W52P1J17R0089.pdf
PDF 228 KB Posted
- Attached to
- 105mm Wood Box Federal contract opportunity
- Solicitation number
- W52P1J17R0089
About this file
105mm Wood Box Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W52P1J17R0089-0003.pdf | ||
| W52P1J17R0089-0002.pdf | ||
| W52P1J17R0089-0001.pdf | ||
| Exhibit_A_CDRLs.pdf | ||
| Attachment_0001-_Pricing_Matrix_for_105mm_Wood_Box.xlsx | XLSX spreadsheet | |
| Attachment_0003_-_Govt._POC_list.pdf | ||
| Attachment_0002_-_PPQ_-_105mm_Wood_box.docx | DOCX document | |
| Attachment_0005_-_Guidance_on_Documentation_for_CDRL.pdf | ||
| Attachment_0004_DD1423_Instructions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB) Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until
(hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer) IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W52P1J-17-R-0089 X
2018MAR02
2018APR0204:00pm
DOA6
2018MAR02 SEE SCHEDULE
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
JILL C. VELOZ
(309)782-2895
CCRC-AC
JILL.C.VELOZ.CIV@MAIL.MIL
1 61
X 1
X 3 X 5
X 9 X 10 X 14
X 20
X 22
X 24
X 38
X 39
X 46
X 57
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: JILL C. VELOZ
Buyer Office Symbol/Telephone Number: CCRC-AC/(309)782-2895
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. Solicitation W52P1J-17-R-0089 is issued in accordance with Federal Acquisition Regulation (FAR) Part 13 and FAR Part 15 policies and procedures. As a result of this solicitation, the U.S. Government may award up to two, five year Indefinite Delivery Indefinite Quantity
(IDIQ), Firm Fixed Priced contracts with five, one-year ordering periods. Solicitation is an 8(a) set-aside. There are no option periods. The number of awards will be based on the U.S. Government's requirements and the need to mitigate risk. The U.S. Government reserves the right to make a single award if determined to be in the best interest of the U.S. Government.
a. The ordering periods are provided below (actual dates will be provided at time of an award):
Ordering Period 1 - Award date + 365 Days after Award (DAA)
Ordering Period 2 - 366 DAA-730 DAA
Ordering Period 3 - 731 DAA-1095 DAA
Ordering Period 4 - 1096 DAA-1460 DAA
Ordering Period 5 - 1461 DAA-1825 DAA
2. The item to be solicited is:
a. CLIN 0001: 105mm Wood Box - NSN: 8140-01-077-2004 - Part Number: 9271047
3. The total maximum amount for the life of this IDIQ shall not exceed $22,100,000.00.
4. The guaranteed minimum amount (MGA) is $5,000.00 for a process map of the 105mm Wood Box production line. The guaranteed minimum(s) will be awarded concurrently with the basic IDIQ contract(s) on Delivery Order 0001 to each offeror receiving an award.
5. First Article Test (FAT) is required for the 105mm Wood Box, see FAR clauses; 52.209-4512, First Article Test (Contractor Testing)
(ES6031) and 52.209-3 First Article Approval - Contractor Testing (IF60002). Inspection/Acceptance for all First Article reports shall be Origin/Destination. FAT may be waived by the Contracting Officer.
6. As stated in Section L, the Price Matrix, Attachment 0001 is a requirement of the proposal submission.
7. All shipments shall be FOB Destination.
8. Inspection/Acceptance/FOB Point for production shall be Origin/Origin/Destination.
9. Proposals shall remain valid for 250 days.
10. Proposals shall be submitted in accordance with Section L of this solicitation and to the point of contact listed below;
ATTN: Jill C. Veloz, (309) 782-2895
EMAIL: jill.c.veloz.civ@mail.mil
11. This Request for Proposal (RFP) shall not be discussed with any other United States Government employee except the Contracting
Officer, Ms. Katelyn Coon or her representative, Ms. Jill Veloz. Potential offeror's comments and/or questions should be directed in writing by email to:
Ms. Jill Veloz at jill.c.veloz.civ@mail.mil, and
Ms. Katelyn Coon at katelyn.m.coon.civ@mail.mil
Please indicate the RFP number, W52P1J-17-R-0089, in the subject line of the email correspondence pertaining ot this RFP. The U.S.
