Contractor Questions (26-11-16).xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Concrete Pads B220 & B299
- Solicitation number
- W519TC27RA012
About this file
This file is a Contractor Questions document in spreadsheet format containing inquiries and responses related to the Concrete Pads B220 & B299 solicitation (W519TC27RA012). The document appears to be a Q&A template used to address contractor questions submitted during the solicitation period for the concrete pad construction project at Rock Island Arsenal's Joint Manufacturing and Technology Center. The file serves as a reference document for potential bidders seeking clarification on solicitation requirements, evaluation criteria, technical specifications, or other contract-related matters prior to proposal submission.
As a Q&A template or compilation, this file does not independently establish contract requirements, pricing terms, or award criteria. Instead, it functions as a supplementary document to the main solicitation, providing clarifications that may impact how contractors interpret the scope of work for constructing concrete pads in buildings 220 and 299 under the Firm Fixed Price contract vehicle. Contractors should review this document in conjunction with the full solicitation posted on SAM.gov to ensure comprehensive understanding of all technical and administrative requirements before submitting their proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 W519TC27RA012 - Concrete Work JMTC
| Contractor Questions | Government Answer | |
| 1 | Ultrasonic tank – what rebar size/spacing is needed for the tank walls? | Single layer #5 on 40" centers. The drawings are updated to reflect this information. |
| 2 | Ultrasonic tank – will the excavated materials in this area need to be disposed of in a permitted landfill? | No special requirements caused by the location. Dispose of thru standard soil/rock/concrete methods. |
| 3 | Ultrasonic tank – since the excavation is deeper than 5’, shoring will be required. Presumably, we will need to replace the extra floor slab that is removed to accommodate the shoring, correct? Please provide a detail for how the new floor slab should be tied to the existing floor slab. | Yes. Flat work will be needed to complete the floor to the edge of the new pit. It will need to match the existing floor which is approximately 8" thick. It would need to be doweled to the existing using the same criteria as the tunnel repair. #5 epoxy coated rebar at 12" centers with a minimum of 3" coverage top and bottom and be drilled a minimum of 6" into the vertical face. |
The drawings are updated to reflect this information.
| Ultrasonic tank – do you want/need any water stop along the bottom edge of the main walls and/or for the sump pit? | Yes a waterproofing is necessary on the interior surfaces of the pit floor, sump and up the sidewalls to a minimum of 3-ft. The drawings are updated to reflect this information. |
| Compressor pads – On sheet 8 where it says “OLD COMPRESSOR PAD” and then gives a measurement, is that the depth of the existing hole? | The numbers are the minimum depth that the existing concrete is thick. In that location it says 24"+ meaning that it is more than 24" thick (it is a raised pad and we do not know how deep it goes). |
| Ground rods – Note 13 on Sheet 5 discusses ground rods in the mounting pads. Is that one ground rod per pad, for a total of 9 ground rods? What size ground rods are required? | We will only need one ground rod total for the project for the Ultrasonic Pit. Drawings are updated to eliminate the requirement for other location. |