3) Contractor Inspection Equipment. Government-approved equipment utilized by the contractor to perform examination and tests to assure conformance to contract requirements.

(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:

(i) Standard Test Equipment. Multiusage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.

(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.

(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic

Particle, and Liquid Penetrant.

(6) Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.

(b) Scope. This section establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this section establishes requirements for the preparation, submission, and approval of AIE documentation.

(c) AIE. The contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements.

AIE shall include inspection, measuring, and test equipment whether Government furnished or contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIEs ability to test, verify, and/or measure the applicable characteristics or parameters (see applicable DID referenced in DD Form 1423).

(d) AIE Designs & Government Furnished Gages. AIE designs are of two types Government designs (see (d)(1)) and contractor designs (see

(d)(2)). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the contractor. The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.

(1) Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the

AIE. Unless otherwise specified, the contractor may submit alternate or modified contractor designs of Government AIE designs.

(2) Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5 and ASME Y14.43 and may include commercial inspection equipment. [Commercial inspection equipment is defined as shown in paragraph (a)(4) above. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used. Unless otherwise specified, Gage Tolerancing Policy shall be in accordance with ASME Y14.43, Absolute Tolerancing (Pessimistic

Tolerancing).

(3) Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval.

(e) AIE Package Submittals. The contractor shall prepare the AIE package submittal in accordance with the DID referenced in the applicable Contract Data Requirements List (CDRL DD Form 1423). In addition, the contractor shall adhere to the following requirements:

(1) Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the

Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.

(2) Correspondence in English. The contractor shall ensure all AIE correspondence and documentation are submitted in English.

5 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(3) Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements of the Technical Data Package (TDP).

(4) AIE Flow Down. The contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance inspections.

(f) Characteristics for Inspection. AIE documentation for Critical, Special, and Major characteristic inspections shall be submitted to the Government for approval in accordance with (IAW) the CDRL (see DD Form 1423). AIE for Minor characteristic inspections shall be submitted to the Government for approval IAW CDRL (see DD Form 1423) and as required below:

(1) [ ] Listed Minor (characteristics displayed on specifications and/or drawings

(2) [ ] Government selected list (as attached or as provided herein):

Click here to enter text.

(3) [x] Not submitted

(g) Automated Acceptance Inspection Equipment. The AAIE shall accept only conforming material. All characteristics requiring AAIE per the TDP shall utilize inspection equipment with a minimum demonstrated reliability of 99.8% at a 90% confidence level to detect non-conforming material unless otherwise specified below.

(1) Reliability of _____% at a _____% Confidence Level for Critical/Special Characteristics

(2) Reliability of ____% at a ___% Confidence Level for Major Characteristics

(3) For inspection of major and minor characteristics where contractor utilizes AAIE when it is not required by the TDP, the AAIE package shall be submitted to the Government for approval. If the Minor characteristic is not listed in paragraph (f)(2) or not required for submittal in paragraph (f)(3), then the AAIE requirements (e.g., verification, calibration, prove-out, etc.) of the inspection shall still be performed.

(4) All AAIE packages submitted to the Government for approval shall be in accordance with MIL-A-70625 (Automated Acceptance

Inspection Equipment Design, Testing and Approval of). Furthermore, the contractor shall be responsible for producing the acceptance and rejection verification standards/masters representative of the characteristics the AAIE is designed to inspect. The verification standards and frequency of use require Government approval prior to use. When verification standards are used for the VL-VII sampling plan per MIL-STD-1916 paragraph 4.4, verification standards and frequency of use shall require Government approval prior to use.

(5) If the AAIE accepts a critical characteristic reject standard the contractor shall notify the Government and act in accordance with paragraph (f) of Critical Characteristic Control. In addition, if the AAIE accepts a major and/or minor characteristic reject standard the contractor shall act in accordance with paragraph 8.3 of ISO 10012 or paragraph 5.2.3 of ANSI/NCSL Z540.3.

