Attachment_2_-_Revised_Technical_Evaluation_01Apr2016.pdf

PDF 43 KB Posted

Attached to
Re-Roof Building 104
Solicitation number
W52P1J-16-R-5001
Issued by

About this file

Attachment 02 - Technical Evaluation Revised 01 Apr 2016

View the file

Other files

File Type Posted
W52P1J-16-R-5001 _Amendment_06.pdf PDF
W52P1J-16-R-5001 _Amendment_05.pdf PDF
W52P1J-16-R-5001_Amendment_04.pdf PDF
W52P1J-16-R-5001_Amendment_03.pdf PDF
B104_Roof_SOW_Rev__01Apr2016.pdf PDF
W52P1J-16-R-5001_Amendment_02.pdf PDF
W52P1J-16-R-5001_Amendment_01.pdf PDF
W52P1J-16-R-5001.pdf PDF
Att3DBWages.pdf PDF
Att4Nondisclosure.pdf PDF
Att1SOW.pdf PDF
Att2TE.pdf PDF
Att5PricingSheetBaseBid.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Qualification Evaluation PR 2015-5365, Re-Roof Building 104

Evaluation will be based upon the Contractor Proposal. The proposal must demonstrate a thorough understanding and compliance with the Scope of Work (SOW) and this request, and demonstrate the necessary experience to successfully complete the work set forth in the SOW.

The technical evaluation will be rated as either an Acceptable or Unacceptable. The ratings used and the descriptions are provided below.

The following are the minimum technical qualification requirements which must be addressed in the Contractor’s proposal and determined acceptable to be considered for award:

1) Contractor shall have a minimum of three years experience and capable of providing the manufacturers specified warranty. The Contractor must provide three projects that are similar size and scope, to include the following:

a. Contract Number and Award Date

b. Contracting Activity (Government or Commercial)

c. Contract Dollar Value

d. Points of Contact

2) Contractor shall provide documentation verifying the metal roof manufacturer has been in the business of manufacturing metal roof panels for a period of not less than five years.

The Government will evaluate the Contractor proposal against these minimum requirements to determine whether the proposal is technically acceptable or unacceptable, using the following ratings and descriptions:

Rating Description Acceptable Proposal meets all technical qualification requirements of the solicitation.

Unacceptable Proposal does not meet all technical qualification requirements of the solicitation.

Revised Date 01 Apr 2016