W52P1J-16-R-0003.pdf

PDF 215 KB Posted

Attached to
EAGLE Materiel Management Team (MMT) RFP - Supply Services
Solicitation number
W52P1J16R0003
Issued by

About this file

EAGLE Materiel Management Team (MMT) Request for Proposal (RFP)

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W52P1J-16-R-0003 X

2016JUL0803:00pm

DOA6

SEE SCHEDULE

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

JENNIFER L. KRANTZ

(309)782-1299

CCRC-FE

JENNIFER.L.KRANTZ4.CIV@MAIL.MIL

1 84

X 1

X 5 X 6

X 7 X 8

X 9

X 11

X 14

X 37

X 38

X 65

X 78

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: JENNIFER L. KRANTZ

Buyer Office Symbol/Telephone Number: CCRC-FE/(309)782-1299

Type of Contract 1: Firm Fixed Price

Kind of Contract: Service Contracts

*** End of Narrative A0000 ***

THIS REQUEST FOR PROPOSAL (RFP) WILL BE COMPETED AMONGST ONLY THOSE OFFERORS THAT HOLD AN ENHANCED ARMY GLOBAL LOGISTICS ENTERPRISE

(EAGLE) BASIC ORDERING AGREEMENT (BOA) BY THE CLOSING DATE OF THIS RFP. THIS ACQUISITION IS A SMALL BUSINESS SET-ASIDE AND ONLY BOA

HOLDERS WHO CAN CERTIFY SMALL BUSINESS STATUS UNDER NAICS CODE 561210 BY THE CLOSING DATE OF THIS RFP WILL BE CONSIDERED FOR AWARD.

A.1 The U.S. Army Materiel Management Team (MMT) has a requirement for logistics support services, including supply support.

A.2 This is the official RFP and supporting documentation for the MMT requirement. Industry feedback received on the DRAFT documents was taken into consideration in the preparation of the final RFP documents. Please note that the Government answers provided in response to the feedback received on the DRAFT documents are not incorporated into this RFP.

A.3 This RFP is a small business set-aside and will be competed among those Offerors that hold an Enhanced Army Global Logistics

Enterprise (EAGLE) Program Basic Ordering Agreement (BOA) who can certify small business status under NAICS Code 561210 by the closing date of this RFP. This RFP will result in a Firm Fixed Priced (FFP) task order with some non-fee bearing Cost Reimbursable CLINs, with one (1) 12 month base period, to include a 30 day transition-in period, and four (4) 1-year options, for a total of five (5) years if all options are exercised. The evaluated option periods, which will be awarded at the Government's sole discretion, will be based on need and performance of contractors.

A.4 The period of performance for each Contract Line Item Number (CLIN) from contract award through 1825 Days after contract award is identified below:

CLIN SERVICE PERIOD OF PERFORMANCE:

Base Year (includes 30 day Transition-In): CLINs 0001-0006, Notice to Proceed (NTP) - 365 days after NTP

Option Year 1: CLINs 1001-1006, 366 days after NTP - 730 days after NTP

Option Year 2: CLINs 2001-2006, 731 days after NTP - 1095 days after NTP

Option Year 3: CLINs 3001-3006, 1096 days after NTP - 1460 days after NTP

Option Year 4: CLINs 4001-4006, 1461 days after NTP - 1825 days after NTP

Transition and Fully Operational Capability (FOC) efforts are part of a single requirement and Period of Performance. All Transition efforts are still required to be completed within the first 30 days of performance; however, transition to FOC is part of a seamless process. The Contracting Officer may authorize proceeding into FOC as various elements of transition are complete prior to the end of the 30 day Transition period.

A.5 This Best Value source selection process will include an evaluation of the following three (3) factors: (1) Technical, (2) Past

Performance and (3) Cost/Price. A task order award under this EAGLE competition will be made to the Offeror determined to be responsible (in accordance with FAR 9.1) whose proposal conforms to the RFP requirements and is determined to be the lowest evaluated

(fair and reasonable) priced proposal that is determined Technically Acceptable with Substantial Confidence in past performance.

A.6 The Offeror's proposal shall be valid for 180 days from the closing date of the RFP.

A.7 The incumbent contractors are L-3 Communications Vertex Aerospace LLC, contract W911SE-07-D-0015-1N04 and XOtech, LLC, contract

W52P1J-12-G-0021-0001.

