W51EW7-25-R-A006 NCR MATOC Draft Solicitation.pdf
PDF 5 MB Posted
- Solicitation number
- W51EW7-25-R-A006
- Issued by
-
Department of the Army
About this file
This document is a draft solicitation for a Multiple Award Task Order Contract (MATOC) for Sustainment, Restoration, and Modernization (SRM) work across seven installations in the National Capital Region. The contract will cover construction and minor renovation projects at U.S. Army Garrisons including Aberdeen Proving Ground, Fort Belvoir, Fort Detrick, Fort George G. Meade, Fort Walker, Joint Base Myer-Henderson Hall, and Arlington National Cemetery.
The five-year contract is structured with a base period from October 2026 to October 2031, with two one-year option periods potentially extending it to October 2033. The total program ceiling is not fully disclosed, but each installation will have annual task orders for construction work. The contract will use firm-fixed-price task orders with a guaranteed minimum of $5,000 per contract. Contractors will be required to provide labor, equipment, materials, and supervision for various engineering disciplines including electrical, environmental, mechanical, and structural work, with individual project values up to $7,500,000. Contractors must have key personnel including a Project Manager, Quality Control Manager, Project Superintendent, and Site Safety and Health Officer, with specific qualification requirements for each role.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - NCR MATOC Rate Sheet.pdf | ||
| Attachment 3 - NCR MATOC Contractor Bid Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Created On:
07 Aug 2025, 14:00 PM Central Daylight Time
DRAFT
Section A - Solicitation/Contract Form
National Capital Region Multiple Award Task Order Contract
Replace Transite Water Pipe Junkin Road.
Project to abandon existing transite pipe and parallel replacement of all distribution mains and building connections along Junkin Rd. Pipe replacement is approximately 1,300LF of 8#PVC.
TABLE OF CONTENTS
PART I: THE SCHEDULE
- SECTION A - Solicitation/Contract Form
- SECTION B - Supplies or Services and Prices/Costs
- SECTION C - Descriptions/Specifications/Statement of Work
- SECTION D - Packaging and Marking
- SECTION E - Inspection and Acceptance
- SECTION F - Description and Performance
- SECTION G - Contract Administration Data
- SECTION H - Special Contract Requirements
PART II: CONTRACT CLAUSES
SECTION I - Contract Clauses
PART III: LIST OF EXHIBITS, ATTACHMENTS, AND APPENDICES
SECTION J - List of Exhibits, Attachments, and Appendices
W51EW725RA006
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
EXECUTIVE SUMMARY
1. The total program ceiling for the Sustainment, Restoration and Modernization (SRM) contracts is $XX.
2. The Government is under no obligation to issue any task orders against contracts resulting from this solicitation in excess of the guaranteed minimum. In addition, task orders SHALL NOT be issued for work that exceeds statutory limitation for new construction. The guaranteed minimum for this requirement is $5,000.00 per contract. A task order will be separately issued to each awardee under this requirement to satisfy this guaranteed minimum. The program ceiling for all combined contracts and task orders shall not exceed $XX.
3. The Contract Line Item Number (CLIN) structure shall be established individually at the Task Order (TO) level. The Pricing of TOs shall be pursuant to the instructions and limitations provided at Section H, Special Contract Requirements, the MATOC IDIQ Cap Rates, and instructions at the individual task order level. Offerors binding MATOC IDIQ CAP RATES (submitted in accordance with solicitation, section L) shall be carried over into the following table:
Direct Hourly Labor Rate w/ Fringe Benefits
Project Manager $
Project Superintendent $
Quality Control Manager $
Percentage Applied
G&A (Applied to total cost less bonds) 7%
Profit (Applied to total cost to include G&A less bonds) 6%
Note that bonds shall be reimbursed at cost, no profit, G&A or overhead allowed once proof of payment is furnished.
Item Supplies/Service Estimated Quantity
Unit Unit Price Amount
USAG ABER Construction to consist of Sustainment, Restoration, and
W51EW725RA006
Modernization (SRM) work on real property.
0001AA
Base Year 1 POP: 10/13/26 to 10/12/27
USAG ABER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Aberdeen Proving Grounds (APG), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG BELV Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
Base Year 1 POP: 10/13/26 to 10/12/27
USAG BELV Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Belvoir (FBVA), VA. Work shall be performed in accordance with the terms and
W51EW725RA006
0002AA
conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG DET1 New Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0003AA
Base Year 1 POP: 10/13/26 to 10/12/27
USAG DET1 Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Detrick (DET1), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
1 Lot
W51EW725RA006
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
USAG Fort George G. Meade (USAG-MEAD) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0004AA
Base Year 1 POP: 10/13/26 to 10/12/27
USAG MEAD Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort George G.
Meade (USAG-MEAD), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Joint Base Myer-Henderson Hall (USAG-MYER) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
Base Year 1 POP: 10/13/26 to 10/12/27
USAG MYER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task
W51EW725RA006
0005AA
Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Joint Base Myer-Henderson Hall (USAG-MYER), VA.
Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Walker (USAG-WALK) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0006AA
Base Year 1 POP: 10/13/26 to 10/12/27
USAG WALK Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Walker (USAG-WALK), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for
1 Lot
W51EW725RA006
performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
Arlington National Cemetery (ANC) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0007AA
Base Year 1 POP: 10/13/26 to 10/12/27
ANC Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Arlington National Cemetery (ANC), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Aberdeen Proving Ground (USAG-APG) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
W51EW725RA006
0008AA
Base Year 2 POP: 10/13/27 to 10/12/28
USAG APG Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Aberdeen Proving Ground (USAG-APG), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Belvoir (USAG-FBVA) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0009AA
Base Year 2 POP: 10/13/27 to 10/12/28
USAG FBVA Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Belvoir (USAG-FBVA), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and
W51EW725RA006
Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Detrick (USAG-DET1) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0010AA
Base Year 2 POP: 10/13/27 to 10/12/28
USAG DET1 Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Detrick (USAG-DET1), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
W51EW725RA006
USAG Fort George G. Meade (USAG-MEAD) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0011AA
Base Year 2 POP: 10/13/27 to 10/12/28
USAG MEAD Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort George G.
Meade (USAG-MEAD), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Myer-Henderson Hall (USAG-MYER) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
Base Year 2 POP: 10/13/27 to 10/12/28
USAG MYER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and
W51EW725RA006
0012AA
supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Myer-Henderson Hall (USAG-MYER), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Walker (USAG-WALK) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0013AA
Base Year 2 POP: 10/13/27 to 10/12/28
USAG WALK Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Walker (USAG-WALK), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the
1 Lot
W51EW725RA006
Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
Arlington National Cemetery (ANC) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0014AA
Base Year 2 POP: 10/13/27 to 10/12/28
USAG ANC Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Arlington National Cemetery (ANC), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Aberdeen Proving Ground (USAG-APG) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
Base Year 3 POP: 10/13/28 to
W51EW725RA006
0015AA
10/12/29
USAG APG Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Aberdeen Proving Ground (USAG-APG), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Belvoir (USAG-FBVA) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0016AA
Base Year 3 POP: 10/13/28 to 10/12/29
USAG FBVA Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Belvoir (USAG-FBVA), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
1 Lot
W51EW725RA006
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
USAG Fort Detrick (USAG-DET1) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0017AA
Base Year 3 POP: 10/13/28 to 10/12/29
USAG DET1 Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Detrick (USAG-DET1), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort George G. Meade
W51EW725RA006
0018 (USAG-MEAD) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0018AA
Base Year 3 POP: 10/13/28 to 10/12/29
USAG MEAD Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort George G.
Meade (USAG-MEAD), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Myer-Henderson Hall (USAG-MYER) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
Base Year 3 POP: 10/13/28 to 10/12/29
USAG MYER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and
W51EW725RA006
0019AA
modernization at Fort Myer-Henderson Hall (USAG-MYER), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Walker (USAG-WALK) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0020AA
Base Year 3 POP: 10/13/28 to 10/12/29
USAG WALK Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Walker (USAG-WALK), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, 1 Lot
W51EW725RA006
submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
Arlington National Cemetery (ANC) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0021AA
Base Year 3 POP: 10/13/28 to 10/12/29
USAG ANC Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Arlington National Cemetery (ANC), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Aberdeen Proving Ground (USAG-APG) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
Base Year 4 POP: 10/13/29 to 10/12/30
USAG APG Construction to
W51EW725RA006
0022AA
consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Aberdeen Proving Ground (USAG-APG), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Belvoir (USAG-FBVA) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0023AA
Base Year 4 POP: 10/13/29 to 10/12/30
USAG FBVA Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Belvoir (USAG-FBVA), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course
1 Lot
W51EW725RA006
of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
USAG Fort Detrick (USAG-DET1) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0024AA
Base Year 4 POP: 10/13/29 to 10/12/30
USAG DET1 Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Detrick (USAG-DET1), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort George G. Meade (USAG-MEAD) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real
W51EW725RA006
0025AA
Base Year 4 POP: 10/13/29 to 10/12/30
USAG MEAD Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort George G.
Meade (USAG-MEAD), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Myer-Henderson Hall (USAG-MYER) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
Base Year 4 POP: 10/13/29 to 10/12/30
USAG MYER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Myer-Henderson Hall (USAG-MYER), VA. Work shall be performed in accordance with the
W51EW725RA006
0026AA
terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Walker (USAG-WALK) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0027AA
Base Year 4 POP: 10/13/29 to 10/12/30
USAG WALK Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Walker (USAG-WALK), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
1 Lot
W51EW725RA006
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
Arlington National Cemetery (ANC) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0028AA
Base Year 4 POP: 10/13/29 to 10/12/30
USAG ANC Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Arlington National Cemetery (ANC), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Aberdeen Proving Ground (USAG-APG) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
Base Year 5 POP: 10/13/30 to 10/12/31
USAG APG Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall
W51EW725RA006
0029AA
provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Aberdeen Proving Ground (USAG-APG), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Belvoir (USAG-FBVA) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0030AA
Base Year 5 POP: 10/13/30 to 10/12/31
USAG FBVA Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Belvoir (USAG-FBVA), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for
1 Lot
W51EW725RA006
performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
USAG Fort Detrick (USAG-DET1) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0031AA
Base Year 5 POP: 10/13/30 to 10/12/31
USAG DET1 Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Detrick (USAG-DET1), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort George G. Meade (USAG-MEAD) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
W51EW725RA006
0032AA
Base Year 5 POP: 10/13/30 to 10/12/31
USAG MEAD Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort George G.
Meade (USAG-MEAD), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Myer-Henderson Hall (USAG-MYER) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0033AA
Base Year 5 POP: 10/13/30 to 10/12/31
USAG MYER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Myer-Henderson Hall (USAG-MYER), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and
W51EW725RA006
Specifications and Drawings as required in any resulting individual Task Order issued.
Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.
Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.
Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price
1 Lot
USAG Fort Walker (USAG-WALK) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
0034AA
Base Year 5 POP: 10/13/30 to 10/12/31
USAG WALK Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .