W51EW7-25-R-A006 NCR MATOC Draft Solicitation.pdf

PDF 5 MB Posted

Attached to
NATIONAL CAPITAL REGION MULTIPLE AWARD TASK ORDER CONTRACT
Solicitation number
W51EW7-25-R-A006
Issued by

About this file

This document is a draft solicitation for a Multiple Award Task Order Contract (MATOC) for Sustainment, Restoration, and Modernization (SRM) work across seven installations in the National Capital Region. The contract will cover construction and minor renovation projects at U.S. Army Garrisons including Aberdeen Proving Ground, Fort Belvoir, Fort Detrick, Fort George G. Meade, Fort Walker, Joint Base Myer-Henderson Hall, and Arlington National Cemetery.

The five-year contract is structured with a base period from October 2026 to October 2031, with two one-year option periods potentially extending it to October 2033. The total program ceiling is not fully disclosed, but each installation will have annual task orders for construction work. The contract will use firm-fixed-price task orders with a guaranteed minimum of $5,000 per contract. Contractors will be required to provide labor, equipment, materials, and supervision for various engineering disciplines including electrical, environmental, mechanical, and structural work, with individual project values up to $7,500,000. Contractors must have key personnel including a Project Manager, Quality Control Manager, Project Superintendent, and Site Safety and Health Officer, with specific qualification requirements for each role.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

Created On:

07 Aug 2025, 14:00 PM Central Daylight Time

DRAFT

Section A - Solicitation/Contract Form

National Capital Region Multiple Award Task Order Contract

Replace Transite Water Pipe Junkin Road.

Project to abandon existing transite pipe and parallel replacement of all distribution mains and building connections along Junkin Rd. Pipe replacement is approximately 1,300LF of 8#PVC.

TABLE OF CONTENTS

PART I: THE SCHEDULE

- SECTION A - Solicitation/Contract Form

- SECTION B - Supplies or Services and Prices/Costs

- SECTION C - Descriptions/Specifications/Statement of Work

- SECTION D - Packaging and Marking

- SECTION E - Inspection and Acceptance

- SECTION F - Description and Performance

- SECTION G - Contract Administration Data

- SECTION H - Special Contract Requirements

PART II: CONTRACT CLAUSES

SECTION I - Contract Clauses

PART III: LIST OF EXHIBITS, ATTACHMENTS, AND APPENDICES

SECTION J - List of Exhibits, Attachments, and Appendices

W51EW725RA006

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

EXECUTIVE SUMMARY

1. The total program ceiling for the Sustainment, Restoration and Modernization (SRM) contracts is $XX.

2. The Government is under no obligation to issue any task orders against contracts resulting from this solicitation in excess of the guaranteed minimum. In addition, task orders SHALL NOT be issued for work that exceeds statutory limitation for new construction. The guaranteed minimum for this requirement is $5,000.00 per contract. A task order will be separately issued to each awardee under this requirement to satisfy this guaranteed minimum. The program ceiling for all combined contracts and task orders shall not exceed $XX.

3. The Contract Line Item Number (CLIN) structure shall be established individually at the Task Order (TO) level. The Pricing of TOs shall be pursuant to the instructions and limitations provided at Section H, Special Contract Requirements, the MATOC IDIQ Cap Rates, and instructions at the individual task order level. Offerors binding MATOC IDIQ CAP RATES (submitted in accordance with solicitation, section L) shall be carried over into the following table:

Direct Hourly Labor Rate w/ Fringe Benefits

Project Manager $

Project Superintendent $

Quality Control Manager $

Percentage Applied

G&A (Applied to total cost less bonds) 7%

Profit (Applied to total cost to include G&A less bonds) 6%

Note that bonds shall be reimbursed at cost, no profit, G&A or overhead allowed once proof of payment is furnished.

Item Supplies/Service Estimated Quantity

Unit Unit Price Amount

USAG ABER Construction to consist of Sustainment, Restoration, and

W51EW725RA006

Modernization (SRM) work on real property.

