This is a solicitation for base operation support services at Yuma Proving Ground in Arizona. The Army is seeking these services for a one-year base period and four one-year options. Required services include program management, facilities maintenance, grounds maintenance, solid waste management, unaccompanied personnel housing management, pavement clearance, and pest management. Prices are fixed for the base period and option years. Responses are due by 12:00 PM on 27 October 2023. Award will be made on the Standard Form 33. The NAICS code for this procurement is 561210.

View the file

Other files

File Type Posted
Attachment K - Staffing Matrix-27DEC2023-W5168W-23-R-0004-YPG.xlsx XLSX spreadsheet
TE_50_Landfill_Permit-05JAN2024.pdf PDF
TE_15_Grounds_Inventory_05JAN2024.xlsx XLSX spreadsheet
Attachment G - YUMA Annex H CLS 411 Facilities Maintenance Vertical-04JAN2024.pdf PDF
Attachment V-W5168W-23-R-0004-YPG-ServiceContract-WageDetermination.pdf PDF
Attachment_Q_Davis_Bacon_Residential_29NOV2023.pdf PDF
Attachment D - YUMA Annex E CLS 403 Waste Management 05JAN2024.pdf PDF
Attachment F - YUMA Annex G CLS 408 Sand Removal 05JAN2024.pdf PDF
Attachment J- Yuma Pricing Matrix CLIN Structure-W5168W-23-R-0004-4JAN2024.xlsx XLSX spreadsheet
YUMA Proving Ground Solicitation QA-W5168W-23-R-0004- 05JAN2024-Final.xlsx XLSX spreadsheet
W5168W-23-R-0004-Amendment0002-1NOV2023.pdf PDF
YPG Question and Answer from Draft RFP W5168W 23 R 0004 15JUNE2023.xlsx XLSX spreadsheet
TE 46 Builder Component Catalog.pdf PDF
TE 01 Real Property Inventory.xlsx XLSX spreadsheet
TE 36 Excavation Permit Form.pdf PDF
TE 15 Grounds Inventory.xlsx XLSX spreadsheet
TE 35 Pavement Sweeping Areas.xlsx XLSX spreadsheet
TE 02 Workload History CY20.xlsx XLSX spreadsheet
TE 14 - Ground Water Wells.xlsx XLSX spreadsheet
TE 30 Wash Racks.xlsx XLSX spreadsheet
TE 42 Incidental Property.xlsx XLSX spreadsheet
TE 0 Table of Contents.xlsx XLSX spreadsheet
TE 39 PWO Format.xlsx XLSX spreadsheet
TE 40 GFEBS Transaction Codes.xlsx XLSX spreadsheet
TE 38 Preventative Maintenance Checklist.xlsx XLSX spreadsheet
Attachment I3 - Government Furnished Property Provided Under FAR Clause 52.245-2.xlsx XLSX spreadsheet
Attachment Q - Davis-Bacon Residential.pdf PDF
Attachment F - YUMA Annex G CLS 408 Sand Removal 11-23-21.docx DOCX document
Attachment K - Staffing Matrix.xlsx XLSX spreadsheet
TE 28 Spill Prevention Control and Countermeasures Plan.pdf PDF
TE 24 Septic Tank and locations.xlsx XLSX spreadsheet
Yuma Pricing Matrix CLIN Structure as of 21 Jun 23.xlsx XLSX spreadsheet
TE 27 YPG Installation Design Guide.pdf PDF
TE 47 ATEC - Mission Non-Real Property.pdf PDF
TE 26 ArMA Field Requirments.pdf PDF
TE 34 - Control Devices and Meters.xlsx XLSX spreadsheet
TE 02 Workload History CY19.xlsx XLSX spreadsheet
TE 23 WaterLess Urinals.xlsx XLSX spreadsheet
TE 16 - Roads and Test Courses.xlsx XLSX spreadsheet
TE 13 - Water Pumping Booster Stataion.xlsx XLSX spreadsheet
TE 11 - Boiler Size.xlsx XLSX spreadsheet
TE 07 - Electrical Substations.xlsx XLSX spreadsheet
TE 03 Performance Requirement Summary.docx DOCX document
Attachment I2 - Government Furnished Property Provided Under FAR Clause 52.245-1.xlsx XLSX spreadsheet
Attachment B - YUMA Annex B CLS 400 Facilities Maintenance Instructions.docx DOCX document
Attachment A-YUMA PWS Annex A 08 AUG 2023.docx DOCX document
Attachment T - Past Performance Questionnaire.docx DOCX document
Attachment H - YUMA Annex J CLS 420 Facilities Maintenance Horizontal 11-23-21.docx DOCX document
Attachment C - YUMA Annex C CLS 200 Unaccompanied Management 11-23-21.docx DOCX document
YPG Attachment List-8-8-2023.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 12:00 PM local time 27 Oct 2023