Government intends to respond to all potential offeror's comments and questions in writing via solicitation amendment.
*** END OF NARRATIVE A0001 ***
2 61
W52P1J-17-R-0089
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 105MM WOOD BOX - FIRST ARTICLE ACCEPTANCE TEST ______________________________________________
Noun: First Article Acceptance Test Report (FAATR) of 105mm Wood Box
CLIN: 0001
NSN: 8140-01-077-2004
P/N: 9271047
Nomenclature: 105mm Wood Box FAATR
***Do Not enter unit prices in Section B. All pricing shall be submitted in Attachment 0001-Price
Matrix.***
Delivery Schedule:
First Article Test (FAT) Samples and First Article
Acceptance Test Report (FAATR) are due 90 days after contract award. After receipt of the FAATR, the U.S.
Government has 30 days to approve. Production deliveries begin 150 days after contract award.
FAATR Inspection and Acceptance:
Inspection/Acceptance/FOB Point:
ORIGIN/DESTINATION/DESTINATION
(End of narrative B001)
0002 105MM WOOD BOX - PROCESS MAP ____________________________
Noun: Guarantee Minimum Amount (GMA) - Process Map of 105MM Wood Box Production Line
CLIN: 0002
NSN: 8140-01-077-2004
P/N: 9271047
Nomenclature: Process Map of 105MM Production Line
***Do Not enter unit prices in Section B. All pricing shall be submitted in Attactment 0001 - Price
Matrix.***
Delivery Schedule:
Process Map is due 30 days after contract award.
Process Map Inspection and Acceptance:
Inspection/Acceptance/FOB Point:
DESTINATION/DESTINATION/DESTINATION
(End of narrative B001)
3 61
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0003 105MM WOOD BOX - PRODUCTION ___________________________
Noun: 105MM Wood Box
CLIN: 0003
NSN: 8140-01-077-2004
P/N: 9271047
Nomenclature: Wood Box, 105MM
***Do Not enter unit prices in Section B. All pricing shall be submitted in Attachment 0001-Price
Matrix***
Minimum Guaranteed Quantity:
1 each -Process Map for 105MM Wood Box Production
(see CLIN 0100)
Maximum Quantity:
468,000 each
The U.S. Government is only obligated to purchase the guaranteed minimum quantity.
Inspection/Acceptance/FOB Point:
ORIGIN/ORIGIN/DESTINATION
(End of narrative B001)
0004 105MM WOOD BOX - CONTRACT DATA REQUIREMENTS LIST ________________________________________________
The contractor shall prepare and deliver data submissions in accordance with the requirements, quantities, and schedules set foth in the Contract
Data Requirements List (DD Form 1423) - Exhibit A.
(End of narrative B001)
4 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
DRAWINGS/SPECIFICATIONS APR/2012
(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
(b) Drawings and Specifications in accordance with Technical Data Package Listing 9271047:19203 with revisions in effect as of
07/17/2017 are applicable to this procurement.
(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with the clause titled
"Technical Data Package Information and Distribution and Destruction of Restricted Technical Data" in Section C of this document.
TECHNICAL DATA PACKAGE INFORMATION, AND DISTRIBUTION AND DESTRUCTION OF RESTRICTED TECHNICAL DATA
(a) Army Contracting Command - Rock Island (ACC-RI) will no longer make Technical Data Packages (TDPs) available for order via CD-ROMS.
TDPs will be obtained electronically via the link(s) below which will direct you to the Federal Business Opportunities (FBO) website.
You must have an FBO account prior to accessing any TDP(s). To register for an account in FBO, please visit http://www.fbo.gov/index and click on Register Now under Vendors/Citizens. The toll free FBO helpdesk phone number is (866) 606-8220 and for international (334) 206-
7828. Vendors are responsible for placing correct information in FBO.
(b) You may need to use special software to view the documents that we post to the FBO. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require Lucent Viewer to view the
TDP(s) which is available as freeware at: http://www.ec-edi.com/ .
(c) The TDP(s) for this solicitation will be accessible via the FBO website (as described below) from the date of issue through thetime specified in the solicitation for receipt of offers.
(d) FOR UNRESTRICTED TDPs:
(1) TDPs for this solicitation are unrestricted and can be accessed electronically via the FBO website. The URL will take you to that
CLINs web-located TDP. You must have an FBO account prior accessing the TDP.
(2) To access the TDP(s), click directly on the link provided below to be directed to the TDP. You may also copy and paste the link into your browser and hit the Enter key. You will be prompted for your FBO username and password prior to gaining access to the TDP.
CLIN: 0003
TDP Link (URL): https://www.fbo.gov/fedteds/W52P1J17R0089
(e) FOR RESTRICTED TDPs:
TDPs and any other related documents, if applicable, for this solicitation are restricted and can be accessed electronically via the FBO website, with valid contractor login credentials. TDPs and any other related documents are posted with various options, such as
Restricted and Export Control. These additional controls are described below:
(1) Access to RESTRICTED TDPs
Technical Data Packages that have been marked as 'Restricted' can be accessed electronically via the FBO website, with valid contractor login credentials. TDPs that have been marked as 'Restricted' will require approval from the Contracting Officer prior to gaining access to the requested information. To request access click on the link(s) provided below, log in to FBO, click on the packages sub-tab and then click on the request explicit access button. Completion of a Use and Non-Disclosure Agreement may be required prior to gaining access to the TDP. Please allow 2-3 working days to process your request. You will receive a system generated email from FBO stating you have been granted permission for viewing or downloading the TDP items.
5 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) Access to EXPORT CONTROL TDPs
(i) TDPs that have been marked as 'Export Control' can be accessed electronically via the FBO website, with valid contractor login credentials. In addition, to obtain access to these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical
Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you do not have an approved DD 2345, Militarily
Critical Technical Data Agreement on file with DLIS then you will not be able to access the TDP. To obtain certification, go to http://www.logisticsinformationservice.dla.mil/jcp/ , click on documents and follow instructions provided. Processing time is estimated at five working days after receipt.
(ii) TDPs that have been marked as Export Control will require approval from the Contracting Officer prior to gaining access to the requested information. To request access click on the link(s) provided below, log in to FBO, click on the packages sub-tab, enter your
Marketing Partner Identification Number (MPIN) and click on the request explicit access button. The requestor must be the "data custodian" that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes the user will be required to verify the MPIN again to gain access to Export Control TDP(s). Completion of a Use and Non-Disclosure Agreement may be required prior to gaining access to the TDP. You will receive a system generated email from FBO stating you have been granted permission for viewing or downloading the TDP items.
(iii) If multiple individuals in your company need access to the Export Control TDP for a solicitation, it can be obtained from your data custodian that is listed on the DD 2345.
(iv) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.
CLIN: N/A
TDP Link (URL): N/A
((3) Further dissemination of Restricted TDPs must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(4) Upon completion of the purposes for which the Restricted technical data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
(f) Questions related to registration in FBO should be directed to http://www.fbo.gov/index . The FBO helpdesk phone number is (866)606-
8820. Vendors are responsible for placing correct information in FBO. A user guide for FBO can be found at http://www.fbo.gov/index -on the right of the screen is User Guides - click on Vendor.
AMMUNITION DATA CARDS AND REPORT OF CONTRACTOR BALLISTIC TESTING
(a) Ammunition Data Cards shall be prepared in accordance with MIL-STD-1168 and shall follow the format required by the World Wide Web application identified as WARP or Worldwide Ammunition-data Repository Program. Information provided in paragraphs 6.7 through 6.16 of
MIL-STD-1168 shall be considered mandatory requirements where all instances of the term "should" are considered to be replaced with the word "shall." This shall also include, if required on the DD Form 1423, a Report of Contractor Lot Acceptance/Ballistic Testing and
Acceptance and Description Sheets (for Propellants and Explosives). WARP will reside within the Munitions History Program (MHP).
Additional details on these WARP applications are provided below.
(b) MHP-WARP Access Procedures
(1) Government or Contractor employee with CAC and AKO account:
(a) Click on the MHP hyperlink which is https://mhp.redstone.army.mil/
(b) Enter CAC PIN when prompted
(c) Click on WARP (ADC)
6 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(d) Click on Help
(e) Click on WARP Request Access and follow instructions
(2) Contractor or Government employee without CAC and AKO account: MHP-WARP uses PKI authentication requiring a DoD approved digital certificate as a security measure to protect the integrity of stored data. There are three vendors that have been approved to issue DoD approved certificates per an External Certification Authority (ECA) program. You are required to use one of the approved vendors listed on the following DISA website: http://iase.disa.mil/pki/eca/index.html
A nominal fee is charged for each certificate. The Contractor, including any subcontractors, shall assume the responsibility for all costs of obtaining each digital certificate needed.
(3) After the required certificate is obtained:
(a) Click on the MHP-WARP hyperlink: https://mhpwarp.redstone.army.mil/
(b) Enter ECA password
(c) Click on Help and follow the instructions for obtaining the necessary access
(d) HELP Numbers are as follows:
MHP Access (256)313-2143; DSN 897-2143
JMC Quality Administrators for WARP issues (309)782-2697 or (309)782-7107
(e) Worldwide Ammunition-data Repository Program (WARP). An online users manual will provide additional help in the development of an ammunition data card. It is recommended that you download and read the users manual prior to inputting your initial data card. The user's manual also contains screen shots, which depict what the inputter will see during the ADC input process.
(f) Ammunition Data Card Input. ADC input allows current contractors and government facilities the capability to create, and submit for approval, ADCs which meet the format requirements of MIL-STD-1168. ADCs are automatically forwarded to the respective Government Agency Responsible for Acceptance (GARA). The GARA in most cases is the Defense Contract Management Agency (DCMA) Quality Assurance Representative (QAR), who reviews contractor input for accuracy and completeness, and after updating the disposition code for the specific lot, submits the ADC to the database. The inputter is granted access only to ADCs identified with its specific manufacturing code. The use of previously inputted ADCs through the TEMPLATE option significantly reduces input effort, while increasing accuracy and consistency of data.
(g) Email Notification. WARP provides immediate, automated notification to process participants when actions are required. When the contractor has completed an ADC submission, an email message is routed to the GARA advising that an ADC awaits review and approval. If the GARA approves the ADC as submitted, the ADC is released to the base and an email, with approved data card, is routed back to the originator. If the ADC requires modification or correction to conform with MIL-STD-1168 and contract requirements, an email is provided to the ADC originator advising that corrective action is required prior to approval.
(h) Information Updates. It is important that the System Administrators are apprised when a contractor receives a new contract. The contractor shall notify mailto:usarmy.ria.jmc.mbx.warp@mail.mil within 30 days after receipt of a new contract. Information to be included shall be the contract number, item, GARA, Manufacturer's identification symbol and the names of the individuals who will be inputting ADCs into the system. If you are a new contractor and do not have a Manufacturer's identification symbol, you can obtain one by sending an email to mailto:usarmy.ria.jmc.mbx.warp@mail.mil . The email must contain manufacturer's name, address where performance of the contract will take place, and a point of contact.
(1) In addition to its ADC function, WARP also serves as a repository for reports of contractor ballistic (or functional) testing. Whenever the contract requires contractor performance of ballistic testing, the results of such testing shall be captured by you, the performing contractor, within a specially designed Lot Acceptance Test Report (LATR) module.
(2) Within the LATR module, you are required to provide a report of any contractor ballistic/function testing and to submit the report in electronic format via the WWW. The report must be a .pdf file for the upload process to work.
(i) Acceptance and Description Sheets (for Propellants and Explosives) Module: The WARP application now contains an area for on-screen data entry capturing requirements per MIL-STD-1171 for Acceptance and Description Sheets with respect to contract specified Propellant, Chemical and Explosive constituents.
STATEMENT OF WORK - 2-D BAR CODING VERIFICATION
(a) As a logistics measure to improve inventory, accountability, security and control, the supplier is required to provide 2-D Bar
Codes in accordance with MIL-STD-129 and MIL-PRF-61002 and as further detailed in Section D of the contract.
7 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) An approval of the supplier's 2-D Bar Code Label is required before each product with a unique national stock number (NSN) or federally recognized number (FRN) shall be presented for acceptance to the Government Quality Assurance Representative. Prior to formal submission of product to the Government for acceptance, a first time sample of the supplier's initial 2-D Bar Coding Label, comprising of two (2) each of the exterior pack label and two (2) each of the pallet label, shall be submitted for approval to HQ, US Army Joint
Munitions Command, 1 Rock Island Arsenal, ATTN: AMSJM-QAP, Rock Island, IL 61299-6500 to be read by a High Performance Bar Code
Verification system.
(c) Within fifteen calendar days, the supplier will be notified electronically of the approval, conditional approval, or disapproval of the submitted 2-D Bar Code Label. A notice of conditional approval shall state any further actions required of the supplier. A notice of disapproval shall cite reasons for the disapproval.
(d) Once approval of the 2-D Bar Code Label is received, the supplier may begin presenting product to the Government for acceptance.
(e) During life cycle management of the product, the Government may randomly perform checks of the integrity and conformity of the 2-D
Bar Code labeling that is affixed to the supplier's product.
(f) The supplier is responsible for all costs associated with correcting 2-D Bar Code labels that do not meet contractual requirements.
CONFIGURATION MANAGEMENT DOCUMENTATION
(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, Notices of Revision (NORs), and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR (or equivalent) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or postproduction and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
*** END OF NARRATIVE C0001 ***
8 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
COMMERCIAL UNITIZATION/PALLETIZATION
(a) Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more, unless skids or other forklift handling features are included in the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease in stacking.
(b) A palletized load shall not exceed 4,000 pounds and should not exceed 52 inches in length or width, or 54 inches in height. When the item being palletized is ammunition/explosive, at least one of the horizontal dimensions must be less than 47 inches. When level A packaging is required, a four-way entry pallet or pallet box, shall be used. All pallet loads shall contain the load in a manner that will permit safe, multiple rehandling during storage and shipment
The best commercial practice that will assure arrival at destination undamaged. Measures shall be made to prevent scratches on containers. Pallet boxes are acceptable.
PACKAGING REQUIREMENTS
(a) Packaging shall be in accordance with 9271047, revision B, dated 28 July 2011.
(b) When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.
(c) Marking shall be in accordance with 9271047, revision B, dated 28 July 2011. 2-D Barcodes are required in accordance with 12999545, Rev H, dated 02 April 2015.
EXCEPTION: N/A
DI-PACK-81059 IS NOT REQUIRED FOR THIS CONTRACT.
HEAT TREAT WOOD QUALITY MARKING:
In accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material
(WPM). Boxes/pallets and any wood used as inner packaging made of non manufactured wood shall be heat treated. All WPM shall be constructed from heat treated (treated to 56 degrees Celsius core temperature for 30 minutes) lumber and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment Marking. Each box/pallet shall be marked to show the conformance to the International Plant
Protection Convention Standard. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the stringer or block on diagonally opposite sides or ends of the pallet and be contrasting and clearly visible. All dunnage lumber used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved dunnage stamp on opposite surfaces. Foreign manufacturers shall have the heat treatment and marking of non manufactured wood products verified in accordance with the ISPM 15 compliance program.
*** END OF NARRATIVE D0001 ***
9 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
FIRST ARTICLE TEST (CONTRACTOR TESTING)
(a) The first article shall consist of: IAW MIL-DTL-2427H, sections 3.1 and 4.2 - 4.2.3 which shall be examined and tested in accordance with contract requirements, the item specifications, Quality Assurance Provisions (QAPS) and all drawings listed in the Technical Data
Package.
(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package provided by the Government.
(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAP(s), and specification(s) referenced thereon, except for:
(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.
(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.
(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the
First Article Test Report.
(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the
First Article Test Report.
(5) Onetime qualification tests, which are defined as a onetime on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the contractor's facility and certifications are submitted with the First Article Test Report.
(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(es) from which the first article was selected.
(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including suppliers and Vendor's inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The Government Quality Assurance Representative's (QAR) findings shall be documented on DD Form 1222, Request for and Results of Tests, and attached to the contractor's test report. Two copies of the First Article Test Report and the DD Form 1222 will be submitted through the Administrative Contracting Officer to the Contracting Officer with an additional information copy furnished to AMSJM-QAP/SOA.
(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 days, or (iii) Whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the Contractor shall notify the
Contracting Officer so that a determination can be made concerning the need for the additional first article sample or portion thereof, and instructions provided concerning the submission, inspection, and notification of results. Costs of the first article testing resulting from production process change, change in the place of performance, or material substitution shall be borne by the Contractor.
AMMUNITION DATA CARDS
Detailed requirements and guidance for the preparation of Ammunition Data Cards (ADCs) and Ammunition Lot Numbers are contained in
MILSTD-1168, DI-MISC-80043 and the Worldwide Ammunition-data Repository Program (WARP) online user's manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in
MIL-STD-1168 and the WARP users manual. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term "should" are considered to be replaced with the word "shall."
(a) The contractor shall develop and submit ADCs in accordance with the requirements of this clause, MIL-STD-1168, and the user's manual located on the WARP database. The WARP application is accessed through the Munitions History Program (MHP) website. (Refer to the clause
10 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
in Section C of this contract entitled "Statement of Work - Ammunition Data Cards, Report of Contractor Ballistic/Function
Testing" for more information.) The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(b) The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.
(c) Unless otherwise authorized by the Procuring Contracting Officer, the contractor shall include, in the components sections on the
ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.
End Item Component Listing:
Drawing Number Nomenclature
8797512 Swivel Assembly
8796523 Hasp
8796524 Hinge
8796520 Swivel Assembly
MIL-DTL-2427(h) Pargraph 3.10 Preservative Treatment
(d) The component items identified below are from paragraph (c) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168 and WARP requirements.
Drawing Number from paragraph (c) above N/A, components as follows:
Component
Drawing Number Nomenclature
N/A N/A
Drawing Number from paragraph (c) above N/A, components as follows:
Component
Drawing Number Nomenclature
N/A N/A
Drawing Number from paragraph (c) above N/A, components as follows:
Component
Drawing Number Nomenclature
N/A N/A
(e) Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements. Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components.
When not required by technical data package and not an end item or major component, the component lot number may be constructed through contractor lot number convention.
(f) The flowdown of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified inparagraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.
(g) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user's manual provides information on the level of detail required.
(h) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.
DESTRUCTIVE TESTING
(a) All costs for destructive testing by the Contractor and items destroyed by the Government are considered as being included in the contract unit price.
(b) Where destructive testing of items or components thereof is required by contract or specification, the number of items or components required to be destructively tested, whether destructively tested or not, shall be in addition to the quantity to the delivered to the
11 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Government as set forth in the Contract Schedule.
(c) All pieces of the complete First Article shall be considered as destructively tested items unless specifically exempted by other provisions of this contract.
(d) The Contractor shall not reuse any components from items used in a destructive test during First Article, lot acceptance in process testing, unless specifically authorized by the Contracting Officer.
(e) The Government reserves the right to take title to all or any items or components described above. The Government may take title to all or any items or components upon notice to the Contractor. The items or components of items to which the Government takes title shall be shipped in accordance with the Contracting Officer's instructions. Those items and components to which the Government does not obtain title shall be rendered inoperable and disposed of as scrap by the Contractor.
MIL-STD-1916
The Department of Defense (DoD) Preferred Methods for this Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.
REWORK AND REPAIR OF NONCONFORMING MATERIAL
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the
Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
*** END OF NARRATIVE E0001 ***
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
12 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2008 or equivalent; only design/development exclusions permitted
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
13 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
COGNIZANT TRANSPORTATION OFFICER
(a) The contract administration office designated at the time of contract award, or the office servicing the point of shipment if subsequently designated by the original office, will be the contact point to which the contractor will:
(1) Submit, as necessary, DD Form 1659, Application for U.S. Government Shipping Documentation/Instructions (Government Bill(s) of
Lading/Export or FMS Shipment), in triplicate at least ten days prior to date supplies will be available for shipment;
(2) Obtain shipping instructions as necessary for F.O.B. Destination delivery, and
(3) Furnish necessary information for MILSTRIP/MILSTAMP or other shipment documentation and movement control, including air and water terminal clearances.
(4) For FMS, at least ten days in advance of actual shipping date the contractor should request verification of "Ship to" and
"Notification" address from the appropriate DCMAO.
(b) The contract administration office will provide to the contractor data necessary for shipment marking and freight routing.
(c) The contractor shall not ship directly to a Military air or water port terminal without authorization by the designated point of contact.
SPECIAL TRANSPORT/LOADING REQUIREMENTS (NON-HAZARDOUS)
(a) In addition to the requirements set forth under General Provision, "Loading, Blocking and Bracing of Freight car Shipments," rail shipments will be loaded, blocked and braced in accordance with rules and methods contained in the current editions of Uniform Freight
Classification, Association of American Railroads Pamphlet No. 14, Circular 42G and Rules Governing Loading of Commodities on Open Top
Cars, as applicable. The Uniform Freight Classification may be procured from the regulatory classification agent covering territory from which shipment will be made or the Association of American Railroads, 1920 L Street, Washington, D.C. 20036. General information applicable to rail loading, blocking and bracing of the item may be secured from the
Contracting Officer or the Defense Contract Management Agency (DCMA).
(b) Truck shipments will be loaded, blocked and braced in accordance with rules and methods contained in the current editions of
National Motor Freight Classification and American Trucking Association, Inc., as applicable and effective at the time of shipment.
These publications may be procured from the American Trucking Association, Inc., Tariff Order Section, 1616 P Street, Washington, D.C.
20036. General information applicable to motor loading, blocking and bracing of this item may be secured from the Contracting Officer or the DCMA.
(c) TOFC "Piggyback" shipments will be loaded, blocked and braced in accordance with AAR Circular No. 43: copies may be obtained from addresses given in para (a) above. "General information applicable to blocking and bracing for TOFC shipments may be obtained from the
Contracting Officer or the DCMA.
(d) Except as the carrier(s) may be liable, the contractor shall be liable to the Government for any loss or damage resulting from improper loading and/or furnishing and installing dunnage material by the contractor for shipments to be made under this contract.
*** END OF NARRATIVE F0001 ***
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
F-2 52.242-15 STOP-WORK ORDER AUG/1989
14 61
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-4 52.247-34 F.O.B. DESTINATION NOV/1991
F-5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
F-6 252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION MAR/2016
(a) Definitions. As used in this clause--
"Automatic identification device" means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
"Concatenated unique item identifier" means
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number; and serial number within the original part, lot, or batch number.
"Data matrix" means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards
Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
"Data qualifier" means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
"DoD recognized unique identification equivalent" means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid_equivalents.html.
"DoD item unique identification" means a system of marking…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.