Contractor Questions W519TC26RA026 B230 Government Answers.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Concrete Pads B230
- Solicitation number
- W519TC26RA026
About this file
This is a Contractor Questions and Government Answers document for solicitation W519TC26RA026 addressing concrete work on Building 230 at Rock Island Arsenal.
The document clarifies two key contractor inquiries. First, regarding pricing structure, the solicitation includes seven Contract Line Item Numbers (CLINs) for eight work areas defined in the drawings, with work areas 4 and 5 consolidated under a single CLIN due to their equivalent pad sizes; vendors should price work area 8 accordingly within the existing CLIN structure. Second, regarding equipment restrictions, contractors may use diesel equipment throughout the full scope of work, including in enclosed or partially enclosed spaces; however, the contractor bears sole responsibility for ensuring a safe work environment compliant with minimum requirements outlined in Item 5 of the Scope of Work, which addresses ventilation requirements, emissions limitations, and proximity constraints. A mandatory site visit is scheduled for Thursday, April 16, 2026, at 10:00 AM Central Time, with interested contractors required to notify Contract Specialist Brandy Huesmann at brandy.m.huesmann.civ@army.mil at least 24 hours in advance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W519TC26RA026 0001 SF30.pdf | ||
| 26-4-14 Concrete Work B230 (26-03-12) SOW.pdf | ||
| W519TC26RA026.pdf | ||
| 26-4-14 Quality Assurance Surveillance Plan.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 W519TC26RA026 - Concrete Work Building 230
| Contractor Questions | Government Answer | |
| 1 | The solicitation provides for 7 different CLINS. There are 8 work areas called for thein the drawings. Where should the vendor include the price for work area #8? | There is one CLIN that has a quantity of two because the pads are effectively the same size. see Areas 4 and 5 |
| 2 | Can diesel equipment be used at all times to develop the full scope of work, including within enclosed or partially enclosed spaces? If not, please define the specific restrictiosn, includding but not limited to ventilation requirements, emissions limitations, or proximity constraints. | The Contractor is solely responsible for ensuring that they provide a safe work environment for Government and Contractor employees. Sheet-2 Item-5 of the Scope of Work provides information on minimum requirements that are known to the Government. |
File details come from the government source that posted it. Updated .