This document is a Solicitation Amendment (Amendment 4) for a federal contract opportunity for Heavy Duty Vertical Saws, solicitation number W519TC25Q2195 issued by the Army Contracting Command - Rock Island. The amendment addresses several technical clarifications and questions from potential contractors, including: acceptable roller diameter specifications (2.5" diameter rollers now acceptable), confirmation that a vertical-style miter saw is required, clarification on extension roller table mounting requirements, and acceptance of hydraulic hold-downs with a 21" high capacity instead of the originally specified 24" height.
The amendment also includes a note about tariff pricing, stating that this is a competitive, firm-fixed price contract. Contractors are expected to quote their best pricing at the time of solicitation, including shipping FOB destination. The government acknowledges the complexity of global component sourcing and tariffs, but emphasizes that contractors should include their best pricing based on the delivery schedule, with the understanding that early deliveries will be accepted if there are no additional charges.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08 SOLICITATION AMENDMENT 3.pdf | ||
| A02 RIPD E4000-25-2-03 Saws Revised 042125 (004).pdf | ||
| A02 RIPD E4000-25-2-03 Saws Revised 041425 (003).pdf | ||
| B08 SOLICITATION AMENDMENT 2.pdf | ||
| B08 W519TC25Q2195 AMENDMENT 1.pdf | ||
| B08 W519TC25Q2195.pdf | ||
| A03 25-2-03 CDRL.pdf | ||
| A02 RIPD E4000-25-2-03 Saws FINAL - Copy.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE SUMMARY OF CHANES.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Apr-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W519TC25Q2195
X 9B. DATED (SEE ITEM 11)
01-Apr-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Apr-2025
CODE
ARMY CONTRACTING COMMAND - ROCK ISLAND
3055 RODMAN AVE
ROCK ISLAND IL 61299
W519TC 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W519TC25Q2195
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SOLICITATION AMENDMENT 4
The purpose of this Solicitation Amendment 4 is to:
1. Answer contractor submitted questions.
2. All other terms and conditions remain unchanged.
The following have been modified:
QUESTIONS AND ANSWERS
Q1. "Are the 3.5" rollers necessary. The manufacturer Marvel uses 2.5" diameter rollers on their roller tables which is standard with that machine. Also, the marvel tables are fabricated to bolt to the machines and have the correct height and mount in the infeed and outfeed of the machine."
A1. 2.5" diameter rollers will be acceptable.
Q2. "Does the end user need a vertical style miter saw or can it be a horizontal style? There is a difference and depending on the application, perhaps a horizontal style does not work."
A2. A vertical style miter saw is needed IAW the scope of work (ATTACHMENT A02 RIPD E4000-25-2-03
SAWS FINAL-COPY).
Q3. “This specification may be incorrect:
4.3.5 EXTENSION ROLLER TABLE: 10'0" long. (Min.) Out feed table must be able to support 5,000 lb. (min.) 3.5" diameter ball bearing rollers (min.) on 6" centers. (Max.)
1st Section Dead Roller Table, 10' (F106): They attach to the machine on either the in-feed or discharge (outfeed) sides of the machine. They are
FIRST.
If you want a 10' infeed conveyor and a 10' discharge conveyor, you order
(2) of the above and we specify when ordering from the factory (1) for infeed and (1) for discharge.
Extension Dead Roller Table, 10' (X106) ONLY attach to other Dead Roller Tables, NEVER the machine.
A F106 is $X as it has more legs and the ability to mount to the machine than a X106 which is $X and can only mount to another conveyor section.
If someone bids as is currently specified, they will be less expensive, but be supplying a conveyor section that will not be able to mount to the discharge side of the machine without a first section conveyor."
A3. Thank you for pointing this out, you are correct. The intention is to have an infeed and an outfeed table which attach to either side of the machine.
Q4. “4.3.2 HYDRAULIC HOLD-DOWNS: Nesting fixtures for top clamping for multiple cutting. Vertically mounted hydraulic clamps on each vise jaw Min. Capacity:
24" High.
Question:
Will the customer accept hydraulic hold-downs top clamping with a minimum capacity of 21" high?
With a 48" shuttle on an Amada-Marvel VT5063SW (2150APCS) the maximum vertical clamping is 21".
Optional extended feed shuttles, 8', 13' & 18' have 25" vertical, but the other specifications in the RIPD speak to a 48" shuttle machine, not an extended feed machine.”
A4. Hydraulic hold-downs top clamping with a 21" high capacity will be acceptable.
Q5. I would like to point out that Amendment 3 made acceptable: hydraulic hold downs top clamping with a 21” high capacity.
In reviewing the revised RIPD these (2) sections were updated on A02+RIPD+E4000-25-2- 03+SAWS+REVISED+042125+(004).pdf to reflect that:
4.4.6 HYDRAULIC HOLD-DOWN: (Nest clamp) mounted on the machine table. For vertical clamping of structural shapes or multiple bar work. Capacity 15” horizontal, and up to 20” vertical, using extension sections with clamps.
4.4.7 HYDRAULIC HOLD-DOWN SHUTTLE: (Nest clamp) mounted on automatic index table. For vertical clamping of structural shapes or multiple bar work. Capacity 15” horizontal, and up to 20” vertical, using extension sections supplied with clamps.
But, this section was not:
4.3.2 HYDRAULIC HOLD-DOWNS: Nesting fixtures for top clamping for multiple cutting. Vertically mounted hydraulic clamps on each vise jaw Min. Capacity: 24” High.
A5. Sections 4.4.6 and 4.4.7 have not been modified in the A02+RIPD+E4000-25-2- 03+SAWS+REVISED+042125+(004) as you referenced. Those sections have not been modified from the original version of the RIPD.
As for 4.3.2, there were no changes made, but hydraulic hold-downs top clamping with a 21" capacity remains acceptable. That section was not altered because a 24" capacity may be possible for another vendor.
When completing the tech review, a non-compliance with section 4.3.2 and subsequent explanation of a 21" capacity as discussed will be deemed as a minor non-compliance and will be accepted.
Q6. How is the government handling tariff pricing?
While the Saw we will be offering is made in the US, it is constructed employing globally sourced components and as such, like all the machine builders we represent, in the now volatile and ever-changing tariff landscape, is issuing this statement to buyers on purchase contracts:
If new tariffs, duties, taxes, or other government-imposed charges are introduced or modified either prior to or after the execution of a contract, the parties agree to promptly and in good faith renegotiate the pricing to reasonably reflect the financial impact of such changes. Any agreed-upon adjustments shall be documented in writing.
A6. There has been no guidance from the administration and there are no set processes in place to account for these volatile times. In some situations, there may be FAR clauses in our solicitations that would apply to such changes, depending on the dollar value and/or acquisition strategy being used for a requirement, such as 52.229-3 regarding taxes, 52.216-2, 3, 4 regarding equitable adjustments, or DFARS 252.225-7013 regarding duty free taxes. For this scenario, this is a competitive, firm fixed price action and contractors are to quote their best pricing at the time of solicitation, including shipping FOB destination, as indicated in the solicitation. Since there has been a pause on tariffs currently and they may or may not be in place at the time of award/delivery, and since the Government isn’t aware where contractors receive their supplies from, it would be the contractor’s responsibility to decide if the pricing should include them based on the delivery schedule outlined in the solicitation, but noting that the Government will accept early deliveries if at no additional charge. I must stress again that this is a competitive, firm fixed price contract and the low contractor will be expected to hold their pricing as quoted for the time frame specified in the solicitation.