Attachment 2 - Task and Frequency.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- W51AA124Q0036
- Issued by
-
Department of the Army
About this file
This document outlines the tasks and frequencies required for a facility environmental management and monitoring system performance audits, calibrations, and maintenance contract. Key requirements include conducting annual, biannual, quarterly, and emergency maintenance and calibration tasks for various environmental monitoring sensors, equipment, and systems located throughout the facility. Sensors and assets supported include the main weather tower, additional meteorological sensors, effluent water quality sensors at the sewage treatment plant, remote communications services, a lightning detection system, drinking water monitoring systems, hazardous material storage sensors, industrial groundwater monitoring systems, and associated software, computers and communications equipment. The solicitation number is W51AA124Q0036 and is seeking a firm fixed price proposal for these services at Tobyhanna Army Depot. A site visit will be held on 13 February 2024 at 1 PM EST. The contracting agency is the Department of the Army.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24Q0036 Amendment 2.pdf | ||
| Attachment 4 - Question and Answers.xlsx | XLSX spreadsheet | |
| 24Q0036 Amendment.pdf | ||
| Attachment 3 - Pricing Table (1).xlsx | XLSX spreadsheet | |
| 24Q0036 SOLICITATIONpdf.pdf | ||
| Attachment 1 - Performance Work Statement (PWS).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task and Frequency
| Facility Environmental Management and Monitoring System Performance Audits, Calibrations and Maintenance | |
| Attachment 2 - Task and Frequency | - Task required at this interval. |
| Task | Annual | Biannual (Six Months) | Quarterly | Unscheduled/Emergency/As Needed | |
| PWS Reference | |||||
| Main Weather Tower | PWS Para 3(a), EXCEPT PWS Para 3.12 | ||||
| Main Weather Tower | PWS Para 3(a).12 | ||||
| Meteorological sensors located at Building 11, Building 56 and Building 1027 | PWS Para 3(b) | ||||
| Effluent water quality sensors at the Sewage Treatment Plant | PWS Para 3(c) | ||||
| Remote communications services | PWS Para 3(d) | ||||
| Emergency repairs of critical sensor failures | PWS Para 3(e) | ||||
| Maintenance of lightning detection system | PWS Para 3(f) | ||||
| Calibration of influent sensors at the Sewage Treatment Plant | PWS Para 3(g) | ||||
| Calibration of conductivity probe | PWS Para 3(h) | ||||
| Maintenance of thermocouples | PWS Para 3(i) | ||||
| Maintenance of sensors associated with the drinking water monitoring system | PWS Para 3(j) | ||||
| Maintenance of computers, software and associated communications equipment | PWS Para 3(k) | ||||
| Maintenance of sensors associated with the hazardous material storage building | PWS Para 3(l) | ||||
| Maintenance of sensors and communications equipment associated with the three drinking water quality monitoring stations (Buildings 54, 11 and 24) and water valve monitoring system (Building 54) | PWS Para 3(m) | ||||
| Calibration of conductivity probe | PWS Para 3(n) | ||||
| Maintenance of sensors associated with the industrial area groundwater monitoring system | PWS Para 3(o) |
File details come from the government source that posted it. Updated .