Attachment 2 - NCR MATOC Rate Sheet.pdf
PDF 132 KB Posted
- Solicitation number
- W51EW7-25-R-A006
- Issued by
-
Department of the Army
About this file
This document is an Attachment 02 Rate Sheet for the National Capital Region (NCR) Multiple Award Task Order Contract (MATOC), RFP # W51EW7-25-R-A006. The rate sheet outlines Not-To-Exceed (NTE) hourly rates for professional labor categories over a five-year base ordering period and two option years, specifically for Project Manager, Project Superintendent, and Quality Control Manager roles. The rates are fully burdened with fringe benefits and apply to professional labor categories not subject to the Construction Wage Rate Requirements Statute.
The rate sheet includes two tables: one for NTE hourly rates across different contract years and another for NTE applied percentages for General & Administrative (G&A) and Profit categories. Notably, both G&A and Profit are set at 0.0% across all years, and bonds are to be calculated as a pure cost with no additional profit, G&A, or overhead allowed. The document emphasizes that these rates will be incorporated into the base contract, and contractors may quote lower rates but cannot exceed the stated NTE rates when preparing Task Order price proposals. Task orders may include all, some, or none of these rate categories based on individual requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W51EW7-25-R-A006 NCR MATOC Draft Solicitation.pdf | ||
| Attachment 3 - NCR MATOC Contractor Bid Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Category N T
E H ou rl y R at es
B as ic
Y ea r
N T
E H ou rl y R at es
B as ic Y ea r
N T
E H ou rl y R ic
Y ea r
N T
E H ou rl y R ic
Y ea r
N T
E H ou rl y R ic
Y ea r
N T
E H ou rl y R
O pt io n Y ea r
N T
E H ou rl y R io n Y ea r
Project Manager
Project Superintendant
Quality Control Manager
Category N T
E A pp lie d Pe rc en ta ge
B as ic Y ea r
N T
E A pp lie d Pe rc en ta ge
B as ic Y ea r
N T
E A pp lie d Pe rc en ta ge ic
Y ea r
N T
E A pp lie d Pe rc en ic
Y ea r
N T
E A pp lie d Pe rc en ic
Y ea r
N T
E A pp lie d Pe rc en io n Y ea r
N T
E A pp lie d Pe rc en ta ge
O pt io n
Y ea r
G&A (Applied to total cost less bonds) Profit (Applied to total cost to include G&A less bonds)
Five (5) Year Base Ordering Period
Five (5) Year Base Ordering Period
Bonds shall only be cost, no profit, G&A or overhead allowed on bonding
NOTE: These rates will be incorporated into the base contract and all rates in this attachment shall be Not To Exceed (NTE) rates the offerors will use when preparing Task Order price proposals. Contractors may quote less than the stated rates but are not to exceed what is in this attachment for each Task Order. Based on individual task Order Requirements, task Orders may include all, some or none of these rate categories.
Attachment 02 - Rate Sheet National Capital Region (NCR) Multiple Award Task Order Contract (MATOC)
RFP # W51EW7-25-R-A006
Professional Labor Category Rate Requirements- Not Subject to the Construction Wage Rate Requirements Statute
All rates are NTE per year and are hourly rates and are fully burdened w/Fringe Benefits. *Fully burdened hourly labor rates for the six (6) month extension of services option ordering period will be the same as the fully burdened hourly rate for the option year two (2) ordering period
Sheet1
| Text1: |
| Text2: |
| Text3: |
| Text10: |
| Text12: |
| Text13: |
| Text14: |
| Text9: |
| Text8: |
| Text7: |
| Text6: |
| Text5: |
| Text4: |
| Text15: |
| Text16: |
| Text21: |
| Text20: |
| Text19: |
| Text18: |
| Text17: |
| Text11: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Text35: |
File details come from the government source that posted it. Updated .