Attachment 0012

Detail SPC Requirements for M772 and M776 MTSQ Timing Fuze

At minimum, the following characteristics shall be monitored and analyzed for statistical process control:

1. Black Powder Output (testing using the agreed upon range(based on testing) as its limits)

2. Thickness between Rotor Cavity and Blind Hole