A.8 For the purposes of this Task Order RFP:

A Teammate is defined as a Joint Venture partner and/or Subcontractor that is included in the Offeror's BOA Attachment 0002 - Team

Arrangement by the closing date of the Task Order RFP.

A.9 FAR Clause 52.219-14 Limitations on Subcontracting (NOV 2011): Offerors are put on notice that they are required to follow the requirements of FAR Clause 52.219-14 - Limitations on Subcontracting as currently written. Until such time as the FAR is updated to reflect any regulation changes prescribed by Section 1651 of the National Defense Authorizations Act of FY 2013, Offerors must comply with the current FAR Clause as written.

A.10 Government Furnished Facilities and Equipment are identified in the Technical Exhibits in Section J of this RFP and identified in the Performance Work Statement (PWS).

2 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A.11 Please note that this RFP contains a Section B, "Supplies or Services and Prices/Costs"; however, Offerors are required to complete and submit the Cost/Price Matrix identified as Attachment 0005.

A.12 The Government intends to conduct a Post Award Conference with the awardee following task order award.

A.13 This RFP should not be discussed with any Government employee except the Procuring Contracting Officer (PCO), Andrea C. Lovell or

Contract Specialist, Jennifer L. Krantz. Mrs. Andrea C. Lovell and Ms. Jennifer L. Krantz may be contacted at mailto:usarmy.RIA.acc.mbx.eagle@mail.mil.

A.14 This RFP and any amendments to this RFP shall be issued electronically. Because of this, the Government is under no obligation to maintain an Offerors mailing list. Any EAGLE BOA holders interested in this requirement must periodically access the FEDBIZOPS at https://www.fbo.gov/ to obtain the RFP and any amendments that may be issued. Failure to provide proposals in accordance with the ____________________________________________________ instructions/format specified in this RFP shall render the Offerors proposal non-compliant. The proposal will not be evaluated and will_________________________________________________________________________________________________________________________________________ not be further considered for award.____________________________________

A.15 The Government is not obligated to provide responses to any questions submitted by Offerors, but will consider them and incorporate changes into the RFP as deemed necessary.

A.16 The closing date and time for this RFP is identified on page 1 of this RFP, the Local Time in central Time. All proposal documents are due at the time set forth in this RFP.

A.17 TheFedBizOpps (FBO.gov) bid response system will be used in this procurement. FBO.gov allows Offerors to electronically submit proposals to RFPs posted on FBO - see Paragraph L.3. Note: links to third party cloud file services or a Drop Box are not acceptable for delivery of proposals.

A.18 The DD254 Security Form is provided as Attachment 0012. The Offeror/Teammates/Subcontractor/Managing Partner identified an

Attachment 0015 - SECRET Facility Clearance shall have a SECRET Facility Clearance prior to this RFP closing date. In addition, the

Offeror/Teammates/Subcontractors must have a Facilities Clearance in order for personnel within the company to obtain a SECRET

Clearance.

A.19 The Government will compare the Offeror's proposal to Section L in order to perform a compliance review. Failure to provide proposals in accordance with the instructions/format specified in this RFP shall render the Offerors proposal non-compliant. The proposal will not be further evaluated and will not be further considered for award.

A.20 PLEASE BE SURE TO REVIEW ALL DOCUMENTS AGAIN AS SOME HAVE CHANGED FROM WHEN THE DRAFT RFP WAS ISSUED.

A.21 Organizational conflict of interest means a situation in which-

(1) A Government contract requires a contractor to exercise judgment to assist the Government in a matter (such as in drafting specifications or assessing another contractor's proposal or performance) and the contractor or its affiliates have financial or other interests at stake in the matter, so that a reasonable person might have concern that when performing work under the contract, the contractor may be improperly influenced by its own interests rather than the best interests of the Government; or

(2) A contractor could have an unfair competitive advantage in an acquisition as a result of having performed work on a Government contract, under circumstances such as those described in paragraph (1) of this definition that put the contractor in a position to influence the acquisition.

(3) If the Contractor identifies an OCI, the Contractor shall make a prompt and full disclosure in writing to the Procuring Contracting

Officer (PCO). OCI that arise during performance of the contract, as well as newly discovered conflicts that existed before contract award, shall be disclosed.

A.22 This is a Requirements Contract IAW 52.216-21 for the services specified in the PWS and workload data, and effective for the period of performance identified in Paragraph A.4.