(6) All AAIE shall be required to pass a Government-approved Acceptance (Prove-Out) Test. The contractor shall conduct this test per the approved test plan and shall submit a test analysis report for approval. See applicable DD Form 1423. This test shall be performed at the contractors facilities whose manufacturing system has had the AAIE fully integrated and calibrated as per paragraph (j) of this section. The contractor shall allow Government personnel access to this facility and unobstructed monitoring of this test.

(7) The contractor shall notify the Government prior to a modification and/or relocation of the Government-approved AAIE. The modified AAIE designs shall be submitted for approval. The modified and/or relocated AAIE shall require submission of the acceptance test plan (prove-out) and results for review and approval prior to use. The modified and/or relocated AAIE shall be in accordance with paragraphs (g)(1) (g)(6).

(h) Measurement System Analysis (MSA). The contractor is responsible to ensure all AIE is, at a minimum, stable, repeatable, and reproducible for all characteristics. Refer to ASTM E2782 and/or AIAG MSA for guidance. The contractor shall provide objective evidence, including the MSA assessment plan, associated data, and analysis, which demonstrates the AIE is, at a minimum, stable, repeatable, and reproducible for the following characteristics (MSA CDRL):

Specification: -N/A-Paragraph No.: - N/A -Drawing: - N/A -Characteristic: - N/A -

Characteristic: - N/A -

Approval of submitted MSA(s) must be granted before the corresponding AIE can be used or continue to be used for acceptance of product.

If at any time following approval of the AIE and MSA the AIE is disapproved, then the MSA shall be disapproved. After the resubmitted

AIE is approved, the MSA shall be conducted on the approved AIE and resubmitted for approval.

(i) Robust AIE System. The contractor shall ensure the AIE and its use is not negatively affected by any manufacturing/inspection

6 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

environmental stimuli including, but not limited to production rate, noise, temperature, humidity, and vibration.

(j) AIE Calibration and Verification. The calibration system shall be in accordance with ISO 10012 or ANSI/NCSL Z540.3. All AIE shall be subjected to scheduled calibration intervals to ensure that the equipment will accept only conforming product and reject all non-conforming product for the duration of the approved calibration period. AIE shall be subjected to periodic verification to ensure that the equipment will continue to accept and reject product with the same consistency as it did at the time of its previous calibration.

(k) Non-Destructive Testing (NDT).\~ Contractor shall submit detailed plans for qualifying and certifying NDT personnel and plans for qualification and ongoing use of NDT methods used for inspecting product. If re-qualification of NDT personnel and/or NDT methods is required, then the applicable plans shall be submitted.

(1) Personnel performing NDT examinations shall be qualified and certified in accordance with the standard practices prescribed by

NAS 410 (NAS Certification & Qualification of NDT Personnel), ANSI/ASNT-CP-189 (ASNT Standard for Qualification and Certification of NDT

Personnel), or SNT-TC-1A (Recommended Practice for Personnel Qualification and Certification in NDT), and additional procedures that may be identified by the Government.\~ Acceptance of product using NDT shall be performed by personnel at a level of qualification consistent with that defined in the applicable standard.

(2) The NDT method(s) shall be applied in accordance with ASTM E 543 (Standard Specification for Agencies Performing Nondestructive

Testing) and the current nationally recognized standard practices appropriate to the NDT method(s) employed, such as ASTM E-1742

(Standard Practice for Radiographic Examination) and SAE-AMS-STD-2154 (Inspection, Ultrasonic, Wrought Metals, Process For). Each application technique shall identify the standard(s) utilized. Non-destructive testing includes, but is not limited to, the following types of testing: Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic Particle, and Liquid Penetrant.

(l) Contractor Alternate Inspection Method(s), Modifications and/or Relocation of AIE (Non-Automated) After Government Approval. If the contractor proposes an alternate inspection method and/or modifies the AIE design(s) affecting hardware, software, or procedures after

Government approval the intended change(s) shall be submitted to and approved by the Government prior to implementation. If an AIE is relocated and the relocation risks the integrity of the inspection system, notify the Government to determine information needed to assess impact to AIE. See DD Form 1423.

(m) Responsibility for AIE Package Submittal. The contractor shall submit the AIE design documentation package within contractual timeframes per CDRL (See DD Form 1423). The Government will provide approval or disapproval within the timeframe specified in the CDRL.

