AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0001 2015OCT29

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

PAMELA K. MORITZ

EMAIL: PAMELA.K.MORITZ2.CIV@MAIL.MIL

W52P1J-15-R-0012

2015OCT06

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 6

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: PAMELA K. MORITZ

Buyer Office Symbol/Telephone Number: CCRC-AC/(309)782-0998

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0001 is to incorporate the following changes/clarifications based on questions received in regards to this solicitation:

1. The initial solicitation posted in FBO did not contain the closing date/time on Page 1, Block 9. However, the signed version of the solicitation which contains the closing date/time, 06 November 2015, 3:00pm, was uploaded into FBO on 07 October 2015. Please note, the solicitation closing date is NOT being extended based on this amendment.

2. Section B, CLIN 0005, 155mm Drogue Parachute refers to P/N 9251602, the Folding and Assembly Instructions for the Drogue

Parachute. The associated engineering drawing that contains the manufacturing details for the Drogue Parachutes is P/N 9251604.

This drawing has 2 variations: 9251604-1 and 9251604-2. Drawing 9251604-2, Modified Drogue with reinforcement sleeve, is the variation that should be utilized for this solicitation.

3. Section C, Type I Thread as called out on Drawing 9251604, Note 8 is the only type of thread allowed to be used.

4. Section C, clarifications regarding drawings and specifications are provided in Attachment 010, Clarifications for Drawings and

Specifications, dated 23 October 2015.

5. Section D, Special Packaging Instructions (SPI) have been amended and uploaded to the Federal Business Opportunities (FBO) website. Please note that in the event of conflicting information, the SPI takes precedence over the contract clauses.

6. Section L.2.1 Proposal Volumes, a) Volume I - Technical Approach Factor, page 70, sets forth a maximum page allowance of 70 pages. This allowance is hereby revised to a maximum of 30 pages. This 30 page allowance is for Volume I, Technical Approach

Factor in its entirety, to include Sub-factor 1: Manufacturing Plan and Sub-factor 2: Quality Assurance Plan. The only exceptions to this allowance are described in #7 and #8 below.

7. Section L.3.1 Volume I: Technical Approach Factor, Sub-factor 1: Manufacturing Plan, a), page 71, requires the submission of individual process maps for each parachute type described in the Solicitation. Section L.2.1 a) as described in #6 above has been revised to a maximum page allowance of 30 pages. The process maps are hereby exempt from this maximum page allowance.

8. Section L.3.1 Volume I: Technical Approach Factor, Sub-factor 1: Manufacturing Plan, b), pages 71-72 is hereby revised and is now as follows:

b) Clearly and specifically identify its current Manufacturing Readiness Level (MRL) using the definitions, criteria, and processes defined in the Manufacturing Readiness Level Deskbook, V2.4, August 2015, http://dodmrl.com. The Offeror shall describe the approach used to assess its current MRL and provide supporting rationale. The Offeror shall meet a minimum of MRL

9 for each variant. For any variant which the MRL is assessed below MRL 10 (i.e. MRL 9), the Offeror shall identify a

Manufacturing Maturity Plan (MMP) to achieve MRL 10. Section L.2.1 a) as described in #6 above has been revised to a maximum page allowance of 30 pages. However, should an Offeror have any variant(s) assessed below an MRL 10, an additional 10 pages shall be allowed in order to provide the required MMP stating how an MRL 10 will be achieved. This 10 page allowance shall encompass the MMP for all variants which fall below an MRL 10.

Low Rate Initial Production shall be defined as a minimum of 500 per month for the first month for any single parachute variant; Full Rate Production is defined as a maximum of 10,000 per month for all parachute variants (2,000 each per variant x

5 variants = 10,000 each).

9. Section L, additional guidance for the MRL self-assessment:

The MRL is a self-assessment tool designed to help a contractor determine its level of manufacturing maturity for a specific product. An offerors proposal shall describe its self-assessed maturity level and provide the supporting rationale/evidence used to make this assessment. All relevant current and historical evidence/data available should be used or referenced to strengthen the Offerors claims. The relevancy, accuracy, and significance of this information, as it pertains to the parachute production, will be used to evaluate the Offerors final MRL self-assessment.

SCOPE OF SELF-ASSESSMENT: The MRL Assessment shall be focused on the maturity of the manufacturing process to be used for the manufacturing of all five parachute variants described in the solicitation.

2 6

W52P1J-15-R-0012 0001

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

TOPICS COVERED: The MRL assessment narrative shall cover, at a minimum, the areas listed in paragraph 4.9 of the MRL Deskbook, V2.4, August 2015.

APPLICABLE THREADS/SUB-THREADS: The following MRL Threads and Sub-Threads are applicable:

A - Technology and Industrial Base (A.1, A.2)

D - Materials (D.1, D.2, D.3, D.4)

E - Process Capability & Control (E.1, E.2, E.3)

F - Quality Management (F.1, F.2, F.3)

G - Mfg Workforce (G.1)

H - Facilities (H.1, H.2)

I - Mfg Management (I.1, I.2)

Threads B - Design and C - Cost can be omitted from the Offerors assessment.

MRL USER GUIDE SPREADSHEET: The MRL Questionnaire is only intended to be a self-assessment tool and is not required to be submitted as part of the proposal. The Offeror should focus only on the questions that are applicable to its current MRL level, either MRL 9 or MRL 10, to which they are assessing themselves (reference Column D under MRL Questionnaire tab of the

MRL Users Guide V.12.5.16, http://dodmrl.com).

10. Section M.2.1.3 Technical Approach Sub-factor Evaluation, Sub-factor 1: Manufacturing Plan, b), page 77 is hereby revised and is now as follows:

b) The Offeror's proposal will be evaluated on the maturity of its current manufacturing capability to produce all of the parachute variants contained in this solicitation utilizing the MRL Deskbook, V2.4, August 2015, http://dodmrl.com, the adequacy of supporting documentation, the rationale to justify its assessed maturity level, and the adequacy of the Offeror's approach as described in Section L. For any variant which the MRL is assessed below an MRL 10, the U.S. Government will evaluate the offeror's ability to clearly demonstrate its MMP is executable, and First Article Test Samples will be submitted within the required timeline.

All other terms and conditions remain unchanged.

*** END OF NARRATIVE A0002 ***

3 6

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0010 CLARIFICATIONS FOR DRAWINGS AND SPECIFICATIONS 23-OCT-2015 001

4 6

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

Section L Revisions:

L.2.1 Proposal Volumes: One (1) electronic copy of each Volume shall be submitted in separate parts as set forth below:_______________________

a) Volume I - Technical Approach Factor (maximum page allowance is 30 pages)

Sub-factor 1: Manufacturing Plan

Sub-factor 2: Quality Assurance Plan

b) Volume II - Past Performance Factor (there is no maximum page allowance)

c) Volume III - Price Factor (there is no maximum page allowance)

Each evaluation factor shall be addressed in a separate proposal volume and provided in separate electronic files as specified above; to include separate electronic files for the Technical Approach subfactors. Offerors shall provide electronic copies in Microsoft Word or

Portable Document Format (PDF) format (Microsoft Excel format for Mortar and Artillery Parachutes Price Matrix). All computer files shall be virus checked prior to submission.

The maximum page limit for each volume is specified above. A page is defined as a single sided, 8.5 x 11 sheet, single line spacing, __________________ with no less than 12-point font, and page margins of 1 on top, bottom, and both sides of each page. The only exceptions allowed for font size reduction are for organization charts or other graphic illustrations. In those instances where reduction is allowable, no smaller than 10-point font shall be allowed. The Government will count pages in the sequence of Volume I identified in paragraph 4(a) _________________________________________________________________________________________ above and remove any pages from proposal exceeding the maximum page limit. Any pages over the maximum total 30-page limit for Volume I________________________________________________________________________________________________________________________________________ will not be considered in the evaluation. The cover, title page, tables of contents, acronym lists, divider pages (used to separate_________________________________________ proposal sections) and mandatory forms will not be counted against the maximum page limit. All Proposal Volumes shall contain page numbers; those pages not counted against the maximum page limit need not be numbered.

L.3.1 Volume I: Technical Approach Factor_________________________________________

The Technical Approach Factor consists of two Sub-factors:

Sub-factor 1: Manufacturing Plan: The Offeror shall provide a combined Manufacturing Plan for producing the 60mm/81mm/120mm and 155mm________________________________

Parachute Assemblies. Offerors are responsible for providing a proposal that is complete, detailed, and clearly stated to allow for an accurate evaluation without the need for further clarifications/discussions. The Offeror shall accomplish this by providing detailed narratives that address all requirements of this Solicitation. At a minimum, the Offeror shall:

b) Clearly and specifically identify its current Manufacturing Readiness Level (MRL) using the definitions, criteria, and processes defined in the Manufacturing Readiness Level Deskbook, V2.4, August 2015, http://dodmrl.com. The Offeror shall describe the approach used to assess its current MRL and provide supporting rationale. The Offeror shall meet a minimum of MRL 9 for each variant. For any variant which the MRL is assessed below MRL 10 (i.e. MRL 9), the Offeror shall identify a Manufacturing Maturity Plan (MMP) to achieve MRL 10. Section L.2.1 a) as described in Section L.2.1 above has been revised to a maximum page allowance of 30 pages.

However, should an Offeror have any variant(s) assessed below an MRL 10, an additional 10 pages shall be allowed in order to provide the required MMP stating how an MRL 10 will be achieved. This 10 page allowance shall encompass the MMP for all variants which fall below an MRL 10.

Low Rate Initial Production shall be defined as a minimum of 500 per month for the first month for any single parachute variant;

Full Rate Production is defined as maximum of 10,000 per month for all parachute variants (2,000 each per variant x 5 variants =

10,000 each).

*** END OF NARRATIVE L0002 ***

5 6

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION M - EVALUATION FACTORS FOR AWARD

Section M Revisions:

M.2.1.3 Technical Approach Sub-factor Evaluation: The evaluation approach for each Sub-factor is defined as follows:________________________________________________

Sub-factor 1 - Manufacturing Plan: The Offeror will be evaluated on the adequacy of its proposed manufacturing plan for the production_________________________________ and testing of each parachute type associated with the IDIQ Program in order to meet the requirements of the Solicitation. The U.S.

Government shall evaluate the rationale for the assessing the Offerors current and or proposed Manufacturing Readiness Level (MRL). The

Offeror shall be evaluated on the specific areas as follows:

b) The Offeror's proposal will be evaluated on the maturity of its current manufacturing capability to produce all of the parachute variants contained in this solicitation utilizing the Manufacturing Readiness Level Deskbook, V2.4, August 2015, http://dodmrl.com, the adequacy of supporting documentation, the rationale to justify its assessed maturity level, and the adequacy of the Offeror's approach as described in Section L. For any variant which the MRL is assessed below an MRL 10, the U.S. Government will evaluate the offeror's ability to clearly demonstrate its MMP is executable, and First Article Test Samples will be submitted within the required timeline.

*** END OF NARRATIVE M0002 ***