*** END OF NARRATIVE A0001 ***

3 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

4 84

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 SERVICE LINE ITEMS __________________

OFFERORS SHALL SUBMIT PRICES USING ATTACHMENT 0005-

COST/PRICE MATRIX

BILLING INSTRUCTIONS FOR CLIN 0001: Not later than 7 days after the end of CLIN 0001's completed period of performance.

BILLING INSTRUCTIONS FOR CLINs 0002-0003: The

Contractor is authorized to bill monthly for these

CLINs.

(End of narrative B001)

5 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

C-1 52.237-4511 CONTRACTOR MANPOWER REPORTING MAY/2013

(ACC-RI)

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for EAGLE-Material Maintenance Team (MMT) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/, and then click on "Department of the

Army CMRA" or the icon of the DoD organization that is receiving or benefitting from the contracted services.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs

October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2017. Contractors may direct questions to the help desk by clicking on Send an email which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Components CMR website".

(End of Statement of Work)

6 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996

E-2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

ISO 9001-2008

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

7 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.242-15 STOP-WORK ORDER AUG/1989

F-2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-3 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY AUG/2012

8 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION G - CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

2-IN-1

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

Ft. Bragg, NC

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD

Issue By DoDAAC W52P1J

Admin DoDAAC W52P1J

Inspect By DoDAAC TBD

Ship To Code TBD

Ship From Code TBD

Mark For Code TBD

Service Approver (DoDAAC) TBD

Service Acceptor (DoDAAC) TBD

Accept at Other DoDAAC TBD

LPO DoDAAC TBD

DCAA Auditor DoDAAC TBD

Other DoDAAC(s) TBD

9 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email

Notifications" field of WAWF once a document is submitted in the system.

N/A

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

N/A

(2) For technical WAWF help, contact the WAWF helpdesk at 866-

618-5988.

(End of clause)

10 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 EAGLE BUSINESS RULES - STEP THREE TASK ORDER REQUEST

(a) An Offeror must be a qualified BOA holder by the closing date of the Request for Proposal (RFP). The Government is under no obligation to place an order against an EAGLE BOA.

(b) A Task Order becomes a binding contract at the time of the Government's acceptance of a task order proposal and award of a Task

Order per FAR 16.703(c)(1)(iv).

(c) This Task Order is being competed among EAGLE BOA holders who hold a BOA at the time of the closing date of the RFP. No extensions to the RFP will occur for purposes of allowing interested Offerors additional time to become an EAGLE BOA holder.

(d) BOA holders were required to demonstrate the capability to perform the supply functional area in Step Two. That capability may have been achieved with or without Teammates. When submitting a proposal in Step Three, the Offeror shall propose itself and/or approved

Teammates listed in the Offeror's BOA Attachment 0002 - Team Arrangement. The Government will verify that the Offeror's proposal includes approved Teammates by comparing the Offeror's proposal to their BOA Attachment 0002 - Team Arrangement as of the closing date of the RFP.

(e) If BOA holders demonstrated organizational capability in the supply functional area without the reliance of Teammates in Step Two, then the Offeror is not precluded from proposing Subcontractors in the supply functional area for Step 3 Task Order RFPs. BOA holders who demonstrated organizational capability in the supply functional area without the reliance of Teammates in Step Two may propose

Subcontractors for the respective functional area in Step Three Task Order RFPs. For example, if a BOA holder demonstrated organizational capability in Supply without the reliance of Teammates in Step Two, then the Offeror may propose Subcontractor(s) in

Supply in Step Three Task Order RFPs. The Offeror shall propose itself and/or approved Teammates listed in the Offeror's BOA Attachment

0002 - Team Arrangement for Supply.

(f) The contractor shall adhere to the prices proposed and agreed to in this resultant task order issued against their BOA. The contractor is not authorized to begin work on an order issued against the BOA until prices have been established. In the event that the

Contracting Officer requires work to begin prior to establishment of pricing, failure to reach agreement on price may be disputed under the Disputes clause.

(g) Offerors will certify size standards at the Task Order level.

(h) Failure to comply with any term of the Task Order, may result in negative past performance that could negatively impact the BOA holder's ability to be successful in future Task Order competitions.

(i) Responsibility determinations will be made at Step Three. An otherwise successful Offeror may not be eligible for award if it cannot be determined responsible for any of the reasons in FAR 9.104, including capacity.

