Att2TE.pdf

PDF 16 KB Posted

Attached to
Re-Roof Building 104
Solicitation number
W52P1J-16-R-5001
Issued by

About this file

Technical Evaluation

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Qualification Evaluation PR 2015-5365, Re-Roof Building 104

Evaluation will be based upon the Contractor Proposal. The proposal must demonstrate a thorough understanding and compliance with the Scope of Work (SOW) and this request, and demonstrate the necessary experience to successfully complete the work set forth in the SOW.

The technical evaluation will be rated as either an Acceptable or Unacceptable. The ratings used and the descriptions are provided below.

The following are the minimum technical qualification requirements which must be addressed in the Contractor’s proposal and determined acceptable to be considered for award:

1) Contractor shall have a minimum of three years experience as an approved, authorized, or licensed applicator with a roofing panel manufacturer, approved at a level capable of providing the manufacturers specified warranty. The Contractor must provide three projects that are similar size and scope, to include the following:

a. Contract Number and Award Date

b. Contracting Activity (Government or Commercial)

c. Contract Dollar Value

d. Points of Contact

2) Contractor shall provide documentation verifying the metal roof manufacturer has been in the business of manufacturing metal roof panels for a period of not less than five years.

3) Contractor shall be approved, authorized, or licensed in writing by the roof panel manufacturer.

The Government will evaluate the Contractor proposal against these minimum requirements to determine whether the proposal is technically acceptable or unacceptable, using the following ratings and descriptions:

Rating Description Acceptable Proposal meets all technical qualification requirements of the solicitation.

Unacceptable Proposal does not meet all technical qualification requirements of the solicitation.

File details come from the government source that posted it. Updated .