W5168W23R0004-23 AUG 2023-Solicitation-YPG.pdf
PDF 1 MB Posted
- Solicitation number
- W5168W23R0004
- Issued by
-
Department of the Army
About this file
This is a solicitation for base operation support services at Yuma Proving Ground in Arizona. The Army is seeking these services for a one-year base period and four one-year options. Required services include program management, facilities maintenance, grounds maintenance, solid waste management, unaccompanied personnel housing management, pavement clearance, and pest management. Prices are fixed for the base period and option years. Responses are due by 12:00 PM on 27 October 2023. Award will be made on the Standard Form 33. The NAICS code for this procurement is 561210.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 12:00 PM local time 27 Oct 2023
A
X B
C
D
EX
X
G
F
94 - 107
H 108 - 113 samuel.j .colton.civ@army .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 113
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W5168W 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
SAMUEL J. COLTON 210-808-6488
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 44
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
45 - 46
47 - 51 K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror)
X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
52 - 90
PART II - CO NTRACT CLAUSES
FDO FSH IRC
2371 INFANTRY POST RD, BLDG 602
FORT SAM HOUSTON TX 78234
210-221-1191
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
91 - 93
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
23 Aug 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W5168W23R0004
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 10 Months Program Management
FFP
This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment
A. Refer to the Pricing Matrix (Attachment J), to confirm monthly pricing.
FOB: Destination
PSC CD: S216
NET AMT
0002 10 Months CLS 200 Unaccompanied Personnel Housing
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing
(UPH) Management Operation IAW the terms and conditions of the PWS and
Attachment C, Annex C CLS 200 Unaccompanied Personnel Housing
Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
0003 10 Months CLS 403 Solid Waste Management
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 403 Solid Waste Management IAW the terms and conditions of the PWS and Attachment D, CLS 403 Solid Waste
Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
0004 10 Months CLS 404 Grounds Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment E, CLS 404 Grounds Maintenance.
Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
0005 10 Months CLS 408 Pavement Clearance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment F, CLS 408
Pavement Clearance. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated OWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing. PWO Mark-Up
Rate:____________
0006 10 Months CLS 411 Preventative Maintenance Vert
FFP
Preventative Maintenance Vertical in accordance with Annex H, CLS 411
Facilities Maintenance Vertical.
0007 10 Months CLS 411 Facilities Maintenance Vertical
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment G, CLS 411 Facility
Maintenance Vertical. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
0008 10 Months Optional Facilities Maintenance Vertical
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the
Pricing Matrix, to confirm pricing and the applicable banding structure.
0009 10 Months Optional Facilities Maintenance Vertical
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X007 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
0010 10 Months ATEC Property Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions required for the maintenance and repair of Army Training and Evaluation Command (ATEC) non-real property in accordance with PWS
Section 2.2.3.2 and 2.2.4. Please refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
0011 10 Months CLS 420 Preventative Maintenance
FFP
Preventative Maintenance in accordance with Annex J, CLS 420 Facilities
Maintenance Horizontal.
0012 10 Months CLS 420 Facilities Maintenance Horiz.
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance Horizontal, IAW the terms and conditions of the PWS and Attachment H, CLS 420 Facility
Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
0013 10 Months Optional Facilities Maintenance Horiz
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the
Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
0014 10 Months Optional Facilities Maintenance Horiz
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X011 for work performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
0015 10 Months CLS 510 Pest Management Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment I, CLS 510 Pest Management. Refer to the
Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
0016 10 Months Project Work Orders
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section
2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
0017 10 Months ATEC Project Work Orders (PWO)
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in ATEC Project Work Orders (PWO) as specified in PWS
Section 2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
0018 2 Months Phase in (60 Days)
FFP
Contractor shall perform 60-days Phase-In activities in accordance with PWS
Section 2.1.2.1 and the Contractor approved Phase-In Plan. Refer to the Pricing
Matrix (Attachment J), to confirm pricing and the applicable banding structure.
1001 12 Months OPTION Program Management
FFP
This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment
A. Refer to the Pricing Matrix (Attachment J), to confirm monthly pricing.
1002 12 Months OPTION CLS 200 Unaccompanied Personnel Housing
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing
(UPH) Management Operation IAW the terms and conditions of the PWS and
Attachment C, Annex C CLS 200 Unaccompanied Personnel Housing
Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
1003 12 Months OPTION CLS 403 Solid Waste Management
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 403 Solid Waste Management IAW the terms and conditions of the PWS and Attachment D, CLS 403 Solid Waste
1004 12 Months OPTION CLS 404 Grounds Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment E, CLS 404 Grounds Maintenance.
Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
1005 12 Months OPTION CLS 408 Pavement Clearance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment F, CLS 408
Pavement Clearance. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated OWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing. PWO Mark-Up
Rate:____________
1006 12 Months OPTION CLS 411 Preventative Maintenance Vert
FFP
Preventative Maintenance Vertical in accordance with Annex H, CLS 411
Facilities Maintenance Vertical.
1007 12 Months OPTION CLS 411 Facilities Maintenance Vertical
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment G, CLS 411 Facility
Maintenance Vertical. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
1008 12 Months OPTION Optional Facilities Maintenance Vertical
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the
Pricing Matrix, to confirm pricing and the applicable banding structure.
1009 12 Months OPTION Optional Facilities Maintenance Vertical
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X007 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
1010 12 Months OPTION ATEC Property Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions required for the maintenance and repair of Army Training and Evaluation Command (ATEC) non-real property in accordance with PWS
Section 2.2.3.2 and 2.2.4. Please refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
1011 12 Months OPTION CLS 420 Preventative Facilities Maintent
FFP
Preventative Maintenance in accordance with Annex J, CLS 420 Facilities
Maintenance Horizontal.
1012 12 Months OPTION CLS 420 Facilities Maintenance Horiz.
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance Horizontal, IAW the terms and conditions of the PWS and Attachment H, CLS 420 Facility
Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
1013 12 Months OPTION Optional Facilities Maintenance Horiz
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the
Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
1014 12 Months OPTION Optional Facilities Maintenance Horiz
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X011 for work performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
1015 12 Months OPTION CLS 510 Pest Management Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment I, CLS 510 Pest Management. Refer to the
Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
1016 12 Months OPTION Project Work Orders
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section
2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
1017 12 Months OPTION ATEC Project Work Orders (PWO)
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in ATEC Project Work Orders (PWO) as specified in PWS
Section 2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
2001 12 Months OPTION Program Management
FFP
This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment
A. Refer to the Pricing Matrix (Attachment J), to confirm monthly pricing.
2002 12 Months OPTION CLS 200 Unaccompanied Personnel Housing
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing
(UPH) Management Operation IAW the terms and conditions of the PWS and
Attachment C, Annex C CLS 200 Unaccompanied Personnel Housing
Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
2003 12 Months OPTION CLS 403 Solid Waste Management
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 403 Solid Waste Management IAW the terms and conditions of the PWS and Attachment D, CLS 403 Solid Waste
2004 12 Months OPTION CLS 404 Grounds Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment E, CLS 404 Grounds Maintenance.
Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
2005 12 Months OPTION CLS 408 Pavement Clearance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment F, CLS 408
Pavement Clearance. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated OWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing. PWO Mark-Up
Rate:____________
2006 12 Months OPTION CLS 411 Preventative Maintenance Vert
FFP
Preventative Maintenance Vertical in accordance with Annex H, CLS 411
Facilities Maintenance Vertical.
2007 12 Months OPTION CLS 411 Facilities Maintenance Vertical
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment G, CLS 411 Facility
Maintenance Vertical. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
2008 12 Months OPTION Optional Facilities Maintenance Vertical
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the
Pricing Matrix, to confirm pricing and the applicable banding structure.
2009 12 Months OPTION Optional Facilities Maintenance Vertical
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X007 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
2010 12 Months OPTION ATEC Property Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions required for the maintenance and repair of Army Training and Evaluation Command (ATEC) non-real property in accordance with PWS
Section 2.2.3.2 and 2.2.4. Please refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
2011 12 Months OPTION CLS 420 Preventative Facilities Maint
FFP
Preventative Maintenance in accordance with Annex J, CLS 420 Facilities
Maintenance Horizontal.
2012 12 Months OPTION CLS 420 Facilities Maintenance Horiz.
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance Horizontal, IAW the terms and conditions of the PWS and Attachment H, CLS 420 Facility
Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
2013 12 Months OPTION Optional Facilities Maintenance Horiz
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the
Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
2014 12 Months OPTION Optional Facilities Maintenance Horiz
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X011 for work performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
2015 12 Months OPTION CLS 510 Pest Management Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment I, CLS 510 Pest Management. Refer to the
Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
2016 12 Months OPTION Project Work Orders
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section
2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
2017 12 Months OPTION ATEC Project Work Orders (PWO)
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in ATEC Project Work Orders (PWO) as specified in PWS
Section 2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
3001 12 Months OPTION Program Management
FFP
This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment
A. Refer to the Pricing Matrix (Attachment J), to confirm monthly pricing.
3002 12 Months OPTION CLS 200 Unaccompanied Personnel Housing
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing
(UPH) Management Operation IAW the terms and conditions of the PWS and
Attachment C, Annex C CLS 200 Unaccompanied Personnel Housing
Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
3003 12 Months OPTION CLS 403 Solid Waste Management
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 403 Solid Waste Management IAW the terms and conditions of the PWS and Attachment D, CLS 403 Solid Waste
3004 12 Months OPTION CLS 404 Grounds Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment E, CLS 404 Grounds Maintenance.
Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
3005 12 Months OPTION CLS 408 Pavement Clearance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment F, CLS 408
Pavement Clearance. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated OWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing. PWO Mark-Up
Rate:____________
3006 12 Months OPTION CLS 411 Preventative Maintenance Vert
FFP
Preventative Maintenance Vertical in accordance with Annex H, CLS 411
Facilities Maintenance Vertical.
3007 12 Months OPTION CLS 411 Facilities Maintenance Vertical
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment G, CLS 411 Facility
Maintenance Vertical. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
3008 12 Months OPTION Optional Facilities Maintenance Vertical
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the
Pricing Matrix, to confirm pricing and the applicable banding structure.
3009 12 Months OPTION Optional Facilities Maintenance Vertical
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X007 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
3010 12 Months OPTION ATEC Property Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions required for the maintenance and repair of Army Training and Evaluation Command (ATEC) non-real property in accordance with PWS
Section 2.2.3.2 and 2.2.4. Please refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
3011 12 Months OPTION CLS 420 Preventative Facilities Maint
FFP
Preventative Maintenance in accordance with Annex J, CLS 420 Facilities
Maintenance Horizontal.
3012 12 Months OPTION CLS 420 Facilities Maintenance Horiz.
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance Horizontal, IAW the terms and conditions of the PWS and Attachment H, CLS 420 Facility
Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
3013 12 Months OPTION Optional Facilities Maintenance Horiz
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the
Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
3014 12 Months OPTION Optional Facilities Maintenance Horiz
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X011 for work performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
3015 12 Months OPTION CLS 510 Pest Management Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment I, CLS 510 Pest Management. Refer to the
Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
3016 12 Months OPTION Project Work Orders
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section
2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
3017 12 Months OPTION ATEC Project Work Orders (PWO)
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in ATEC Project Work Orders (PWO) as specified in PWS
Section 2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
4001 12 Months OPTION Program Management
FFP
This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment
A. Refer to the Pricing Matrix (Attachment J), to confirm monthly pricing.
4002 12 Months OPTION CLS 200 Unaccompanied Personnel Housing
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing
(UPH) Management Operation IAW the terms and conditions of the PWS and
Attachment C, Annex C CLS 200 Unaccompanied Personnel Housing
Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
4003 12 Months OPTION CLS 403 Solid Waste Management
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 403 Solid Waste Management IAW the terms and conditions of the PWS and Attachment D, CLS 403 Solid Waste
4004 12 Months OPTION CLS 404 Grounds Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment E, CLS 404 Grounds Maintenance.
Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
4005 12 Months OPTION CLS 408 Pavement Clearance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment F, CLS 408
Pavement Clearance. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated OWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing. PWO Mark-Up
Rate:____________
4006 12 Months OPTION CLS 411 Preventative Maintenance Vert
FFP
Preventative Maintenance Vertical in accordance with Annex H, CLS 411
Facilities Maintenance Vertical.
4007 12 Months OPTION CLS 411 Facilities Maintenance Vertical
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment G, CLS 411 Facility
Maintenance Vertical. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
4008 12 Months OPTION Optional Facilities Maintenance Vertical
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the
Pricing Matrix, to confirm pricing and the applicable banding structure.
4009 12 Months OPTION Optional Facilities Maintenance Vertical
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X007 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
4010 12 Months OPTION ATEC Property Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions required for the maintenance and repair of Army Training and Evaluation Command (ATEC) non-real property in accordance with PWS
Section 2.2.3.2 and 2.2.4. Please refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
4011 12 Months OPTION CLS 420 Preventative Facilities Maint
FFP
Preventative Maintenance in accordance with Annex J, CLS 420 Facilities
Maintenance Horizontal.