0001AA

Base Year 1 POP: 10/13/26 to 10/12/27

USAG ABER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Aberdeen Proving Grounds (APG), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG BELV Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

Base Year 1 POP: 10/13/26 to 10/12/27

USAG BELV Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Belvoir (FBVA), VA. Work shall be performed in accordance with the terms and

W51EW725RA006

0002AA

conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG DET1 New Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0003AA

Base Year 1 POP: 10/13/26 to 10/12/27

USAG DET1 Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Detrick (DET1), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

1 Lot

W51EW725RA006

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

USAG Fort George G. Meade (USAG-MEAD) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0004AA

Base Year 1 POP: 10/13/26 to 10/12/27

USAG MEAD Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort George G.

Meade (USAG-MEAD), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Joint Base Myer-Henderson Hall (USAG-MYER) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

Base Year 1 POP: 10/13/26 to 10/12/27

USAG MYER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task

W51EW725RA006

0005AA

Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Joint Base Myer-Henderson Hall (USAG-MYER), VA.

Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Walker (USAG-WALK) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0006AA

Base Year 1 POP: 10/13/26 to 10/12/27

USAG WALK Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Walker (USAG-WALK), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for

1 Lot

W51EW725RA006

performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

Arlington National Cemetery (ANC) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0007AA

Base Year 1 POP: 10/13/26 to 10/12/27

ANC Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Arlington National Cemetery (ANC), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Aberdeen Proving Ground (USAG-APG) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

W51EW725RA006

0008AA

Base Year 2 POP: 10/13/27 to 10/12/28

USAG APG Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Aberdeen Proving Ground (USAG-APG), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Belvoir (USAG-FBVA) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0009AA

Base Year 2 POP: 10/13/27 to 10/12/28

USAG FBVA Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Belvoir (USAG-FBVA), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and

W51EW725RA006

Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Detrick (USAG-DET1) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0010AA

Base Year 2 POP: 10/13/27 to 10/12/28

USAG DET1 Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Detrick (USAG-DET1), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

W51EW725RA006

USAG Fort George G. Meade (USAG-MEAD) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0011AA

Base Year 2 POP: 10/13/27 to 10/12/28

USAG MEAD Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort George G.

Meade (USAG-MEAD), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Myer-Henderson Hall (USAG-MYER) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

Base Year 2 POP: 10/13/27 to 10/12/28

USAG MYER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and

W51EW725RA006

0012AA

supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Myer-Henderson Hall (USAG-MYER), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Walker (USAG-WALK) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0013AA

Base Year 2 POP: 10/13/27 to 10/12/28

USAG WALK Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Walker (USAG-WALK), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the

1 Lot

W51EW725RA006

Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

Arlington National Cemetery (ANC) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0014AA

Base Year 2 POP: 10/13/27 to 10/12/28

USAG ANC Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Arlington National Cemetery (ANC), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Aberdeen Proving Ground (USAG-APG) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

Base Year 3 POP: 10/13/28 to

W51EW725RA006

0015AA

10/12/29

USAG APG Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Aberdeen Proving Ground (USAG-APG), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Belvoir (USAG-FBVA) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0016AA

Base Year 3 POP: 10/13/28 to 10/12/29

USAG FBVA Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Belvoir (USAG-FBVA), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

1 Lot

W51EW725RA006

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

USAG Fort Detrick (USAG-DET1) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0017AA

Base Year 3 POP: 10/13/28 to 10/12/29

USAG DET1 Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Detrick (USAG-DET1), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort George G. Meade

W51EW725RA006

0018 (USAG-MEAD) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0018AA

Base Year 3 POP: 10/13/28 to 10/12/29

USAG MEAD Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort George G.

Meade (USAG-MEAD), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Myer-Henderson Hall (USAG-MYER) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

Base Year 3 POP: 10/13/28 to 10/12/29

USAG MYER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and

W51EW725RA006

0019AA

modernization at Fort Myer-Henderson Hall (USAG-MYER), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Walker (USAG-WALK) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0020AA

Base Year 3 POP: 10/13/28 to 10/12/29

USAG WALK Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Walker (USAG-WALK), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, 1 Lot

W51EW725RA006

submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

Arlington National Cemetery (ANC) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0021AA

Base Year 3 POP: 10/13/28 to 10/12/29

USAG ANC Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Arlington National Cemetery (ANC), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Aberdeen Proving Ground (USAG-APG) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

Base Year 4 POP: 10/13/29 to 10/12/30

USAG APG Construction to

W51EW725RA006

0022AA

consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Aberdeen Proving Ground (USAG-APG), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Belvoir (USAG-FBVA) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0023AA

Base Year 4 POP: 10/13/29 to 10/12/30

USAG FBVA Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Belvoir (USAG-FBVA), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course

1 Lot

W51EW725RA006

of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

USAG Fort Detrick (USAG-DET1) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0024AA

Base Year 4 POP: 10/13/29 to 10/12/30

USAG DET1 Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Detrick (USAG-DET1), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort George G. Meade (USAG-MEAD) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real

W51EW725RA006

0025AA

Base Year 4 POP: 10/13/29 to 10/12/30

USAG MEAD Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort George G.

Meade (USAG-MEAD), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Myer-Henderson Hall (USAG-MYER) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

Base Year 4 POP: 10/13/29 to 10/12/30

USAG MYER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Myer-Henderson Hall (USAG-MYER), VA. Work shall be performed in accordance with the

W51EW725RA006

0026AA

terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Walker (USAG-WALK) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0027AA

Base Year 4 POP: 10/13/29 to 10/12/30

USAG WALK Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Walker (USAG-WALK), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

1 Lot

W51EW725RA006

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

Arlington National Cemetery (ANC) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0028AA

Base Year 4 POP: 10/13/29 to 10/12/30

USAG ANC Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Arlington National Cemetery (ANC), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Aberdeen Proving Ground (USAG-APG) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

Base Year 5 POP: 10/13/30 to 10/12/31

USAG APG Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall

W51EW725RA006

0029AA

provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Aberdeen Proving Ground (USAG-APG), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Belvoir (USAG-FBVA) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0030AA

Base Year 5 POP: 10/13/30 to 10/12/31

USAG FBVA Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Belvoir (USAG-FBVA), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for

1 Lot

W51EW725RA006

performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

USAG Fort Detrick (USAG-DET1) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0031AA

Base Year 5 POP: 10/13/30 to 10/12/31

USAG DET1 Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Detrick (USAG-DET1), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort George G. Meade (USAG-MEAD) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

W51EW725RA006

0032AA

Base Year 5 POP: 10/13/30 to 10/12/31

USAG MEAD Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort George G.

Meade (USAG-MEAD), MD. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Myer-Henderson Hall (USAG-MYER) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0033AA

Base Year 5 POP: 10/13/30 to 10/12/31

USAG MYER Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property. The contractor shall provide (as specified in each Task Order under the resulting contract) all labor, equipment, materials and supervision necessary to perform a broad range of construction, sustainment, restoration, and modernization at Fort Myer-Henderson Hall (USAG-MYER), VA. Work shall be performed in accordance with the terms and conditions of the resulting contract, Statement of Work, Scope of Work, and

W51EW725RA006

Specifications and Drawings as required in any resulting individual Task Order issued.

Contractor is also required, throughout the course of this contract, to provide data on Contractor labor hours (including subcontractor labor hours) for performance of this contract IAW the SOW. The cost, if any, for providing this data shall be included in the Request for Task Order proposals.

Enter price for each CLIN here and submit with your proposal. Also, submit the Rate Sheet for the contract and, submit the Contractor Bid Sheet for the Seed Project.

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Lot

USAG Fort Walker (USAG-WALK) Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

0034AA

Base Year 5 POP: 10/13/30 to 10/12/31

USAG WALK Construction to consist of Sustainment, Restoration, and Modernization (SRM) work on real property.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .