W52P1J16R0121-0001.pdf
PDF 17 KB Posted
- Attached to
- MK80 Series General Purpose Bomb Bodies
- Solicitation number
- W52P1J-16-R-0121
About this file
Solicitation W52P1J-16-R-0121, Amendment 0001
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2018JAN18
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
DANIELLE M. WALTERS
EMAIL: DANIELLE.M.WALTERS3.CIV@MAIL.MIL
W52P1J-16-R-0121
2018JAN16
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 5
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DANIELLE M. WALTERS
Buyer Office Symbol/Telephone Number: CCRC-AR/(309)782-4958
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of this Amendment 0001 to solicitation W52P1J-16-R-0121 is to do the following:
1. Revise C0001 - "Drawings/Specifications" - in Section C to update the Automated Data List for the MK83-7 configuration to revision
C, dated 12 December 2017.
2. Revise C0004 - "Phosphate Coating Requirement (Light)" in Section C.
3. Update the Price Matrix at Attachment 0001 in Section J based on a changed requirement to have unit prices submitted with and with out the base plate, drawing 923AS811, for the MK83-7 Bomb Body configuration. If resultant contract is awarded without the base plate, drawing 923AS811, it will be provided to GD-OTS as GFM.
4. All other terms and conditions of solicitation W52P1J-16-R-0121 remain unchanged.
*** END OF NARRATIVE A0002 ***
2 5
W52P1J-16-R-0121 0001
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C0001 - DRAWINGS/SPECIFICATIONS_______________________________
(a) In addition ot the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
QUALITY ASSURANCE PROVISIONS (QAP) FOR THE MK80 SERIES GENERAL PURPOSE BOMBS, REVISION H, DATED 20 JANUARY 2016 (ATTACHMENT 0008)
APPLIES.
(b) The following Drawings and Specifications in accordance with the Technical Data Package Listings identified as follows, wish revisions in effect as stated, are applicable to this procurement, and revisions of documents thereon:
ITEM: NSN: ADL REV DATE_______________________________________________________________________________
MK82-1 1325-00-585-3841 1380545 L 22 FEB 2016
MK82-6 1325-01-559-1663 923AS960 C 22 FEB 2016
MK83-4 1325-00-104-7268 2841464 P 22 FEB 2016
MK83-7 1325-01-564-9947 923AS790 C 12 DEC 2017
MK84-4 1325-00-008-1335 923AS105 M 22 FEB 2016
MK84-10 1325-01-548-1296 923AS425 C 22 FEB 2016
(c) Technical Data Packages, including any exceptions thereto, will be obtained electronically in accordance with "Technical Data
Package Information and Distribution and Destruction of Restricted Technical Data" in Section C of this document.
*** END OF NARRATIVE C0001 ***
C0004 -PHOSPHATE COATING REQUIREMENT (LIGHT)____________________________________________
The following requirements regarding phosphate coating are applicable in addition to those requirements set forth in specification TT-C-
490.
(a) Paragraph 3.2.1 of TT-C-490 refers to "Procedure approval". The written procedure, along with the panel submission requirements of paragraph (b), below, shall be sent to the designated contracting officer. The procedure shall include product names and manufacturers of all chemicals/materials to be used. The procedure shall include all processes, equipment, and controls, along with the testing and test frequencies used for phosphating, including the application of supplemental finishes.
(b) Paragraph 3.2.2 of TT-C-490 refers to "Preproduction validation panels". The contractor shall coat twelve (4 X 6 inch) panels (see
4.7.2) and six case sections (6 x 6 inch) by the proposed zinc phosphate coating procedure outlined for use in the contract. Case sections shall be made from cut sections of MK82, MK83, and/or MK84 bomb body assemblies (drawings 1380547, 923AS819, 2841466, and
923AS101) of the same substrate and surface finish to be used in production. Standard test coupons may be used for the twelve (4 x 6 inch) panels. Six of the panels and six of the case sections shall be coated with the primer to be used in production. The primer dry film thickness (DFT) shall be in the range specified on drawings 1380545, 923AS960, 2841464, 923AS790, 923AS105, and 923AS425. The nominal DFT shall be representative of the DFT to be used in production. Three of the non-primed panels shall be checked for phosphate coating weight, and the resultant coating weight test analysis report shall be provided to the procuring agency. Three of the primed coupons and three of the primed case sections shall be performance tested by the contractor in neutral salt spray for accelerated corrosion resistance (see 3.5.7), with the results documented (including photographs of each tested panel and segment) and reported to the procuring agency. The remaining six panels (three phosphated only; three phosphate plus primer) and three remaining primed case sections shall be forwarded to the procuring activity for evaluation and testing.
(c) Paragraph 3.5.6.2 of TT-C-490 refers to "Paint Adhesion of Non-CARC painted items". The adhesion testing requirements of 3.5.6.1 for
CARC paint shall be required in lieu of section 3.5.6.2 for all testing performed on this contract and shall not be as specified in
3.5.6.2 for non-CARC painted items. All adhesion testing of the MK82, MK83, and/or MK84 bomb body assemblies (drawings 1380547, 923AS819, 2841466, and 923AS101) shall be performed on production items and not on panels or segments. Production items sampled for
3 5
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
adhesion testing shall have their scribed areas subsequently touched-up with primer prior to submission for acceptance. Adhesion testing of sub-assemblies/smaller parts (not to include the MK82, MK83, or MK84 bomb body assemblies, drawings 1380547, 923AS819, 2841466, and
923AS101) shall be in accordance with TT-C-490F, para. 4.7.6.3 for non-CARC items.
(d) Paragraph 4.7.7 of TT-C-490 refers to "Accelerated corrosion resistance". All panels and case sections subjected to accelerated corrosion resistance testing (see 4.7.7) shall be scribed with two intersecting lines not less than 2 inches long in the shape of an 'X' using the scribe tool as described in ASTM D1654. Duration of accelerated corrosion resistance test shall be 336 hours minimum and shall be examined for compliance as specified in 3.5.7.
*** END OF NARRATIVE C0004 ***
4 5
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION J - LIST OF ATTACHMENTS
List of Number List of Number
Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________
Attachment 0001 PRICE MATRIX 18-JAN-2018
5 5
| SECTION A |
| SECTION C |
| SECTION J |
File details come from the government source that posted it.