Disapproval of the AIE package will require re-submittal and subsequent Government review in accordance with the CDRL requirements. The

AIE package and any required prove-outs must be approved prior to First Article (FA) (if required) or production start-up if FA is not required.

(n) Governments Right to Disapprove AIE. The Government reserves the right to revoke approval of any AIE that is not satisfying the required acceptance criteria at any time during the performance of this contract. See DD Form 1423.

(o) Navy Furnished Gages. When gages are listed in paragraph (o)(9) below, the Navy Special Interface Gage (NSIG) Requirement paragraphs (o)(1) (o)(8) shall be satisfied.

(1) The NSIG(s) are provided for verification of selected interface dimensions and do not constitute sole acceptance criteria of production items or relieve the contractor of meeting all drawing/specification requirements under the contract.

(2) The contractor is responsible for contacting the Naval Surface Warfare Center (NSWC), Corona Division at least 45 days prior to

FAT (if required) or production, for the delivery of NSIG(s).

(3) NSIG(s) will be forwarded to the contractor for joint use by the Government and the contractor. Government furnished NSIG(s) shall not be used by the contractor(s) or subcontractor(s) as in-process or working gage(s).

(4) For production items that fail to be accepted by the applicable NSIG(s), an alternate inspection method may be submitted for approval.

(5) The contractor may substitute contractor designed and built AIE for the NSIG(s) noted in paragraph (o)(9) below. However, the designs require Government (Navy) approval and the contractor AIE hardware requires Government (Navy) certification. AIE designs shall be submitted in accordance with CDRL (see DD Form 1423).

(6) The Government (Navy) shall not be responsible for discrepancies or delays in production items resulting through misuse, damage or excessive wear to the NSIG(s).

(7) Calibration and repair of the NSIG(s) shall only be performed as authorized by the NSWC Corona Division. Repair is at no cost to the contractor unless repair is required due to damage to the gages resulting from contractor fault or negligence. Damaged, worn, or otherwise unserviceable NSIG(s) shall be brought to the immediate attention of the CAO and NSWC Corona Division. The contractor shall not make any adjustments, alterations or add permanent markings to NSIG(s) hardware unless specified by the NSIG operating instructions or authorized by the NSWC Corona Division.

7 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(8) Within 45 calendar days after final acceptance of all production items, the NSIG(s) shall be shipped to NSWC Corona Division, ATTN: Receiving Officer, Bldg 575, Gage Laboratory, 1999 Fourth St., Norco, CA 92860-1915. The following shipping and marking specifications are applicable:

(i) Shipping, MIL-STD-2073, DOD Standard Practice for Military Packaging

(ii) Marking, MIL-STD-129, Marking for Shipment and Storage.

(9) The following NSIG(s) shall be provided and are mandatory for use except as noted by paragraph (o)(5) above.

Drawing: -N/A-Rev: -N/A-Characteristic: -N/A-NSIG No.: -N/A-Qty: -N/A-Dimensions: -N/A-Weight: -N/A-Value: -N/A-

8 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Ammunition Data Cards_____________________

Detailed requirements and guidance for the preparation of Ammunition Data Cards (ADCs) and Ammunition Lot Numbers are contained in MIL-

STD-1168, the applicable DD Form 1423 and the Worldwide Ammunition-data Repository Program (WARP) online users manual. Detailed requirements for obtaining and using a manufacturers identification symbol, which is an integral component of the ammunition lot number, can be found in MIL-STD-1168 and the WARP users manual. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term should are considered to be replaced with the word shall.

(a) The contractor shall develop and submit ADCs in accordance with the requirements of this section, MIL-STD-1168, and the users manual located on the WARP database. The WARP application is accessed through the Munitions History Program (MHP) website. (Refer to

Ammunition Data Cards and Report of Contractor Ballistic Testing for more information.) The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(b) The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.

(c) Unless otherwise authorized by the Procuring Contracting Officer, the contractor shall include, in the components sections on the

ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.

