DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 3 of 17 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
QUALITY PROGRAM PLAN (QPP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Documentation No.)
DI-QCIC-81722
5. CONTRACT REFERENCE
SECTION E (SEE BLK 16)
6. REQUIRING OFFICE
AMSJM-QAP
7. DD 250 REQ.
XX
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final
Reg Repro
16. REMARKS:
BLK 5: THE QUALITY PROGRAM PLAN (QPP) SHALL DOCUMENT
THE CONTRACTOR’S IMPLEMENTATION OF A QUALITY SYSTEM IN
ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP).
BLK 12: THE QPP SHALL BE SUBMITTED NO LATER THAN 150
CALENDAR DAYS AFTER CONTRACT AWARD AND NO LATER
THAN 60 CALENDAR DAYS PRIOR TO FIRST ARTICLE TESTING (IF
FIRST ARTICLE TESTING IS REQUIRED), PRODUCTION, AND/OR
ALL ACCEPTANCE OF PRODUCT UNDER THE CONTRACT. THE
GOVERNMENT REQUIRES 30 DAYS FOR REVIEW. DISPOSITION
OF THE QPP WILL BE PROVIDED THROUGH THE PROCURING
CONTRACTING OFFICER (PCO). IF FURTHER REVISIONS ARE
NECESSARY, THE CONTRACTOR SHALL HAVE 15 DAYS TO
PROVIDE REVISIONS AND THE GOVERNMENT SHALL REVIEW
AND PROVIDE DISPOSITION WITHIN 15 DAYS OF RECEIPT. THE
QPP SHALL BE APPROVED PRIOR TO FAT, IF FAT IS REQUIRED,
OR PRIOR TO INITIATION OF PRODUCTION.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND
APPROVAL PRIOR TO IMPLEMENTATION.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR
CDRLS.
AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 7 0
G. PREPARED BY
Jan Murphy NAWC-WD, China Lake, CA 93555-6100
H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 4 of 17 Pages
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
STATISTICAL PROCESS CONTROL PLAN
3. SUBTITLE
4. AUTHORITY (Data Acquisition Documentation No.)
DI-MGMT-81987
5. CONTRACT REFERENCE
SECTION E
6. REQUIRING OFFICE
AMSJM-QAP
7. DD 250 REQ.
XX
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final Reg Repro
16. REMARKS:
BLK 12: THE GENERAL PLAN SHALL BE SUBMITTED NO LATER THAN
150 CALENDAR DAYS AFTER CONTRACT AWARD AND NO LATER THAN
60 CALENDAR DAYS PRIOR TO FIRST ARTICLE TESTING (IF FIRST
ARTICLE TESTING IS REQUIRED), PRODUCTION, AND/OR ALL
ACCEPTANCE OF PRODUCT UNDER THE CONTRACT. THE DETAILED
PLAN SHALL BE SUBMITTED 30 DAYS AFTER FAT, IF FAT IS REQUIRED,
OR 30 DAYS AFTER INITIATION OF PRODUCTION. THE GOVERNMENT
REQUIRES 30 DAYS FOR REVIEW. DISPOSITION OF THE GENERAL AND
DETAILED SECTIONS WILL BE PROVIDED THROUGH THE PROCURING
CONTRACTING OFFICER (PCO). IF FURTHER REVISIONS ARE
NECESSARY, THE CONTRACTOR SHALL HAVE 15 DAYS TO PROVIDE
REVISIONS AND THE GOVERNMENT SHALL REVIEW AND PROVIDE
DISPOSITION WITHIN 15 DAYS OF RECEIPT.
BLK 13: SUBMIT UPDATE/REVISIONS FOR REVIEW AND APPROVAL
PRIOR TO IMPLEMENTATION TO COREY.J.HOTLE.CIV@MAIL.MIL.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 7 0
G. PREPARED BY
Jan Murphy
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 5 of 17 Pages
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
INSPECTION AND TEST PLAN
3. SUBTITLE
4. AUTHORITY (Data Acquisition Documentation No.)
DI-QCIC-81110
5. CONTRACT REFERENCE
SECTION E (SEE BLK 16)
6. REQUIRING OFFICE
AMSJM-QAP
7. DD 250 REQ.
XX
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final Reg Repro
16. REMARKS:
BLK 5: THE INSPECTION AND TEST PLAN (ITP) SHALL BE IN
ACCORDANCE WITH THE QUALITY ASSURANCE PROVISION (QAP).
BLK 12: THE ITP SHALL BE SUBMITTED NO LATER THAN 150 CALENDAR
DAYS AFTER CONTRACT AWARD AND NO LATER THAN 60 CALENDAR
DAYS PRIOR TO FIRST ARTICLE TESTING (IF FIRST ARTICLE TESTING IS
REQUIRED), PRODUCTION, AND/OR ALL ACCEPTANCE OF PRODUCT
UNDER THE CONTRACT. THE GOVERNMENT REQUIRES 30 DAYS FOR
REVIEW. DISPOSITION OF THE ITP WILL BE PROVIDED THROUGH THE
PROCURING CONTRACTING OFFICER (PCO). IF FURTHER REVISIONS
ARE NECESSARY, THE CONTRACTOR SHALL HAVE 15 DAYS TO
PROVIDE REVISIONS AND THE GOVERNMENT SHALL REVIEW AND
PROVIDE DISPOSITION WITHIN 15 DAYS. THE ITP SHALL BE APPROVED
PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR TO INITIATION OF
PRODUCTION.
BLK 13: SUBMIT UPDATES FOR REVIEW AND APPROVAL PRIOR
TO IMPLEMENTATION TO COREY.J.HOTLE.CIV@MAIL.MIL.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 7 0
G. PREPARED BY
Jan Murphy
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 6 of 17 Pages
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
MEASUREMENT SYSTEM EVALUATION (MSE) -
MEASUREMENT AND INSPECTION EQUIPMENT
SYSTEM DESIGN DOCUMENTATION FOR
ACCEPTANCE OF PRODUCT
3. SUBTITLE
ACCEPTANCE INSPECTION EQUIPMENT
4. AUTHORITY (Data Acquisition Documentation No.)
DI-QCIC-81960
5. CONTRACT REFERENCE
SECTION E MSE CLAUSE
6. REQUIRING OFFICE
NSWC (MS-21)
7. DD 250 REQ.
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ (SEE
BLK 16)
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final Reg Repro
16. REMARKS:
BLKS 10, 12: THE CONTRACTOR SHALL SUBMIT A COMPLETED
ACCEPTANCE INSPECTION EQUIPMENT (AIE) PACKAGE NO LATER
THAN 150 CALENDAR DAYS AFTER CONTRACT AWARD AND NO
LATER THAN 60 CALENDAR DAYS PRIOR TO FIRST ARTICLE TESTING
(IF FIRST ARTICLE TESTING IS REQUIRED), PRODUCTION, AND/OR
ALL ACCEPTANCE OF PRODUCT UNDER THE CONTRACT. THE
GOVERNMENT WILL PROVIDE DISPOSITION WITHIN 45 DAYS AFTER
FINAL AIE PACKAGE RECEIPT.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE
CONTRACTOR SHALL HAVE 30 DAYS TO GENERATE REVISIONS
AND THE GOVERNMENT SHALL HAVE 30 DAYS TO REVIEW AND
RESPOND. THE APPROVED AIE SHALL BE AVAILABLE FOR FIRST
ARTICLE TESTING (IF FIRST ARTICLE TESTING IS REQUIRED),
PRODUCTION, AND/OR ALL ACCEPTANCE OF PRODUCT UNDER THE
CONTRACT.
IF CONTRACTOR REVISES A PREVIOUSLY GOVERNMENT-ACCEPTED
AIE FOR THIS CONTRACT, THE REVISED AIE MUST BE SUBMITTED TO
THE GOVERNMENT FOR REVIEW AND APPROVAL. GOVERNMENT
APPROVAL MUST BE GRANTED BEFORE AIE IS USED FOR
ACCEPTANCE OF PRODUCT. THE GOVERNMENT WILL RESPOND
WITHIN 30 DAYS AFTER RECEIPT OF AIE.
THE CONTRACTOR SHALL NOTIFY THE RESPONSIBLE
GOVERNMENT TECHNICAL AGENCY WITHIN A MINIMUM OF 30
DAYS PRIOR TO ACCEPTANCE (PROVE OUT) TESTING.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
NSWC (MS-21) 0 1 0
NAWCWD (685200D) 0 1 0
AMSJM-QAP 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 8 0
G. PREPARED BY
Jan Murphy
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
REQUEST FOR VARIANCE (RFV)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Documentation No.)
DI-SESS-80640D
5. CONTRACT REFERENCE
SECTION C
6. REQUIRING OFFICE
NAWCWD (685200D)
7. DD 250 REQ.
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ (SEE
BLK 16)
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final Reg Repro
16. REMARKS:
BLK 4: TAILOR DATA ITEM DESCRIPTION (DID) AS FOLLOWS: DELETE
PARA 2, SUBMIT REQUEST FOR VARIANCE (RFV) ON DD FORM 1694,
AND INCLUDE IN THE CONTENT OF THE RFV ADEQUATE
DATA/ANALYSIS/TESTING TO SUPPORT THE REQUEST FOR
DEVIATION.
BLKS 10, 12, 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT A
RFV FOR EACH VARIANCE ON DD FORM 1694. DD FORM IS LOCATED
AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 5 0
G. PREPARED BY
Jan Murphy NAWC-WD, China Lake, CA 93555-6100
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. 7 of 17 Pages
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
ENGINEERING CHANGE PROPOSAL (ECP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Documentation No.)
DI-SESS-80639D
5. CONTRACT REFERENCE
SECTION C
6. REQUIRING OFFICE
NAWCWD (685200D)
7. DD 250 REQ.
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ (SEE
BLK 16)
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final Reg Repro
16. REMARKS:
BLK 4: TAILOR DATA ITEM DESCRIPTION (DID) AS FOLLOWS:
DELETE PARA 2 AND SUBMIT ENGINEERING CHANGE PROPOSAL
(ECP) ON DD FORM 1692. SUBMIT TEXT FILES IN GOVERNMENT
COMPATIBLE MICROSOFT WORD AND VIEW FILES IN
GOVERNMENT COMPATIBLE ADOBE ACROBAT. FOR DRAWINGS
SUBMIT PDF VIEW FILES IN GOVERNMENT COMPATIBLE ADOBE
ACROBAT.
BLKS 10, 12, 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT
AN ECP ON DD FORM 1692. DD FORM IS LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 5 0
G. PREPARED BY
Jan Murphy NAWC-WD, China Lake, CA 93555-6100
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 8 of 17 Pages
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 9 of 17 Pages
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
NOTICE OF REVISION (NOR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Documentation No.)
DI-SESS-80642D
5. CONTRACT REFERENCE
SECTION C
6. REQUIRING OFFICE
NAWCWD (685200D)
7. DD 250 REQ.
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ (SEE
BLK 16)
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final Reg Repro
16. REMARKS:
BLK 4: TAILOR DATA ITEM DESCRIPTION (DID) AS FOLLOWS: DELETE
PARA 2 AND SUBMIT NOTICE OF REVISION (NOR) ON DD FORM 1695.
BLKS 10, 12, 13: THE CONTRACTOR SHALL PREPARE AND SUBMIT
A NOR ON DD FORM 1695 FOR EACH DRAWING, ASSOCIATED
LIST, OR OTHER REFERENCED DOCUMENT WHICH REQUIRES
REVISION AND SUBMIT NOR WITH THE ECP. DD FORM IS
LOCATED AT:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 5 0
G. PREPARED BY
Jan Murphy
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 10 of 17 Pages
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
TEST/INSPECTION REPORT
3. SUBTITLE
FIRST ARTICLE TEST REPORT
4. AUTHORITY (Data Acquisition Documentation No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
SECTION E
6. REQUIRING OFFICE
AMSJM-QAP
7. DD 250 REQ.
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final Reg Repro
16. REMARKS:
BLKS 10, 12, 13: THE FIRST ARTICLE TEST (FAT) REPORT SHALL BE
SUBMITTED WITH QAR FINDINGS ON DD FORM 1222. FAT REPORT
SHALL BE SUBMITTED WITHIN 30 DAYS AFTER COMPLETION OF FAT.
THE GOVERNMENT REQUIRES 30 DAYS FOR REVIEW. DISPOSITION
OF THE FAT REPORT WILL BE PROVIDED THROUGH THE PCO TO
COREY.J.HOTLE.CIV@MAIL.MIL. FAT MUST BE APPROVED PRIOR TO
PRODUCTION.
BLK 13: IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR
SHALL HAVE 15 DAYS TO GENERATE REVISIONS AND THE
GOVERNMENT SHALL HAVE 15 DAYS TO REVIEW AND RESPOND.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 7 0
G. PREPARED BY
Jan Murphy
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 11 of 17 Pages
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
TEST/INSPECTION REPORT
3. SUBTITLE
LOT ACCEPTANCE TEST REPORT
4. AUTHORITY (Data Acquisition Documentation No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
SECTION E
6. REQUIRING OFFICE
DCMA-MCWB (QAR)
7. DD 250 REQ.
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ (SEE
BLK 16)
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final Reg Repro
16. REMARKS:
BLK 4: LAT REPORTS SHALL CONTAIN ALL INSPECTION RECORDS OF
CLASSIFIED CHARCTERISTIC SAMPLES AND ANY OTHER TESTS
REQUIRED FOR EACH LOT PER THE CONTRACT. LAT REPORTS
SHALL CONTAIN ALL INSPECTION RECORDS OF CLASSIFIED
CHARACTERISTIC SAMPLES AND ANY OTHER TESTS REQUIRED FOR
EACH LOT PER THE CONTRACT.
BLKS 10, 12, 13: SUBMISSION OF LOT ACCEPTANCE TEST (LAT)
REPORTS AND PRODUCTION ACCEPTANCE TEST REPORTS SHALL BE
NO LATER THAN 30 DAYS AFTER LAT. THE QAR WILL PROVIDE
DISPOSITION OF LOT/PRODUCTION ACCEPTANCE TEST REPORTS.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS
OR BY ACCESSING THE WORLDWIDE AMMUNITION DATA
REPOSITORY PROGRAM (WARP), WHICH IS LOCATED AT
HTTPS://MHP.REDSTONE.ARMY.MIL
DCMA-MCWB (QAR) 0 1 0
AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 7 0
G. PREPARED BY
Jan Murphy
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 12 of 17 Pages
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A010 AMMUNITION DATA CARD
3. SUBTITLE
4. AUTHORITY (Data Acquisition Documentation No.)
DI-MISC-80043B
5. CONTRACT REFERENCE
SECTION C, MIL-STD-1168
6. REQUIRING OFFICE
AMSJM-QAP
7. DD 250 REQ.
NO
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ (SEE
BLK 16)
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final Reg Repro
16. REMARKS:
BLKS 10, 12, 13: AMMUNITION DATA CARDS (ADC) SHALL BE
PREPARED IAW MIL-STD-1168, SECTION C, AND BY ACCESSING THE
WORLDWIDE AMMUNITION DATA REPOSITORY PROGRAM (WARP),
WHICH IS LOCATED AT HTTPS://MHP.REDSTONE.ARMY.MIL.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
*HARD COPY ADC PROVIDED WITH LOT SHIPMENTS SHALL BE
GENERATED FROM THE WARP PROGRAM AND SIGNED AND DATED
BY THE GOVERNMENT AGENCY RESPONSIBLE FOR ACCEPTANCE
(GARA).
**WHEN BALLISTIC TESTS ARE REQUIRED, ONE HARD COPY
GENERATED FROM THE WARP PROGRAM SIGNED AND DATED BY THE
GARA SHALL BE SENT TO THE PROVING GROUND WITH SAMPLE
SHIPMENT, PLUS AN ADDITIONAL SIGNED, HARD COPY PROVIDED TO
THE PROVING GROUND BY MAIL.
DCMA-MCWB (QAR) 0 1 0
WARP 0 1 0
LOT SHIPMENT* 0 2 0
MAIL TO DEST** 0 2 0
15. TOTAL 0 6 0
G. PREPARED BY
Jan Murphy
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. 13 of 17 Pages
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM
E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
FAILURE ANALYSIS AND CORRECTIVE
ACTION REPORT (FACAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Documentation No.)
DI-SESS-81315B
5. CONTRACT REFERENCE
SECTION E (SEE BLK 16)
6. REQUIRING OFFICE
AMSJM-QAP
7. DD 250 REQ.
LT
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ (SEE
BLK 16)
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final Reg Repro
16. REMARKS:
BLK 5: THE FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT
(FACAR) SHALL BE IN ACCORDANCE WITH THE QUALITY
ASSURANCE PROVISION (QAP).
BLKS 10, 12, 13: CONTRACTOR SHALL NOTIFY NAWCWD (QA), NAWCWD
(685200D) AND AMSJM-QAP VIA EMAIL WITHIN 24 HOURS AFTER THE
OCCURRENCE OF A FAILURE DURING ACCEPTANCE TESTING;
INCLUDING, BUT NOT LIMITED TO, ANY FAILURES DURING FAT/LAT AND
ANY DESTRUCTIVE/NONDESTRUCTIVE TEST FAILURES. FORMAL
SUBMITTAL SHALL BE NO LATER THAN 10 DAYS AFTER REPORTED
FAILURE. FINAL REPORT SHALL BE SUBMITTED NO LATER THAN 30
DAYS AFTER DETERMINING/CONDUCTING ROOT CAUSE FAILURE
ANALYSIS.
BLK 14: SUBMIT VIA EMAIL OR AMRDEC SAFESITE IN
ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS
AND COREY.J.HOTLE.CIV@MAIL.MIL.
AMSJM-QAP 0 1 0
NAWCWD (685200D) 0 1 0
NAWCWD (QA) 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 7 0
G. PREPARED BY
Jan Murphy
DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 14 of 17 Pages
(1 Data Item)
Form Approved OMB No. 0704-
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
BOMB, GENERAL PURPOSE, 1000
POUND, MK 83 MOD 4, EMPTY BODY
ASSEMBLY
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
TEST PROCEDURE
3. SUBTITLE
PHOSPHATE COATING PRE-PRODUCTION PROCEDURE
4. AUTHORITY (Data Acquisition Documentation No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
SECTION E (SEE BLK 16)
6. REQUIRING OFFICE
NAWCWD (QA)
7. DD 250 REQ.
XX
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
ASREQ (SEE
BLK 16)
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF
SUBSEQUENT
SUBMISSION
ASREQ (SEE
BLK 16)
Draft
Final
Reg Repro
16. REMARKS:
BLK 12: THE TEST PLAN/PHOSPHATE COATING PRE-PRODUCTION
PROCEDURE SHALL BE SUBMITTED 60 DAYS PRIOR TO FAT.
IF FURTHER REVISIONS ARE NECESSARY, THE CONTRACTOR SHALL
HAVE 15 DAYS TO PROVIDE REVISIONS AND THE GOVERNMENT SHALL
REVIEW AND PROVIDE DISPOSITION WITHIN 15 DAYS OF RECEIPT.
THE TEST PLAN/PHOSPHATE COATING PRE-PRODUCTION PROCEDURE
SHALL BE APPROVED PRIOR TO FAT, IF FAT IS REQUIRED, OR PRIOR TO
INITIATION OF PRODUCTION.
BLK 13: SUBMIT UPDATES/REVISIONS FOR REVIEW AND APPROVAL PRIOR
TO PRODUCTION.
BLK 14: SUBMIT VIA THE INTERNET OR AMRDEC SAFESITE
IN ACCORDANCE WITH ATTACHED LIST OF ADDRESSES FOR CDRLS.
NAWCWD (QA) 0 1 0
NAWCWD (685200D) 0 1 0
AMSJM-QAP 0 1 0
AFLCMC/EBHCB 0 1 0
DCMA-MCWB (QAR) 0 1 0
CCRC-AR 0 1 0
SFAE-AMO-JP 0 1 0
15. TOTAL 0 7 0
G. PREPARED BY
Jan Murphy
H. DATE I. APPROVED BY
1. DATA ITEM NO. 17. PRICE
GROUP
A013
18. ESTIMATED
TOTAL PRICE
XX
8. APP CODE
0 1 0
0 1 0
Page: 15 of 17DD Form 1423-1, FEB 2001 Previous editions may be used.
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Kristy Mosher for SDMO, RDAR-EIS-PD
DELETE REFERENCE 'APPLYING OPSEC TO U.S. GOVERNMENT CONTRACTS'. REPLACE WITH REFERENCE 'SAMPLE ACQUISITIONS OPSEC PLAN'. 10 CALENDAR DAYS REQUIRED FOR GOVERNMENT REVIEW AND APPROVAL. *30 CALENDAR DAYS AFTER THE CONTRACTING OFFICER PROVIDES THE LIST OF KNOWN
CRITICAL INFORMATION (CI)/THREAT INFORMATION. ** RESUBMIT 10 CALENDAR DAYS AFTER
GOVERNMENT REVIEW. SUBMIT ELECTRONICALLY TO usarmy.ria.jmc.mbx.OPSEC-FD@mail.mil.
CO**
A ASREQ Reg Repro
ASREQ**
16. REMARKS AMSJM-FP/G2
D
ONE/R ASREQ*
a. ADDRESSEE
b. COPIES
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION
Draft
Final
7. DD 250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80934C PADDS Clause HS7001 AMSJM-FP/G2
2. TITLE OF DATA ITEM 3. SUBTITLE
Operations Security (OPSEC) Plan OPSEC Program
TDP____________ TM____________ OTHER____________
D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
Form Approved OMB No. 0704-0188
20 April 2016
R18B07J9HIBOMB, GENERAL PURPOSE, 10000 LB
MK83 MOD 4 EMPTY BODY ASSY
0 2 0
FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of
CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.
The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423 (BACK)
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
INSTRUCTIONS FOR COMPLETING DD FORM 1423
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
LIST OF ADDRESSES FOR CONTRACT DATA REQUIREMENTS LIST (CDRLS),
FOR 80 BOMBS SERIES
CCRC-AR
HQ, ARMY CONTRACTING COMMAND
ROCK ISLAND CONTRACTING CENTER
(ACC-RI)
ATTN: CCRC-AR, (D. WALTERS)
1 ROCK ISLAND ARSENAL
ROCK ISLAND, IL 61299-6500
E-MAIL: danielle.m.walters3.civ@mail.mil
NAWCWD (685200D)
COMMANDER
NAVAL AIR WARFARE CENTER WEAPONS
DIVISION
ATTN: CODE 685200D (DATA MANAGER)
1 ADMINISTRATION CIRCLE M/S 6811
CHINA LAKE, CA 93555
E-MAIL: CHLK_47JPAWS@navy.mil
AMSJM-QAP
JOINT MUNITION COMMAND
ATTN: AMSJM-QAP (COREY HOTLE)
2695 RODMAN AVENUE
BLDG 350, 4TH FL/NORTH BAY/ POST F2
ROCK ISLAND, IL 61299-8000
EMAIL: corey.j.hotle.civ@mail.mil
NSWC (MS-21)
NAVAL SURFACE WARFARE CENTER
ATTN: CODE MS-21 (ADAM WIDBY)
1999 FOURTH STREET
NORCO, CA 92860
E-MAIL: adam.widby@navy.mil
AFLCMC/EBHCB
AIR FORCE LIFE CYCLE MANAGEMENT
CENTER (AFLCMC/EBHCB)
ATTN: SARA PARSON
6043 ELM LANE, BLDG 1246
HILL AFB, UT 84056-5816
E-MAIL: sara.parson.1@us.af.mil
NAWCWD (QA)
COMMANDER
NAVAL AIR WARFARE CENTER WEAPONS
DIVISION
ATTN: CODE 419400D
(QUALITY ASSURANCE/ENGINEERING)
1 ADMINISTRATION CIRCLE, MS 6811
CHINA LAKE, CA 93555
E-MAIL: CHLK_PAWSQA@navy.mil
SFAE-AMO-JP
PROJECT DIRECTOR JOINT PRODUCTS
SFAE-AMO-JP/BUILDING 1N
BUFFINGTON ROAD
PICATINNY ARSENAL, NJ 07806-5000
EMAIL: usarmy.pica.peo-ammo.mbx.pd-joint-products@mail.mil
DCMA/MCWB (QAR)
TO BE DETERMINED AT CONTRACT AWARD
| Correction Letter |
| Enclosure 2- Revised Address List |
| R18B07J9HI_opsec.pdf |
| 80934A__bomb_opsec.pdf |
| 80934a |
| INSTRUCTIONS_for_adding.pdf |
| 80603L |
| 80934a |
| 80639 |
| 80640 |
| 80642 |
| 81722 |
| 80043 |
| 81307 |
| 81315 |
| 80809B |
| 81987spc |
| Instructions |
| spc_81987.pdf |
| 81987_spc |
File details come from the government source that posted it.