H.2 CONTRACTOR PERFORMANCE MANAGEMENT REVIEW

(a) All tasks under this contract will be subject to periodic (not less than quarterly) performance management reviews (PMR). The performance reviews will be written in the form of a Contractor Performance Assessment Report (CPAR) in accordance with the DoD

Contractor Performance Assessment Reporting System (CPARS). The PMR can be either positive, outlining best practices or cost savings, or negative in the event the contractor fails to perform as outlined in the PWS, applicable regulations, or PCO direction. PMRs will be provided to the contractor not less than quarterly or as deemed necessary by the COR, Government Program Manager or PCO. The Contractor will receive briefings on the PMR reports and be allowed the opportunity to submit a response. Contract Deficiency Reports (CDRs) and/or

Corrective Action Request (CARs) will be reviewed during the PMR, if the Government deems them material. The contractor will present its independent assessment of performance during the PMR. Contractor's presentation will consist of work accomplished, evaluation of work against applicable program metrics (to include schedule), cost savings, lessons learned, forecasted staffing requirements based on anticipated workload, self-evaluations/inspection results, corrective actions, funding levels/contractor performance report (financial), contractor-employee utilization rates and must address all CARs, CDRs or other notices issued by the PCO.

(b) Contractor Performance Assessment: Currently, the Government uses an escalating system of deficiency reporting: local (on-site) and

PCO issued contract discrepancy report (CDR; DA Form 5479). Local deficiency reporting consists of: verbal notification and corrective action requests (CAR). Verbal notification is primarily used for non-repeating, minor nonconformance/discrepancies of tasks that can be re-performed at no additional cost to the government and with minimal impact to the effort. A CAR will be issued by COR/COTR/QAE when previous verbal notifications failed to result in corrective actions or when more/major non-conformance or significant deficiencies exist/occur. The CAR will be issued to the contractor by the COR and forwarded to the PCO through the government program management office/COR for tracking/action. Un-resolved CARs or significant deficiencies will result in the PCO issuing a formal Contractor

Discrepancy Report (CDR). CDRs are provided to the contractor's corporate office(s) for action with an assigned suspense date. CDRs are a significant indicator of performance and will be used to substantiate the Government's Contractor Performance Assessment Reporting

System (CPARS) input. Performance deficiencies may include any government-identified noncompliance with contract requirements; an activity or action did not take place, or did not take place to the standards of timeliness or quality required. Note, that while the

11 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

contractor will be given the opportunity for re-performance when possible, significant deficiencies will nevertheless be documented. Use of this escalating deficiency reporting procedure does not, in any way, limit the Government's ability to take corrective action up to and including termination.

H.3 PURCHASING AND INVOICING PROCEDURES

(a) The Government and Contractor shall utilize the procedures outlined in the Purchasing and Invoicing Guide (Attachment 0009). This guide details the process that the United States Government (USG) will use to conduct and oversee contractor purchasing and invoicing on this task order. Each step in the process will be described in detail along with the responsibilities of each individual position. It is the intent of the Government that the process will be sufficient for detailed cost accounting and approval without negatively impacting the contractor's ability to provide Supply services for the U.S. Army Materiel Management Team (MMT). If the process is found to negatively impact operations it will be re-evaluated by the USG and updated appropriately to achieve the desired effect.

(b) Final invoice for the Transition-In CLIN shall be submitted no later than 7 days after the end of CLIN 0001's period of performance.

H.4 GOVERNMENT PROPERTY

In the event that Government property accountable to this contract is lost, damaged, destroyed or stolen, the Contractor shall promptly perform an investigation and provide a report to the Contracting Officer or the Contracting Officers representative IAW FAR 52.245-

1(f)(1)(vi) and DFARS 252.245-7002 Reporting Loss of Government Property. The Contracting Officer shall review the Contractor's report and, if the Contracting Officer deems necessary, may perform an additional independent investigation in accordance with FAR 52.245-1

(g). In accordance with FAR 52.245-1 (g) (3) should it be determined by the Government that the Contractors (or subcontractors) property management practices are inadequate or not acceptable for the effective management and control of Government property under this contract, or present an undue risk to the Government, the Contractor shall prepare a corrective action plan and take all necessary corrective actions as specified by the schedule within the corrective action plan. The Contracting Officer may, in writing, revoke the

Governments assumption of risk for loss, theft, damage or destruction, due to a determination under FAR 52.245-1 (g) that the

Contractors property management practices are inadequate, and/or present an undue risk to the Government, and the Contractor failed to take timely corrective action. If the Contracting Officer revokes the Government's assumption of liability and holds the Contractor liable, the Contractor may not charge the Government for the loss, theft, damage or destruction of Government property or any costs associated thereof except as provided in accordance with FAR 52.245-1 (h) (1) (iii). The Contracting Officer may delegate the investigation to an appropriate Government representative of the Contracting Officer's choosing.

H.5 NOT APPLICABLE

H.6 NOT APPLICABLE

H.7 NOT APPLICABLE

H.8 POST - AWARD CONFERENCE: The Contractor agrees to attend any post-award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation subpart 42.5.

*** END OF NARRATIVE H0001 ***

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

H-1 52.242-4591 CONTRACTOR PERFORMANCE INFORMATION DEC/2005

(ACC-RI)

The successful offeror/bidder under this solicitation is advised that after contract award its performance under this contract will be subject to an assessment(s) in accordance with FAR 42.15 and AFARS 5142.1503-90. The Department of Defense

(DoD) Contractors Performance Assessment Reporting System (CPARS) will be used to maintain the performance report(s) generated on this contract. The rating system to be used in this assessment shall be as follows:

Exceptional (Dark Blue) Performance meets contractual requirements and exceeds many to the Governments benefit. The contractual performance of the element or sub element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good (Purple) Performance meets contractual requirements and exceeds some to the Governments benefit. The contractual performance of the element or sub element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory (Green) Performance meets contractual requirements. The contractual performance of the element or sub

12 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal (Yellow) Performance does not meet some contractual requirements. The contractual performance of the element or sub element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractors proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory (Red) Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub element contains serious problem(s) for which the contractors corrective actions appear or were ineffective.

The evaluation procedures to be used in this assessment, which include coordination with the contractor, are detailed in

AFARS 5142.1503-90.

(End of clause)

(HS7015)

13 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION I - CONTRACT CLAUSES

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

I-1 52.202-1 DEFINITIONS NOV/2013

I-2 52.203-3 GRATUITIES APR/1984

I-3 52.203-5 COVENANT AGAINST CONTINGENT FEES MAY/2014

I-4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT SEP/2006

I-5 52.203-7 ANTI-KICKBACK PROCEDURES MAY/2014

I-6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR MAY/2014

IMPROPER ACTIVITY

I-7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY MAY/2014

I-8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS OCT/2010

I-9 52.203-16 PREVENTING PERSONAL CONFLICTS OF INTEREST DEC/2011

I-10 52.204-2 SECURITY REQUIREMENTS AUG/1996

I-11 52.204-2 SECURITY REQUIREMENTS (AUG 1996) -- ALTERNATE I (APR 1984) APR/1984

I-12 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER MAY/2011

I-13 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL JAN/2011

I-14 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS OCT/2015

I-15 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE JUL/2013

I-16 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE JUL/2015

I-17 52.207-3 RIGHT OF FIRST REFUSAL OF EMPLOYMENT MAY/2006

I-18 52.208-9 CONTRACTOR USE OF MANDATORY SOURCES OF SUPPLY OR SERVICES MAY/2014

I-19 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH OCT/2015

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

I-20 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY JUL/2013

MATTERS

I-21 52.210-1 MARKET RESEARCH APR/2011

I-22 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS APR/2008

I-23 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS MAY/2015

I-24 52.215-2 AUDIT AND RECORDS--NEGOTIATIONS OCT/2010

I-25 52.215-2 AUDIT AND RECORDS--NEGOTIATIONS (OCT 2010) -- ALTERNATE III (JUN JUN/1999

1999)

I-26 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT OCT/1997

I-27 52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA AUG/2011

I-28 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA-- AUG/2011

MODIFICATIONS

I-29 52.215-17 WAIVER OF FACILITIES CAPITAL COST OF MONEY OCT/1997

I-30 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS (PRB) JUL/2005

OTHER THAN PENSIONS

I-31 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN OCT/2010

CERTIFIED COST OR PRICING DATA --MODIFICATIONS

I-32 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN OCT/1997

CERTIFIED COST OR PRICING DATA--MODIFICATIONS (OCT 2010) --

ALTERNATE II (OCT 1997)

I-33 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES OCT/2009

I-34 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009) -- ALTERNATE I (OCT OCT/2009

2009)

I-35 52.216-4 ECONOMIC PRICE ADJUSTMENT--LABOR AND MATERIAL JAN/1997

I-36 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE NOV/2011

I-37 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011) -- ALTERNATE II NOV/2011

(NOV 2011)

I-38 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS OCT/2014

I-39 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES FEB/1997

I-40 52.222-3 CONVICT LABOR JUN/2003

I-41 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT EXCEEDING MAY/2014

$15,000

I-42 52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR/2015

I-43 52.222-26 EQUAL OPPORTUNITY APR/2015

I-44 52.222-29 NOTIFICATION OF VISA DENIAL APR/2015

I-45 52.222-37 EMPLOYMENT REPORTS ON VETERANS FEB/2016

I-46 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS DEC/2010

ACT

I-47 52.222-41 SERVICE CONTRACT LABOR STANDARDS MAY/2014

I-48 52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS--PRICE MAY/2014

ADJUSTMENT (MULTIPLE YEAR AND OPTION CONTRACTS)

14 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

I-49 52.222-44 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT LABOR STANDARDS--PRICE MAY/2014

ADJUSTMENT

I-50 52.222-50 COMBATING TRAFFICKING IN PERSONS MAR/2015

I-51 52.222-51 EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT LABOR STANDARDS TO MAY/2014

CONTRACTS FOR MAINTENANCE, CALIBRATION, OR REPAIR OF CERTAIN

EQUIPMENT--REQUIREMENTS

I-52 52.222-53 EXEMPTION FROM APPLICATION OF THE SERVICE CONTRACT LABOR STANDARDS TO MAY/2014

CONTRACTS FOR CERTAIN SERVICES--REQUIREMENTS

I-53 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION OCT/2015

I-54 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND SEP/2013

CONSTRUCTION CONTRACTS

I-55 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION MAY/2011

I-56 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011) -- MAY/2011

ALTERNATE I (MAY 2011)

I-57 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011) -- MAY/2011

ALTERNATE II (MAY 2011)

I-58 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011) -- MAY/2011

ALTERNATE I (MAY 2011) AND ALTERNATE II (MAY 2011)

I-59 52.223-6 DRUG-FREE WORKPLACE MAY/2001

I-60 52.223-10 WASTE REDUCTION PROGRAM MAY/2011

I-61 52.223-12 REFRIGERATION EQUIPMENT AND AIR CONDITIONERS MAY/1995

I-62 52.223-15 ENERGY EFFICIENCY IN ENERGY-CONSUMING PRODUCTS DEC/2007

I-63 52.223-16 ACQUISITION OF EPEAT[supreg]-REGISTERED PERSONAL COMPUTER PRODUCTS OCT/2015

I-64 52.223-16 ACQUISITION OF EPEAT[supreg]-REGISTERED PERSONAL COMPUTER PRODUCTS JUN/2014

(OCT 2015) -- ALTERNATE I (JUN 2014)

I-65 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND MAY/2008

CONSTRUCTION CONTRACTS

I-66 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING AUG/2011

I-67 52.223-19 COMPLIANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS MAY/2011

I-68 52.224-1 PRIVACY ACT NOTIFICATION APR/1984

I-69 52.224-2 PRIVACY ACT APR/1984

I-70 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN/2008

I-71 52.225-14 INCONSISTENCY BETWEEN ENGLISH VERSION AND TRANSLATION OF CONTRACT FEB/2000

I-72 52.226-5 RESTRICTIONS ON SUBCONTRACTING OUTSIDE DISASTER OR EMERGENCY AREA NOV/2007

I-73 52.228-3 WORKERS' COMPENSATION INSURANCE (DEFENSE BASE ACT) JUL/2014

I-74 52.228-5 INSURANCE--WORK ON A GOVERNMENT INSTALLATION JAN/1997

I-75 52.229-3 FEDERAL, STATE, AND LOCAL TAXES FEB/2013

I-76 52.229-6 TAXES--FOREIGN FIXED-PRICE CONTRACTS FEB/2013

I-77 52.229-10 STATE OF NEW MEXICO GROSS RECEIPTS AND COMPENSATING TAX APR/2003

I-78 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS JUN/2010

I-79 52.232-1 PAYMENTS APR/1984

I-80 52.232-8 DISCOUNTS FOR PROMPT PAYMENT FEB/2002

I-81 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS APR/1984

I-82 52.232-11 EXTRAS APR/1984

I-83 52.232-17 INTEREST MAY/2014

I-84 52.232-18 AVAILABILITY OF FUNDS APR/1984

I-85 52.232-23 ASSIGNMENT OF CLAIMS MAY/2014

I-86 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) APR/1984

I-87 52.232-24 PROHIBITION OF ASSIGNMENT OF CLAIMS MAY/2014

I-88 52.232-25 PROMPT PAYMENT JUL/2013

I-89 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT JUL/2013

I-90 52.232-36 PAYMENT BY THIRD PARTY MAY/2014

I-91 52.232-37 MULTIPLE PAYMENT ARRANGEMENTS MAY/1999

I-92 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS DEC/2013

I-93 52.233-1 DISPUTES MAY/2014

I-94 52.233-1 DISPUTES (MAY 2014) -- ALTERNATE I (DEC 1991) DEC/1991

I-95 52.233-3 PROTEST AFTER AWARD AUG/1996

I-96 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT/2004

I-97 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT, AND VEGETATION APR/1984

I-98 52.237-3 CONTINUITY OF SERVICES JAN/1991

I-99 52.237-9 WAIVER OF LIMITATION ON SEVERANCE PAYMENTS TO FOREIGN NATIONALS MAY/2014

I-100 52.239-1 PRIVACY OR SECURITY SAFEGUARDS AUG/1996

I-101 52.242-1 NOTICE OF INTENT TO DISALLOW COSTS APR/1984

15 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

I-102 52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS JAN/1997

I-103 52.242-13 BANKRUPTCY JUL/1995

I-104 52.243-1 CHANGES--FIXED PRICE (AUG 1987) -- ALTERNATE II (APR 1984) APR/1984

I-105 52.244-5 COMPETITION IN SUBCONTRACTING DEC/1996

I-106 52.245-9 USE AND CHARGES APR/2012

I-107 52.247-63 PREFERENCE FOR U.S.-FLAG AIR CARRIERS JUN/2003

I-108 52.248-1 VALUE ENGINEERING OCT/2010

I-109 52.248-1 VALUE ENGINEERING (OCT 2010) -- ALTERNATE I (APR 1984) APR/1984

I-110 52.248-1 VALUE ENGINEERING (OCT 2010) -- ALTERNATE II (FEB 2000) AND FEB/2000

ALTERNATE III (APR 1984)

I-111 52.248-1 VALUE ENGINEERING (OCT 2010) -- ALTERNATE III (APR 1984) APR/1984

I-112 52.248-1 VALUE ENGINEERING (OCT 2010) -- ALTERNATE I (APR 1984) AND ALTERNATE APR/1984

III (APR 1984)

I-113 52.248-1 VALUE ENGINEERING (OCT 2010) -- ALTERNATE II (FEB 2000) FEB/2000

I-114 52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT APR/1984

FORM)

I-115 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) APR/2012

I-116 52.249-4 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (SERVICES) (SHORT FORM) APR/1984

I-117 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) APR/1984

I-118 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984) -- ALTERNATE I APR/1984

(APR 1984)

I-119 52.251-1 GOVERNMENT SUPPLY SOURCES APR/2012

I-120 52.253-1 COMPUTER GENERATED FORMS JAN/1991

I-121 252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE DEC/1991

I-122 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011

I-123 252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-CONTRACT- DEC/2008

RELATED FELONIES

I-124 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS SEP/2013

I-125 252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL DEC/2012

I-126 252.204-7000 DISCLOSURE OF INFORMATION AUG/2013

I-127 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT APR/1992

I-128 252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT FEB/2014

I-129 252.204-7005 ORAL ATTESTATION OF SECURITY RESPONSIBILITIES NOV/2001

I-130 252.204-7006 BILLING INSTRUCTIONS OCT/2005

I-131 252.204-7014 LIMITATIONS ON THE USE OR DISCLOSURE OF INFORMATION BY LITIGATION MAY/2016

SUPPORT CONTRACTORS

I-132 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT MAY/2016

I-133 252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS DEC/1991

I-134 252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE OCT/2015

GOVERNMENT OF A TERRORIST COUNTRY

I-135 252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS DEC/2012

I-136 252.217-7028 OVER AND ABOVE WORK DEC/1991

I-137 252.223-7002 SAFETY PRECAUTIONS FOR AMMUNITION AND EXPLOSIVES MAY/1994

I-138 252.223-7004 DRUG-FREE WORK FORCE SEP/1988

I-139 252.223-7006 PROHIBITION ON STORAGE, TREATMENT, AND DISPOSAL OF TOXIC AND SEP/2014

HAZARDOUS MATERIALS (SEP 2014) -- ALTERNATE I (SEP 2014)