End Item Component Listing APOBS MK7, MOD 2:

Drawing Number: 87012A1100, Nomenclature: Rocket Motor Assembly MK126 Mod 0

Drawing Number: MIL-P-46994, Nomenclature: BKNO3

Drawing Number: MIL-P-17669, Nomenclature: Propellant, Type N-5

Drawing Number: 87012A1310, Nomenclature: Non-Electric Initiator

Drawing Number: 87012A1800, Nomenclature: Soft Pack Container

Drawing Number: 87012A3131-1, Nomenclature: Connector, Male, Black

Drawing Number: 87012A3131-2, Nomenclature: Connector, Male, Green

Drawing Number: 87012A3131-3, Nomenclature: Connector, Male, Clear

Drawing Number: 87012A3141, Nomenclature: Connector, Female

Drawing Number: 87012A3240, Nomenclature: Parachute APOBS

Drawing Number: 87012A3260, Nomenclature: Line Charge, Rear Assembly

Drawing Number: 87012A3150, Nomenclature: Line Charge, Front Assembly

Drawing Number: 87012A3466, Nomenclature: APOBS Grenade Assembly

Drawing Number: 87012A3462, Nomenclature: Shell, Grenade

Drawing Number: 87012A3463, Nomenclature: Ring, Clamp

Drawing Number: 87012A3457, Nomenclature: Tube, Grenade

Drawing Number: 87012A3450, Nomenclature: Integral Seal, Grenade

Drawing Number: 87012A3500, Nomenclature: Detonating Cord Assembly

Drawing Number: MIL-DTL-32057, Nomenclature: PBXN-10 Type I, 87012A3465

Drawing Number: MIL-DTL-32057, Nomenclature: PBXN-10 Type II, 87012A3464

Drawing Number: MIL-DTL-14970, Nomenclature: Comp A-5, Class2

9 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Drawing Number: 87012A4110, Nomenclature: Front Pack Assembly

Drawing Number: 87012A4210, Nomenclature: Rear Pack Assembly

Drawing Number: 87012A4220-1, Nomenclature: Bridle Cable Assembly

Drawing Number: 87012A4400, Nomenclature: Frame Assembly

Drawing Number: 87012A5000, Nomenclature: Shipping Container

Drawing Number: 87012A6000, Nomenclature: APOBS Fuze, Front

Drawing Number: 87012A7000, Nomenclature: APOBS Fuze, Rear

Drawing Number: 87012A3502, Nomenclature: Cup

Drawing Number: 87012A3501, Nomenclature: Detonating Cord

(d) The component items identified below are from paragraph (c) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168 and WARP requirements. Drawing Number from paragraph

(c) above 87012A1100 Rocket Motor Assembly, components as follows:

Component Drawing Number: 87012A1200, Nomenclature: Ignitor Assembly

Component Drawing Number: MIL-P-46994, Nomenclature: BKNO3

Component Drawing Number: 87012A1115, Nomenclature: Grain Assembly

Component Drawing Number: MIL-P-17689 Nomenclature: Propellant, N-5

Component Drawing Number: 87012A1260, Nomenclature: Mechanical Initiator

Component Drawing Number: 87012A1128, Nomenclature: Ignitor Cap Weldment

Drawing Number from paragraph (c) above 87012A6000 APOBS Front Fuze, components as follows:

Component Drawing Number: 87012A6920, Nomenclature: Safety Pin, Firing

Component Drawing Number: 87012A6921, Nomenclature: Safety Pin, Arming

Component Drawing Number: Contractors DWG Number, Nomenclature: Shear Pin

Component Drawing Number: Contractors DWG Number, Nomenclature: Body, Front Fuze

Energetics not listed on Drawing

Drawing Number from paragraph (c) above 87012A7000 APOBS Rear Fuze, components as follows:

Component Drawing Number: 87012A6920, Nomenclature: Safety Pin, Firing

Component Drawing Number: 87012A6921, Nomenclature: Safety Pin, Arming

Component Drawing Number: Contractors DWG Number, Nomenclature: Shear Pin

Component Drawing Number: Contractors DWG Number, Nomenclature: Body, Rear Fuze

Energetics not listed on Drawing

Drawing Number from paragraph (c) above 87012A1310 Non-Electric Initiator, components as follows:

