This document is an Amendment (Amendment 0005) to a federal solicitation for Wastewater Sampling Analysis at Tobyhanna Army Depot. The amendment provides clarifications to the original solicitation, with key details including the contract's base period plus four one-year options, starting immediately after the current contract expires on 4 December 2025. TYAD (Tobyhanna Army Depot) will set up auto samplers, and the laboratory will be responsible for pouring composite samples into bottles and taking grab samples. The amendment addresses specific questions about sample collection, testing timelines, and reporting requirements, notably that weekly influent/effluent and reclaimed sample results must be returned within 15 calendar days, with specific parameters to be reported including pH, conductance, BOD, TSS, and various nitrogen measurements. A permit with specific detection limits will be provided upon contract award.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W25G1V5085004B

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide clarfications to the requested information.

The proposal due date remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jun-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W51AA125Q0055

X 9B. DATED (SEE ITEM 11)

05-Jun-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jun-2025

CODE

ACC-APG TOBYHANNA DIVISION (W51AA1)

11 HAP ARNOLD BLVD

TOBYHANNA PA 18466

W51AA1 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W51AA125Q0055

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

SUMMARY OF CHANGES

1) Is this project currently being done by another laboratory?

a. The project is currently being done by another laboratory.

2) What is the expected start date of the project?

a. The current contract expires 4 Dec 25 so the new one will start immediately after that.

3) It appears that TYAD has the means to set up the compositors and the lab is just pouring off samples from them.

Can this be confirmed?

TYAD will setup all auto samplers, the lab will just need to pour the composite samples into the sample bottles and take the grab samples.

3) What is the length of this project (12 months, 6 months, etc)?

a. This is base plus 4 one year options.

5) Since it is already midyear, has the Annual TTO analysis already been completed for this year (typically May/June)?

This contract will not start until Dec 25, the annual TTO analysis has already been completed for this year.

6) Since it is already midyear, had the 1st half of the year Stormwater already been completed (January to June)?

The 1st half stormwater sampling is completed, pending weather the 2nd half should be completed by October/November.

7) There is a Note that sample results must be received 15 days after they are collected. Is this 15 working days or calendar days?

15 Calendar days

8) Some of the tests take more than 3-4 weeks to process, what are the expectations regarding this? 15 days is not sufficient and will not be able to provide results for future use.

We will just need the weekly influent/effluent and reclaimed samples back within 15 calendar days due to reporting purposes.

9) Organic material testing will take longer than the prescribed 15-day delivery period, what are the depots expectations? Will an extended timeframe be allowed by the depot? If extended timeframe is not allowed, the tests will not be completed and results cannot be provided.

We will just need the weekly influent/effluent and reclaimed sample results back within 15 days (pH, Specific Conductance, BOD, TSS, TDS, Alkalinity, Ammonia-Nitrogen, Total Phosphorus, TKN, Nitrate as N, Nitrite as N, Total Nitrogen, and Fecal Coliform)

10) 1) Are there any specific detection limits needed for any of the tests?

A copy of the permit will be provided to the laboratory when the contract is awarded, that will include all detection limits.

(End of Summary of Changes)