I-140 252.223-7006 PROHIBITION ON STORAGE, TREATMENT, AND DISPOSAL OF TOXIC AND SEP/2014

HAZARDOUS MATERIALS--BASIC

I-141 252.225-7024 REQUIREMENT FOR PRODUCTS OR SERVICES FROM AFGHANISTAN SEP/2013

I-142 252.225-7040 CONTRACTOR PERSONNEL SUPPORTING U.S. ARMED FORCES DEPLOYED OUTSIDE OCT/2015

THE UNITED STATES

I-143 252.225-7048 EXPORT-CONTROLLED ITEMS JUN/2013

I-144 252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC SEP/2004

ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS

I-145 252.231-7000 SUPPLEMENTAL COST PRINCIPLES DEC/1991

I-146 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS JUN/2012

I-147 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006

I-148 252.232-7011 PAYMENTS IN SUPPORT OF EMERGENCIES AND CONTINGENCY OPERATIONS MAY/2013

I-149 252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR PERSONNEL JUN/2013

I-150 252.239-7001 INFORMATION ASSURANCE CONTRACTOR TRAINING AND CERTIFICATION JAN/2008

I-151 252.242-7004 MATERIAL MANAGEMENT AND ACCOUNTING SYSTEM MAY/2011

I-152 252.242-7005 CONTRACTOR BUSINESS SYSTEMS FEB/2012

I-153 252.242-7006 ACCOUNTING SYSTEM ADMINISTRATION FEB/2012

16 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

I-154 252.243-7001 PRICING OF CONTRACT MODIFICATIONS DEC/1991

I-155 252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT DEC/2012

I-156 252.244-7001 CONTRACTOR PURCHASING SYSTEM ADMINISTRATION--BASIC MAY/2014

I-157 252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY APR/2012

I-158 252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY APR/2012

I-159 252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION APR/2012

I-160 252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL MAR/2015

I-161 252.246-7003 NOTIFICATION OF POTENTIAL SAFETY ISSUES JUN/2013

I-162 252.246-7004 SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY OCT/2010

OPERATIONS

I-163 52.216-21 REQUIREMENTS OCT/1995

(a) This is a requirements contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies or services specified in the Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Governments requirements do not result in orders in the quantities described as estimated or maximum in the Schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. Subject to any limitations in the Order Limitations clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the Schedule and called for by orders issued in accordance with the Ordering clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the Schedule that are required to be purchased by the Government activity or activities specified in the Schedule.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the

Contractor within the time specified in the order. The contract shall govern the Contractors and Governments rights and obligations with respect to that order to the same extent as if the order were completed during the contracts effective period; provided, that the

Contractor shall not be required to make any deliveries under this contract after completion of the period of performance.

(End of Clause)

I-164 52.217-8 OPTION TO EXTEND SERVICES NOV/1999

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 7 days of completion of contract.

(End of Clause)

I-165 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT MAR/2000

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the

Government gives the Contractor a preliminary written notice of its intent to extend at least seven (7) days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 Years.

17 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(End of Clause)

I-166 52.222-2 PAYMENT FOR OVERTIME PREMIUMS JUL/1990

(a) The use of overtime is authorized under this contract if the overtime premium does not exceed 0 or the overtime premium is paid for work --

(1) Necessary to cope with emergencies such as those resulting from accidents, natural disasters, breakdowns of production equipment, or occasional production bottlenecks of a sporadic nature;

(2) By indirect-labor employees such as those performing duties in connection with administration, protection, transportation, maintenance, standby plant protection, operation of utilities, or accounting;

(3) To perform tests, industrial processes, laboratory procedures, loading or unloading of transportation conveyances, and operations in flight or afloat that are continuous in nature and cannot reasonably be interrupted or completed otherwise; or

(4) That will result in lower overall costs to the Government.

(b) Any request for estimated overtime premiums that exceeds the amount specified above shall include all estimated overtime for contract completion and shall --

(1) Identify the work…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .