Attachment_0012_SPC_Requirement.pdf
PDF 54 KB Posted
- Attached to
- M772 AND M776 MTSQ FUZE
- Solicitation number
- W52P1J16R0131
About this file
Attachment 0012 - SPC Requirements
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0012
Detail SPC Requirements for M772 and M776 MTSQ Timing Fuze
At minimum, the following characteristics shall be monitored and analyzed for statistical process control:
1. Black Powder Output (testing using the agreed upon range(based on testing) as its limits)
2. Thickness between Rotor Cavity and Blind Hole
File details come from the government source that posted it. Updated .