4012 12 Months OPTION CLS 420 Facilities Maintenance Horiz.
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance Horizontal, IAW the terms and conditions of the PWS and Attachment H, CLS 420 Facility
Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
4013 12 Months OPTION Optional Facilities Maintenance Horiz
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the
Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
4014 12 Months OPTION Optional Facilities Maintenance Horiz
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X011 for work performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
4015 12 Months OPTION CLS 510 Pest Management Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment I, CLS 510 Pest Management. Refer to the
Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.
4016 12 Months OPTION Project Work Orders
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section
2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
4017 12 Months OPTION ATEC Project Work Orders (PWO)
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in ATEC Project Work Orders (PWO) as specified in PWS
Section 2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 N/A N/A N/A Government
0007 Destination Government Destination Government
0008 Destination Government Destination Government
0009 Destination Government Destination Government
0010 Destination Government Destination Government
0011 N/A N/A N/A Government
0012 Destination Government Destination Government
0013 Destination Government Destination Government
0014 Destination Government Destination Government
0015 Destination Government Destination Government
0016 Destination Government Destination Government
0017 Destination Government Destination Government
0018 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
1005 Destination Government Destination Government
1006 N/A N/A N/A Government
1007 Destination Government Destination Government
1008 Destination Government Destination Government
1009 Destination Government Destination Government
1010 Destination Government Destination Government
1011 N/A N/A N/A Government
1012 Destination Government Destination Government
1013 Destination Government Destination Government
1014 Destination Government Destination Government
1015 Destination Government Destination Government
1016 Destination Government Destination Government
1017 Destination Government Destination Government
2001 Destination Government Destination Government
2002 Destination Government Destination Government
2003 Destination Government Destination Government
2004 Destination Government Destination Government
2005 Destination Government Destination Government
2006 N/A N/A N/A Government
2007 Destination Government Destination Government
2008 Destination Government Destination Government
2009 Destination Government Destination Government
2010 Destination Government Destination Government
2011 N/A N/A N/A Government
2012 Destination Government Destination Government
2013 Destination Government Destination Government
2014 Destination Government Destination Government
2015 Destination Government Destination Government
2016 Destination Government Destination Government
2017 Destination Government Destination Government
3001 Destination Government Destination Government
3002 Destination Government Destination Government
3003 Destination Government Destination Government
3004 Destination Government Destination Government
3005 Destination Government Destination Government
3006 N/A N/A N/A Government
3007 Destination Government Destination Government
3008 Destination Government Destination Government
3009 Destination Government Destination Government
3010 Destination Government Destination Government
3011 N/A N/A N/A Government
3012 Destination Government Destination Government
3013 Destination Government Destination Government
3014 Destination Government Destination Government
3015 Destination Government Destination Government
3016 Destination Government Destination Government
3017 Destination Government Destination Government
4001 Destination Government Destination Government
4002 Destination Government Destination Government
4003 Destination Government Destination Government
4004 Destination Government Destination Government
4005 Destination Government Destination Government
4006 N/A N/A N/A Government
4007 Destination Government Destination Government
4008 Destination Government Destination Government
4009 Destination Government Destination Government
4010 Destination Government Destination Government
4011 N/A N/A N/A Government
4012 Destination Government Destination Government
4013 Destination Government Destination Government
4014 Destination Government Destination Government
4015 Destination Government Destination Government
4016 Destination Government Destination Government
4017 Destination Government Destination Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 14-FEB-2024 TO
13-DEC-2024
N/A US ARMY GARRISON
US ARMY GARRISON
2100 RM 301 C. ST BLDG 402
YUMA AZ 85365
W58BKP
0002 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0006 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0007 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0008 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0009 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0010 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0011 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0012 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0013 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0014 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0015 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0016 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0017 POP 14-FEB-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
0018 POP 14-DEC-2023 TO
13-FEB-2024
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 14-DEC-2024 TO
13-DEC-2025
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1003 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1004 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1005 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1006 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1007 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1008 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1009 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1010 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1011 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1012 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1013 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1014 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1015 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1016 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
1017 POP 14-DEC-2024 TO
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 14-DEC-2025 TO
13-DEC-2026
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 14-DEC-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2003 POP 14-DEC-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2004 POP 14-DEC-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2005 POP 14-DEC-2025 TO
N/A (SAME AS PREVIOUS LOCATION)
2006…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .