This document is a Contract Data Requirements List (CDRL) DD Form 1423-1 for a Heavy Duty Vertical Saws procurement by the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal. The CDRL outlines five primary data items the contractor must provide:
- Installation and Preparation Documentation (6 subtypes including equipment characteristics, installation drawings, schematics, and equipment identification) to be submitted electronically in PDF, DXF, or Word format 60 calendar days prior to equipment delivery. 2. Maintenance Manual with safety lockout and preventive maintenance procedures (3 copies, 2 paper and 1 electronic). 3. Operator Manual detailing safe equipment operation procedures. 4. Environmental Compliance Data including Safety Data Sheets and a comprehensive chemical list for all liquids and gases necessary to operate the equipment. 5. A Pre-Shipment Testing Report to be submitted 10 calendar days before equipment delivery. All documentation is to be provided to Rock Island Arsenal and Drew Canada, with specific formatting and submission requirements detailed for each data item.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08 SOLICITATION AMENDMENT 4.pdf | ||
| B08 SOLICITATION AMENDMENT 3.pdf | ||
| A02 RIPD E4000-25-2-03 Saws Revised 042125 (004).pdf | ||
| A02 RIPD E4000-25-2-03 Saws Revised 041425 (003).pdf | ||
| B08 SOLICITATION AMENDMENT 2.pdf | ||
| B08 W519TC25Q2195 AMENDMENT 1.pdf | ||
| B08 W519TC25Q2195.pdf | ||
| A02 RIPD E4000-25-2-03 Saws FINAL - Copy.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 18 Pages
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send com ments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Governme nt Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY
D. SYSTEM/ITEM
Saws
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Characteristics
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD250 REQ
9. DIST
STATEMENT
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
b. COPIES
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in either electronic or paper format, no later than 30-calendar-days after award of the contract. The contractor shall provide this information in electronic format using Microsoft Excel format.
The specific data required is:
Identify required info from LMP
BLADE_LENGTH
BLADE_SPEED_MAX SHUTTLE_LENGTH_MAX
BLADE_SPEED_MIN SITE_CODE
BLADE_WIDTH TABLE_DEPTH
CAPACITY_BAR TABLE_LENGTH
CAPACITY_TUBE THICKNESS_MAX_IN
CUT_OFF_TYPE THROAT_OPENING
FEED_RATE_STROKE_MAX TILT_Y_N
FEED_RATE_STROKE_MIN WET_DRY
HEAD_TILT_LEFT WORK_WIDTH
HEAD_TILT_RIGHT
HORSEPOWER
MACHINE_GROUP
MACHINE_ORIENTATION
SAW_TYPE
15. TOTAL
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 18 Pages
G. PREPARED BY
Dane Taghon
H. DATE
04-Feb-2025
I. APPROVED BY
J. DATE
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Installation Documentation List
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format, a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
A plainly visible cover sheet shall be provided with the Installation and
Preparation Documentation package listing drawings and schematics required for installation.
PROVIDE COPIES, AS REQUESTED TO THE FOLLOWING:
Rock Island Arsenal
ATTN: TARA-LGC
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 18 Pages
Drew Canada 2744 Rodman Ave (B220-B-D28) Rock Island, IL 61299-6400
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Tool List
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
An itemized list of all fixtures, tools, and equipment, whether special or not, required to install, align, and maintain the equipment in this purchase description. NOTE: The contractor is responsible for providing special/custom tools and equipment necessary for installation, moving, and/or set-up as part of the equipment.
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 18 Pages
Rock Island Arsenal
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Footprint Drawing
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
A dimensioned drawing shall be provided to accurately depict the layout of system, showing contours. It shall be fully dimensioned and include net operating clearance for moving components which travel beyond the gross contour. The drawing shall distinguish between the base of the equipment at floor level and the gross contour where it may overhang the base. Location of access doors for servicing of the equipment shall also be designated.
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 18 Pages
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Machine Foundation Drawing
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this information no later than
60-calendar-days after award of contract. Of these, (2) will be paper, and
(1) shall be electronic. Acceptable electronic formats include acrobat files
(.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment requires a separate foundation, a drawing must be provided for approval. This will show all information necessary for a contractor to perform the required concrete preparation work prior to final installation of the system.
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 18 Pages
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Installation Drawing
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 7 of 18 Pages
This drawing may be combined with either the Foundation Drawing or the
Footprint Drawing, providing clarity is maintained. This drawing will provide location dimensions for anchor bolts including both the anchor bolt size and height of anchor bolt concrete surfaces clearly shown.
Dimensions will be from a common baseline, not chain dimensions. This is to prevent tolerance stack-up errors. Locations of the first connection points for all required power sources shall be shown and dimensioned.
Approximate gross weight of each separate component shall be indicated.
This drawing shall show capacity requirements at each utility point of first connection.
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Electrical Schematic
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 8 of 18 Pages
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated.
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Pneumatic Schematic
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS SEE BLOCK 16
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 9 of 18 Pages
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated.
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Hydraulic Schematic
REQUIRED
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
8. APP CODE Final
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 10 of 18 Pages
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment includes this type of utility and a complete system schematic is required. The total amount of fluid in the system and the amount in the reservoir must be clearly identified along with the type and grade.
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Water Piping Schematic
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 11 of 18 Pages
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
The contractor shall provide a second copy of this information in electronic or paper format at the time of delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
The equipment includes this type of utility and a complete system schematic is required. The capacity required at the point of first connection must be clearly stated including flow rate, temperature requirements (if any), and any other specifications even if the vendor is providing equipment (e.g. filtration, pressure change, etc). Also, any requirement for discharge/drainage must be included along with the volume and quality of the discharge (will it have chemicals or is it completely isolated such as for some cooling coils).
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 12 of 18 Pages
2. TITLE OF DATA ITEM
Installation and Preparation Documentation
3. SUBTITLE
Equipment Identification
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide a copy of this information in electronic format a minimum of 60-calendar-days prior to delivery of equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This document shall consist of the make & model of the equipment with a complete list of standard features, optional features being installed in order to meet the specification, and a list of optional features available for field installation but not included. Each section shall be clearly identified.
Also included will be any technical data or brochures applicable to the equipment being provided.
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 13 of 18 Pages
2. TITLE OF DATA ITEM
Maintenance Manual
3. SUBTITLE
Safety Lockout Procedure
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This shall be a written procedure describing safe machine shutdown and the sequence by which lockout devices, and if necessary, line blocks and other restraints are affixed and removed prior to maintenance and service.
This may include drawings or photographs for clarity.
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 14 of 18 Pages
2. TITLE OF DATA ITEM
Maintenance Manual
3. SUBTITLE
Preventive Maintenance Procedure
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This section of the documentation shall include: Daily Operator Checklist, Visual Inspections, and a Lubrication Schedule. Procedures and schedules for inspections, adjustments, cleaning, and component replacements.
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 15 of 18 Pages
2. TITLE OF DATA ITEM
Operator Manual
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (3) copies of this manual/information with delivery of the equipment. Of these, (2) will be paper, and (1) shall be electronic. Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
This section of the documentation shall include: Procedures for safe operation of the equipment in all modes. It shall include information necessary for performing all the operations and utilizing all the functions listed in the purchase description.
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 16 of 18 Pages
2. TITLE OF DATA ITEM
Environmental Compliance Data
3. SUBTITLE
Safety Data Sheets (SDS)
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (1) copy of this information in electronic format no later than 30-calendar-days prior to delivery of the equipment.
SDS Sheets for all liquids (e.g. oils or coolants) and any hazardous materials shall be provided.
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
21-Apr-2021
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 17 of 18 Pages
2. TITLE OF DATA ITEM
Environmental Compliance Data
3. SUBTITLE
Chemical List
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (1) copy of this information in electronic format no later than 30-calendar-days prior to delivery of the equipment.
Acceptable electronic formats include acrobat files (.pdf), drawing exchange files (.dxf), and Microsoft Word (.doc).
A list of all chemicals necessary to operate the equipment shall be provided by the vendor. This is necessary in order to meet environmental compliance requirements. The list shall include the type, grade, and quantity of each liquid or gas regardless of who is to provide the actual material. (E.g. if hydraulic oil is necessary to operate the system, it shall be listed as 200-gal-u.s. of DTE-XX.)
ATTN: TARA-LGC
Drew Canada
Dane Taghon
H. DATE
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing in structions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202 -4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 18 of 18 Pages
2. TITLE OF DATA ITEM
Pre-Shipment Testing Report
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE Draft
Final
Reg Repro
16. REMARKS
The contractor shall provide (1) copy of this information in electronic format no later than 10-calendar-days prior to delivery of the equipment.