26-4-14 Quality Assurance Surveillance Plan.xls
XLS spreadsheet 42 KB Posted
- Attached to
- Concrete Pads B230
- Solicitation number
- W519TC26RA026
About this file
This is a Quality Assurance Surveillance Plan (QASP) for concrete work at Rock Island Arsenal under solicitation W519TC26RA026. The QASP outlines five key surveillance tasks for a concrete mounting pad project, each with specific performance standards and inspection methods. Security procedures require 100% visual verification that all personnel at the site maintain proper badges and roster documentation, with the work roster maintained daily at 90% acceptable quality level to ensure site safety and accountability. The contractor must submit a project timeline within one week of contract award showing the completion plan, subject to 100% visual or written verification and adjustable during performance if needed to meet the contracted completion date.
Material inspections will be conducted on a random basis to verify that contractor-provided materials meet the contracted scope of work and minimum industry standards, such as slump or temperature tests for incoming concrete, with 100% acceptable quality level. A final inspection will be performed once upon completion to verify all work is completed in accordance with the contracted scope of work, requiring 100% visual verification. Daily site inspections at 90% acceptable quality level will observe that work is being performed safely and in accordance with the contractor's provided timeline and the contracted scope of work. The QASP is dated March 12, 2026, and is associated with the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contractor Questions W519TC26RA026 B230 Government Answers.xlsx | XLSX spreadsheet | |
| W519TC26RA026 0001 SF30.pdf | ||
| W519TC26RA026.pdf | ||
| 26-4-14 Concrete Work B230 (26-03-12) SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP
| Task | Contract Reference | Frequency | Performance Standard | Acceptable Quality Level | Surveilance Method | Surveilance Date(s) | Performance Level | Notes |
| Site Conference | Sheet 1 - Security Notes | Once | Each individual working at the site must receive this information for safety and accountability purposes. May be updated if additional personnel come to the work site. May be performed as part of the badging process. | 100% | Visual/Roster | |||
| Work Roster | Sheet 1 - Security Notes | Daily | Must be maintained for safety and security purposes. Must show who is at the work-site at any given time. | 90% | Written Roster | |||
| Project Timeline | Dictated by contract | Once | To be provided within 1-week of award of the contract. Must show plan for completion prior to the date stated in the contract. May be adjusted during performance provided within project completion date. | 100% | Visual/Written | |||
| Site Inspection | Sheet 1 - Security Notes | Daily | Observe work is being performed safely and in accordance with the contractor provided timeline and IAW the contracted Scope of Work | 90% | Visual | |||
| Materials Inspections | Sheet 1 - Notes 1-17 | Random | Materials provided by the contractor may be inspected to ensure that they meet the contracted Scope of Work and minimum industry and design standards. (e.g. slump or temperature tests of incoming concrete) | 100% | Visual/ Measurement | |||
| Final Inspection | Sheet 1 - Notes 1-17 | Once | Verify that all work is completed IAW the contracted Scope of Work | 100% | Visual |
&LRock Island Arsenal Quality Assurance Surveillance Plan&CConcrete Work (Concrete Mounting Pad)&RTARA-LGC-26-4-14 DATE: 12-Mar-26
File details come from the government source that posted it. Updated .