Component Drawing Number: Contractors DWG Number, Nomenclature: Shock Tube

Component Drawing Number: Contractors DWG Number, Nomenclature: Firing Assembly

10 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Component Drawing Number: Contractors DWG Number, Nomenclature: Percussion Primer

Component Drawing Number: Contractors DWG Number, Nomenclature: Squib Assembly

Drawing Number from paragraph (c) above 87012A3501 Detonating Cord, components as follows:

Component Drawing Number: WS32587, Nomenclature: PBXN-8

Component Drawing Number: 87012A3504, Nomenclature: Silicone

End Item Component Listing APOBS, Inert:

Rear Pack Assembly

Front Pack Assembly

PPC, Rocket Motor & Fuze

Line Charge, Front

Line Charge, Rear

Det Cord and Grenade Assembly, Front

Det Cord and Grenade Assembly, Rear

Detonating Cord

APOBS, Rear Inert Fuze

Soft Pack Field Transport Container

Initiator, Mechanical, Assembly

Initiator, Non-Electric

Bridle Cable Assembly

(e) Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements. Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components. When not required by technical data package and not an end item or major component, the component lot number may be constructed through contractor lot number convention.

(f) The flowdown of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.

(g) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP users manual provides information on the level of detail required.

(h) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.

Process Capability, Control and Improvement Requirements_________________________________________________________

(a) The Contractor shall establish a Process Control System that Includes, but is not limited to, procedures, systems and software.

This Process Control System shall complement the requirements of an ISO 9001-2015 or equivalent Quality Management System as well as all contract quality requirements. Statistical Process Control (SPC), when utilized, shall be implemented in accordance with ISO 11462-1 and ANSI/ASQC B1, B2, and B3 or equivalent. A Process Control Plan (PCP), which describes actions and methods to assure production processes will be in a state of control, shall be submitted to the Government for review and acceptance as stipulated on DD Form 1423.

Demonstration of process capability in accordance with the accepted PCP shall be accomplished prior to or at first article (if required)

11 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

or prior to start of production. Acceptance of product shall be contingent on verification of acceptable process capability in accordance with the accepted PCP, provided all other contractual requirements are met. The Government reserves the right to withhold acceptance of product when there is evidence of noncompliance to the PCP. Should a finding of noncompliance to the PCP be made, a corrective action plan shall be submitted to the Government.

(b) Characteristics for process control are as follows:

[ ] (1) Characteristics for process control are attributes or features whose variation have a significant effect on product fit, form, function, performance, service life or producibility, that require specific actions for the purpose of controlling variation.

Characteristics for process control result from an in depth Government-only review and analysis as specified in Technical Data Package

(TDP) documentation as required below:

[ ](1.1) Government selected list, see paragraph g below

[ ](1.2) As listed key characteristics

[ ] (2) Characteristics for process control are attributes or features whose variation have a significant effect on product fit, form, function, performance, service life or producibility, that require specific actions for the purpose of controlling variation.

Characteristics for process control shall be determined using an in-depth Contractor review and analysis as specified in the PCP documentation. The Government reserves the right to identify any characteristics for process control as well as any additional characteristics identified in paragraph g.

[X] (3) Characteristics for process control are features within a product, subassembly, part and process whose variation from nominal (i.e., target value) significantly impacts safety, performance in terms of customers requirements, or final cost of a product.

Special controls should be applied where the cost of variation justifies the cost of control. These shall be developed from an in depth

Government-Contractor review and analysis of design as specified in paragraph g below.

(c) The Contractors analysis shall include processes and operations under the control of the prime Contractor and those under the control of sub-Contractor including subtier suppliers. The Contractor shall create a process flow chart for the entire process

(including manufacturing, inspection and material handling) and perform Process Failure Modes and Effects Analysis (PFMEA) for all processes identified on the process flow chart [If option b(3) is selected, a PFMEA and process flow chart will not be necessary]. The

Contractor shall identify, define and document specific controls applicable for each process and operation that affects all characteristics required for control. The Contractor shall: (a) conduct process capability studies on all process and operation parameters affecting characteristics for process control; (b) verify that all automated inspection equipment used to validate process capability has been properly calibrated and certified; and (c) conduct Measurement System Analysis (MSA) studies on all applicable corresponding measurement systems utilized to monitor process capability.

(d) The Contractor shall prepare and implement a PCP. The PCP shall be based upon and include the process flow chart, PFMEA [If option b(3) is selected, a PFMEA and process flow chart will not be necessary], process capability studies and Measurement System Analysis

(MSA)for all process and operation parameters affecting characteristics for process control. For each characteristic, the PCP shall describe the entire process (including manufacturing, inspection and material handling), control methods and action plans for all out of control conditions and process capability at the stated production rates. When utilizing statistical methods, a process capability index such as Cpk shall be calculated. A characteristic for process control shall be considered to have an acceptable (and capable) process if it has a Cpk of at least 2.00 for Critical characteristics, 1.33 for all other characteristics selected for control, or as stated as follows: -1-. The Contractor shall notify the Government when the minimum process capability values (Cpk) of 2.00 for

Critical characteristics and 1.33 for all other characteristics for process control, or the alternative established minimum Cpk values, are no longer being maintained.

(e) In accordance with MIL-STD-1916 the Contractor may request, in writing, that alternate methods of acceptance be evaluated once the processes and applicable operation parameters have been demonstrated to be both stable and capable. Any alternate methods may not be implemented until accepted by the Contracting Officer.

(f) Corrective Action Requests (CARs) and Requests For Deviations (RFDs) generated for identification of product nonconformances shall result in an evaluation of the Process Control Plan (PCP). The evaluation will consider addition of new characteristics for process control to the contractually required process control list and require implementation of actions per paragraphs (c) and (d) above with submittal to the PCO for Government acceptance. If the CARs and RFDs are related to characteristics, processes and/or operations already identified in the PCP then those actions required by paragraphs (c) and (d) will be reassessed and submitted to the PCO for

Government acceptance. The Government reserves the right to withhold acceptance of product until the revised PCP is accepted by the

Government.

(g) If box b(1)[1.1], b(2) or b(3) are checked above, the selected characteristics and applicable tools, techniques, control methods or method of analysis to obtain these are specified as follows: To be determined after contract award after in depth Government-Contractor review and analysis of design

12 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

MIL-STD-1916

The Department of Defense (DoD) Preferred Methods for this Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.

Critical Characteristic Control_______________________________

(a) The contractors processes shall be designed with the objective of preventing the creation or occurrence of non-conforming critical characteristics (see paragraphs d & e). The contractor shall establish, document and maintain a product specific, critical characteristics control (CCC) plan that shall be submitted to and approved by the Procuring Contracting Officer (PCO) IAW DD Form 1423.

The CCC plan shall include or reference all procedures, work and handling instructions and process controls relating to any critical characteristics. Mistake Proofing techniques of the material handling and inspection systems shall be a part of the CCC Plan. Guidance for developing this plan and submitting Critical Plans of Action (CPOA) (paragraph g) can be found at http://www.ardec.army.mil/organizations/QESA/ .

(b) The contractor shall assure its critical processes are robust in design, capable and under control, with the objective of not generating any critical non-conformances. The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its critical processes to prevent generating critical non-conformances as identified in the

CCC Plan.

(c) An inspection and verification system shall be employed that will verify the robustness of all critical processes. The contractor shall calculate, document, clearly identify, and have a schedule that routinely assess the reliability and effectiveness of its inspection and verification system to detect and prevent critical non-conformance escapes as identified in the CCC Plan. The Government expects that a contractor will allow zero critical escapes. To demonstrate its critical escape risk the contractor will utilize the nonconformance escape risk goal provided below.

(1) Unless otherwise specified immediately below, the calculated critical non-conformance escape risk is 1 in a million (.000001) items delivered. Or:

Alternate calculated Critical Non-conformance Escape risk: -1-

Unless otherwise approved by the PCO, the non-conformance escape risk is the sum of the individual characteristic escape rates. The probability of escape for a single characteristic shall be calculated by multiplying the non-conformance rate(s) entering the inspection system(s) by the error rate of the inspection system(s). These escape rates are then summed and shall not exceed the tolerable critical non-conformance escape risk.

(2) Within 45 days after award, the contractor can elect to submit a phased-in approach on how the non-conformance escape risk will be achieved over a period of time not to exceed 180 days from the date of first article approval, or from initiation of production when first article is not required. Submission will require approval by the Government and is subject to a technical review and analysis.

Allowance for a phased-in approach will then become a part of the contract. Disapproval of the contractors submission does not relieve the contractor of its obligation to comply with the terms of this requirement.

(3) Based on the maximum error rate defined for the inspection system, the contractor shall develop a test procedure to demonstrate the error rate. As part of the test plan the contractor shall include sufficient test quantities to assure 90% statistical confidence in the resultant rates unless otherwise approved by the PCO. Once established, the contractor shall have a documented schedule to routinely monitor the non-conformance and inspection system error rates to assure they do not exceed the maximum rates allotted.

(d) As a result of previous practices, the governments technical data may refer to Critical I, Critical II, and Special characteristics.

The use of the term critical characteristics within this section includes Critical I, Critical II and Special characteristics and the use of the term critical nonconformances includes those nonconformances pertaining to Critical I, Critical II and Special characteristics. Unless otherwise stated in Section C, these characteristics shall be subject to all requirements of this section.

(e) In addition to critical characteristics defined in the governments technical data (drawings, specifications, etc.), the contractor shall also identify and document in its contractor developed technical data all known material, component, subassembly and assembly characteristics whose non-conformances would likely result in hazardous or unsafe conditions for individuals using, maintaining or depending upon the product. All additional critical characteristics identified by the contractor shall comply with the critical characteristic requirements of the technical data package, supplemented herein. The Critical Item Characteristic List (CICL) review process shall be included in the CCC Plan. The contractors additional critical characteristics shall be classified in accordance with guidance located at http://www.ardec.army.mil/organizations/QESA/ and shall be submitted to and approved by the PCO prior to production (see DD Form 1423).

(f) In the event that a critical non-conformance is found anywhere in the production process, the contractor, as part of its CCC Plan, shall have procedures in place to ensure:

(1) The non-conformance is positively identified and segregated to ensure that nonconforming product does not inadvertently remain

13 35

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

in or reenter the production process. This control shall be accomplished without affecting or impairing subsequent non-conformance analysis. Final disposition of non-conforming product shall be documented and audited for traceability.

(2) The operation that produced the non-conforming component or assembly and any other operations incorporating suspect components or assemblies are immediately stopped. (See para h. for exceptions)

(3) The government (PCO) is immediately notified of the critical non-conformance (electronic mail)(See DD Form 1423).

(4) Any suspect material is identified, segregated and suspended from any further processing and shipment.

(5) An investigation is conducted to determine the root cause of the non-conformance and the required corrective actions. An evaluation shall also be conducted with regard to suspect material to ensure that no additional critical non-conformances are present. A report of this investigation shall be submitted to the government (See DD Form 1423). The use of the DID report shall not delay notification to the government as required in f(3) above.

(6) A request to restart manufacturing or to use any suspect material associated with the critical non-conformance is submitted to the government (see DD Form 1423). Restart of production shall not occur until authorized by the PCO, unless previously addressed in the approved CCC Plan. The Government will respond to a restart request within 3 working days. All objective evidence of the investigations to date shall be available for review at the time of restart. Suspect material shall not be used without PCO approval.

(7) The procuring activity reserves the right to refuse acceptance of any suspect material until the root cause or reasonably likely cause of the critical non-conformance has been identified, corrective action has been fully implemented and sufficient evidence has been provided to exclude non-conforming material from the conforming population.

(g) The contractor may develop alternative plans and provisions, collectively referred to as a Critical Plan of Action (CPOA), relative to government or contractor identified critical characteristics. All CPOAs are independent and shall be evaluated by the government for this contract.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .