Attach_0007_Engineering_Change_Proposal_(ECP).pdf
PDF 64 KB Posted
- Attached to
- Bombs Federal contract opportunity
- Solicitation number
- W52P1J16R0123
About this file
Attachment 0007
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20. NEED FOR CHANGE
ENGINEERING CHANGE PROPOSAL (ECP), PAGE 1
PREVIOUS EDITION MAY BE USED.
7. PRIORITY
9. BASELINE AFFECTED
4. ORIGINATOR
d. ECP NO. e. TYPE f. REV
a. MODEL/TYPE
8. ECP DESIGNATION
b. CAGE CODE c. SYSTEM DESIGNATION
6. JUST. CODE
5. CLASS OF ECP
10. OTHER SYS./CONFIG. ITEMS AFFECTED
3. DODAAC
1. DATE (YYYYMMDD) Form Approved OMB No. 0704-0188
a. RECOMMENDED ITEM EFFECTIVITY
c. ESTIMATED KIT DELIVERY SCHEDULE
b. SHIP/VEHICLE CLASS AFFECTED
d. LOCATIONS OR SHIP/VEHICLE NUMBERS AFFECTED
a. SYSTEM
b. DEVELOPMENT
c. PRODUCT
11. SPECIFICATIONS AFFECTED 12. DRAWINGS AFFECTED
14. CONTRACT NO. AND LINE ITEM
13. TITLE OF CHANGE
b. CODE c. TELEPHONE NO.
a. NAME (First, Middle Initial, Last)
a. NOMENCLATURE b. PART NO. c. NSN
16. CONFIGURATION ITEM NOMENCLATURE
18. ALL LOWER LEVEL ITEMS AFFECTED
17. IN PRODUCTION
21. PRODUCTION EFFECTIVITY BY SERIAL NUMBER 22. EFFECT ON PRODUCTION DELIVERY SCHEDULE
19. DESCRIPTION OF CHANGE
23. RETROFIT
h. GOVERNMENT ACTIVITY
d. GOVERNMENT ACTIVITY
i. SIGNATURE
e. SIGNATURE
j. DATE SIGNED (YYYYMMDD)
f. DATE SIGNED (YYYYMMDD)
27. APPROVAL/DISAPPROVAL
YES NO
2. PROCURING
ACTIVITY NO.
a. TYPED NAME (First, Middle Initial, Last)
FUNCTIONAL
ALLOCATED
PRODUCT
YES NO
b. ADDRESS (Street, City, State, Zip Code)
CAGE Code Specification/Document No. Rev. SCN CAGE Code Number Rev. NOR
15. PROCURING CONTRACTING OFFICER
24. ESTIMATED COSTS/SAVINGS UNDER CONTRACT
26. SUBMITTING ACTIVITY
25. ESTIMATED NET TOTAL COSTS/SAVINGS
a. AUTHORIZED SIGNATURE
b. TITLE
a. CLASS I b. CLASS II c. CLASS II
APPROVAL
RECOMMENDED
DISAPPROVAL
RECOMMENDED APPROVED DISAPPROVED
CONCUR IN CLASSIFI-
CATION OF CHANGE
DO NOT CONCUR IN CLASSI-
FICATION OF CHANGE
APPROVED
DISAPPROVED
g. APPROVAL
DD FORM 1692, AUG 96 (EG)
The public reporting burden for this collection of information is estimated to average 2 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THIS ADDRESS. RETURN COMPLETED FORM TO THE GOVERNMENT ISSUING CONTRACTING OFFICER FOR THE CONTRACT/PROCURING ACTIVITY NUMBER LISTED IN ITEM 2 OF THIS FORM.
Designed using Perform Pro, WHS/DIOR, Aug 96
| 1_DATE_YYYYMMDD: |
| FillText13: |
| 3_DODAAC: |
| a_TYPED_NAME_First_Middle: |
| b_ADDRESS_Street_City_Sta: |
| 5_CLASS_OF_ECP: |
| 6_JUST_CODE: |
| 7_PRIORITY: |
| a_MODELTYPE: |
| b_CAGE_CODE: |
| c_SYSTEM_DESIGNATION: |
| d_ECP_NO: |
| e_TYPE: |
| f_REV: |
| functional: |
| allocated: |
| product: |
| yesother: |
| noother: |
| CAGE_Code: |
| SpecificationDocument_No: |
| Rev1: |
| SCIA1: |
| CAGE_Code2: |
| SpecificationDocument_No1: |
| Rev3: |
| SCIA2: |
| CAGE_Code4: |
| SpecificationDocument_No2: |
| Rev5: |
| SCIA3: |
| CAGE_Code1: |
| Number1: |
| Rev2: |
| NOR1: |
| CAGE_Code3: |
| Number2: |
| Rev4: |
| NOR2: |
| CAGE_Code5: |
| Number3: |
| Rev6: |
| NOR3: |
| 13_TITLE_OF_CHANGE: |
| 14_CONTRACT_NO_AND_LINE_I: |
| a_NAME_First_Middle_Initi: |
| b_CODE: |
| c_TELEPHONE_NO: |
| 16_CONFIGURATION_ITEM_NOM: |
| YESPROD: |
| NOPROD: |
| a_NOMENCLATURE: |
| b_PART_NO: |
| c_NSN: |
| 19_DESCRIPTION_OF_CHANGE: |
| 20_NEED_FOR_CHANGE: |
| 21_PRODUCTION_EFFECTIVITY: |
| 22_EFFECT_ON_PRODUCTION_D: |
| a_RECOMMENDED_ITEM_EFFECT: |
| b_SHIPVEHICLE_CLASS_AFFEC: |
| c_ESTIMATED_KIT_DELIVERY: |
| d_LOCATIONS_OR_SHIPVEHICL: |
| 24_ESTIMATED_COSTSSAVINGS: |
| 25_ESTIMATED_NET_TOTAL_CO: |
| b_TITLE: |
| d_GOVERNMENT_ACTIVITY: |
| f_DATE_SIGNED_YYYYMMDD: |
| h_GOVERNMENT_ACTIVITY: |
| j_DATE_SIGNED_YYYYMMDD: |
| apprec: |
| disapprec: |
| classIIapp: |
| classIIdis: |
| concur: |
| nonconcur: |
| app: |
| disapp: |
| 11: |
| 12: |
| RESET_1: |
| RESET: |
| RESET_Cancel: |
File details come from the government source that posted it. Updated .