A

X B

C

D

EX

X

G

F

94 - 107

H 108 - 113 samuel.j .colton.civ@army .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

1 113

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W5168W 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

SAMUEL J. COLTON 210-808-6488

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 44

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

45 - 46

47 - 51 K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror)

X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

52 - 90

PART II - CO NTRACT CLAUSES

FDO FSH IRC

2371 INFANTRY POST RD, BLDG 602

FORT SAM HOUSTON TX 78234

210-221-1191

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

91 - 93

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

23 Aug 2023

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W5168W23R0004

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 10 Months Program Management

FFP

This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment

A. Refer to the Pricing Matrix (Attachment J), to confirm monthly pricing.

FOB: Destination

PSC CD: S216

NET AMT

0002 10 Months CLS 200 Unaccompanied Personnel Housing

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing

(UPH) Management Operation IAW the terms and conditions of the PWS and

Attachment C, Annex C CLS 200 Unaccompanied Personnel Housing

Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

0003 10 Months CLS 403 Solid Waste Management

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 403 Solid Waste Management IAW the terms and conditions of the PWS and Attachment D, CLS 403 Solid Waste

Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

0004 10 Months CLS 404 Grounds Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment E, CLS 404 Grounds Maintenance.

Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

0005 10 Months CLS 408 Pavement Clearance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment F, CLS 408

Pavement Clearance. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated OWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing. PWO Mark-Up

Rate:____________

0006 10 Months CLS 411 Preventative Maintenance Vert

FFP

Preventative Maintenance Vertical in accordance with Annex H, CLS 411

Facilities Maintenance Vertical.

0007 10 Months CLS 411 Facilities Maintenance Vertical

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment G, CLS 411 Facility

Maintenance Vertical. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

0008 10 Months Optional Facilities Maintenance Vertical

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the

Pricing Matrix, to confirm pricing and the applicable banding structure.

0009 10 Months Optional Facilities Maintenance Vertical

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X007 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

0010 10 Months ATEC Property Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions required for the maintenance and repair of Army Training and Evaluation Command (ATEC) non-real property in accordance with PWS

Section 2.2.3.2 and 2.2.4. Please refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

0011 10 Months CLS 420 Preventative Maintenance

FFP

Preventative Maintenance in accordance with Annex J, CLS 420 Facilities

Maintenance Horizontal.

0012 10 Months CLS 420 Facilities Maintenance Horiz.

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance Horizontal, IAW the terms and conditions of the PWS and Attachment H, CLS 420 Facility

Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

0013 10 Months Optional Facilities Maintenance Horiz

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the

Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

0014 10 Months Optional Facilities Maintenance Horiz

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X011 for work performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

0015 10 Months CLS 510 Pest Management Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment I, CLS 510 Pest Management. Refer to the

Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

0016 10 Months Project Work Orders

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section

2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

0017 10 Months ATEC Project Work Orders (PWO)

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in ATEC Project Work Orders (PWO) as specified in PWS

Section 2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

0018 2 Months Phase in (60 Days)

FFP

Contractor shall perform 60-days Phase-In activities in accordance with PWS

Section 2.1.2.1 and the Contractor approved Phase-In Plan. Refer to the Pricing

Matrix (Attachment J), to confirm pricing and the applicable banding structure.

1001 12 Months OPTION Program Management

FFP

This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment

A. Refer to the Pricing Matrix (Attachment J), to confirm monthly pricing.

1002 12 Months OPTION CLS 200 Unaccompanied Personnel Housing

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing

(UPH) Management Operation IAW the terms and conditions of the PWS and

Attachment C, Annex C CLS 200 Unaccompanied Personnel Housing

Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

1003 12 Months OPTION CLS 403 Solid Waste Management

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 403 Solid Waste Management IAW the terms and conditions of the PWS and Attachment D, CLS 403 Solid Waste

1004 12 Months OPTION CLS 404 Grounds Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment E, CLS 404 Grounds Maintenance.

Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

1005 12 Months OPTION CLS 408 Pavement Clearance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment F, CLS 408

Pavement Clearance. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated OWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing. PWO Mark-Up

Rate:____________

1006 12 Months OPTION CLS 411 Preventative Maintenance Vert

FFP

Preventative Maintenance Vertical in accordance with Annex H, CLS 411

Facilities Maintenance Vertical.

1007 12 Months OPTION CLS 411 Facilities Maintenance Vertical

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment G, CLS 411 Facility

Maintenance Vertical. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

1008 12 Months OPTION Optional Facilities Maintenance Vertical

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the

Pricing Matrix, to confirm pricing and the applicable banding structure.

1009 12 Months OPTION Optional Facilities Maintenance Vertical

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X007 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

1010 12 Months OPTION ATEC Property Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions required for the maintenance and repair of Army Training and Evaluation Command (ATEC) non-real property in accordance with PWS

Section 2.2.3.2 and 2.2.4. Please refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

1011 12 Months OPTION CLS 420 Preventative Facilities Maintent

FFP

Preventative Maintenance in accordance with Annex J, CLS 420 Facilities

Maintenance Horizontal.

1012 12 Months OPTION CLS 420 Facilities Maintenance Horiz.

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance Horizontal, IAW the terms and conditions of the PWS and Attachment H, CLS 420 Facility

Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

1013 12 Months OPTION Optional Facilities Maintenance Horiz

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the

Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

1014 12 Months OPTION Optional Facilities Maintenance Horiz

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X011 for work performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

1015 12 Months OPTION CLS 510 Pest Management Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment I, CLS 510 Pest Management. Refer to the

Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

1016 12 Months OPTION Project Work Orders

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section

2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

1017 12 Months OPTION ATEC Project Work Orders (PWO)

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in ATEC Project Work Orders (PWO) as specified in PWS

Section 2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

2001 12 Months OPTION Program Management

FFP

This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment

A. Refer to the Pricing Matrix (Attachment J), to confirm monthly pricing.

2002 12 Months OPTION CLS 200 Unaccompanied Personnel Housing

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing

(UPH) Management Operation IAW the terms and conditions of the PWS and

Attachment C, Annex C CLS 200 Unaccompanied Personnel Housing

Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

2003 12 Months OPTION CLS 403 Solid Waste Management

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 403 Solid Waste Management IAW the terms and conditions of the PWS and Attachment D, CLS 403 Solid Waste

2004 12 Months OPTION CLS 404 Grounds Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment E, CLS 404 Grounds Maintenance.

Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

2005 12 Months OPTION CLS 408 Pavement Clearance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment F, CLS 408

Pavement Clearance. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated OWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing. PWO Mark-Up

Rate:____________

2006 12 Months OPTION CLS 411 Preventative Maintenance Vert

FFP

Preventative Maintenance Vertical in accordance with Annex H, CLS 411

Facilities Maintenance Vertical.

2007 12 Months OPTION CLS 411 Facilities Maintenance Vertical

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment G, CLS 411 Facility

Maintenance Vertical. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

2008 12 Months OPTION Optional Facilities Maintenance Vertical

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the

Pricing Matrix, to confirm pricing and the applicable banding structure.

2009 12 Months OPTION Optional Facilities Maintenance Vertical

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X007 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

2010 12 Months OPTION ATEC Property Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions required for the maintenance and repair of Army Training and Evaluation Command (ATEC) non-real property in accordance with PWS

Section 2.2.3.2 and 2.2.4. Please refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

2011 12 Months OPTION CLS 420 Preventative Facilities Maint

FFP

Preventative Maintenance in accordance with Annex J, CLS 420 Facilities

Maintenance Horizontal.

2012 12 Months OPTION CLS 420 Facilities Maintenance Horiz.

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance Horizontal, IAW the terms and conditions of the PWS and Attachment H, CLS 420 Facility

Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

2013 12 Months OPTION Optional Facilities Maintenance Horiz

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the

Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

2014 12 Months OPTION Optional Facilities Maintenance Horiz

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X011 for work performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

2015 12 Months OPTION CLS 510 Pest Management Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment I, CLS 510 Pest Management. Refer to the

Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

2016 12 Months OPTION Project Work Orders

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section

2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

2017 12 Months OPTION ATEC Project Work Orders (PWO)

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in ATEC Project Work Orders (PWO) as specified in PWS

Section 2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

3001 12 Months OPTION Program Management

FFP

This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment

A. Refer to the Pricing Matrix (Attachment J), to confirm monthly pricing.

3002 12 Months OPTION CLS 200 Unaccompanied Personnel Housing

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing

(UPH) Management Operation IAW the terms and conditions of the PWS and

Attachment C, Annex C CLS 200 Unaccompanied Personnel Housing

Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

3003 12 Months OPTION CLS 403 Solid Waste Management

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 403 Solid Waste Management IAW the terms and conditions of the PWS and Attachment D, CLS 403 Solid Waste

3004 12 Months OPTION CLS 404 Grounds Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment E, CLS 404 Grounds Maintenance.

Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

3005 12 Months OPTION CLS 408 Pavement Clearance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment F, CLS 408

Pavement Clearance. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated OWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing. PWO Mark-Up

Rate:____________

3006 12 Months OPTION CLS 411 Preventative Maintenance Vert

FFP

Preventative Maintenance Vertical in accordance with Annex H, CLS 411

Facilities Maintenance Vertical.

3007 12 Months OPTION CLS 411 Facilities Maintenance Vertical

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment G, CLS 411 Facility

Maintenance Vertical. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

3008 12 Months OPTION Optional Facilities Maintenance Vertical

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the

Pricing Matrix, to confirm pricing and the applicable banding structure.

3009 12 Months OPTION Optional Facilities Maintenance Vertical

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X007 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

3010 12 Months OPTION ATEC Property Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions required for the maintenance and repair of Army Training and Evaluation Command (ATEC) non-real property in accordance with PWS

Section 2.2.3.2 and 2.2.4. Please refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

3011 12 Months OPTION CLS 420 Preventative Facilities Maint

FFP

Preventative Maintenance in accordance with Annex J, CLS 420 Facilities

Maintenance Horizontal.

3012 12 Months OPTION CLS 420 Facilities Maintenance Horiz.

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance Horizontal, IAW the terms and conditions of the PWS and Attachment H, CLS 420 Facility

Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

3013 12 Months OPTION Optional Facilities Maintenance Horiz

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the

Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

3014 12 Months OPTION Optional Facilities Maintenance Horiz

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X011 for work performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

3015 12 Months OPTION CLS 510 Pest Management Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment I, CLS 510 Pest Management. Refer to the

Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

3016 12 Months OPTION Project Work Orders

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section

2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

3017 12 Months OPTION ATEC Project Work Orders (PWO)

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in ATEC Project Work Orders (PWO) as specified in PWS

Section 2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

4001 12 Months OPTION Program Management

FFP

This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment

A. Refer to the Pricing Matrix (Attachment J), to confirm monthly pricing.

4002 12 Months OPTION CLS 200 Unaccompanied Personnel Housing

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing

(UPH) Management Operation IAW the terms and conditions of the PWS and

Attachment C, Annex C CLS 200 Unaccompanied Personnel Housing

Management. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

4003 12 Months OPTION CLS 403 Solid Waste Management

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 403 Solid Waste Management IAW the terms and conditions of the PWS and Attachment D, CLS 403 Solid Waste

4004 12 Months OPTION CLS 404 Grounds Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment E, CLS 404 Grounds Maintenance.

Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

4005 12 Months OPTION CLS 408 Pavement Clearance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment F, CLS 408

Pavement Clearance. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated OWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing. PWO Mark-Up

Rate:____________

4006 12 Months OPTION CLS 411 Preventative Maintenance Vert

FFP

Preventative Maintenance Vertical in accordance with Annex H, CLS 411

Facilities Maintenance Vertical.

4007 12 Months OPTION CLS 411 Facilities Maintenance Vertical

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment G, CLS 411 Facility

Maintenance Vertical. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

4008 12 Months OPTION Optional Facilities Maintenance Vertical

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the

Pricing Matrix, to confirm pricing and the applicable banding structure.

4009 12 Months OPTION Optional Facilities Maintenance Vertical

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X007 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

4010 12 Months OPTION ATEC Property Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions required for the maintenance and repair of Army Training and Evaluation Command (ATEC) non-real property in accordance with PWS

Section 2.2.3.2 and 2.2.4. Please refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

4011 12 Months OPTION CLS 420 Preventative Facilities Maint

FFP

Preventative Maintenance in accordance with Annex J, CLS 420 Facilities

Maintenance Horizontal.

4012 12 Months OPTION CLS 420 Facilities Maintenance Horiz.

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance Horizontal, IAW the terms and conditions of the PWS and Attachment H, CLS 420 Facility

Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

4013 12 Months OPTION Optional Facilities Maintenance Horiz

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the

Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

4014 12 Months OPTION Optional Facilities Maintenance Horiz

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X011 for work performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

4015 12 Months OPTION CLS 510 Pest Management Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment I, CLS 510 Pest Management. Refer to the

Pricing Matrix (Attachment J), to confirm pricing and the applicable banding structure.

4016 12 Months OPTION Project Work Orders

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section

2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

4017 12 Months OPTION ATEC Project Work Orders (PWO)

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in ATEC Project Work Orders (PWO) as specified in PWS

Section 2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs that is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

0006 N/A N/A N/A Government

0007 Destination Government Destination Government

0008 Destination Government Destination Government

0009 Destination Government Destination Government

0010 Destination Government Destination Government

0011 N/A N/A N/A Government

0012 Destination Government Destination Government

0013 Destination Government Destination Government

0014 Destination Government Destination Government

0015 Destination Government Destination Government

0016 Destination Government Destination Government

0017 Destination Government Destination Government

0018 Destination Government Destination Government

1001 Destination Government Destination Government

1002 Destination Government Destination Government

1003 Destination Government Destination Government

1004 Destination Government Destination Government

1005 Destination Government Destination Government

1006 N/A N/A N/A Government

1007 Destination Government Destination Government

1008 Destination Government Destination Government

1009 Destination Government Destination Government

1010 Destination Government Destination Government

1011 N/A N/A N/A Government

1012 Destination Government Destination Government

1013 Destination Government Destination Government

1014 Destination Government Destination Government

1015 Destination Government Destination Government

1016 Destination Government Destination Government

1017 Destination Government Destination Government

2001 Destination Government Destination Government

2002 Destination Government Destination Government

2003 Destination Government Destination Government

2004 Destination Government Destination Government

2005 Destination Government Destination Government

2006 N/A N/A N/A Government

2007 Destination Government Destination Government

2008 Destination Government Destination Government

2009 Destination Government Destination Government

2010 Destination Government Destination Government

2011 N/A N/A N/A Government

2012 Destination Government Destination Government

2013 Destination Government Destination Government

2014 Destination Government Destination Government

2015 Destination Government Destination Government

2016 Destination Government Destination Government

2017 Destination Government Destination Government

3001 Destination Government Destination Government

3002 Destination Government Destination Government

3003 Destination Government Destination Government

3004 Destination Government Destination Government

3005 Destination Government Destination Government

3006 N/A N/A N/A Government

3007 Destination Government Destination Government

3008 Destination Government Destination Government

3009 Destination Government Destination Government

3010 Destination Government Destination Government

3011 N/A N/A N/A Government

3012 Destination Government Destination Government

3013 Destination Government Destination Government

3014 Destination Government Destination Government

3015 Destination Government Destination Government

3016 Destination Government Destination Government

3017 Destination Government Destination Government

4001 Destination Government Destination Government

4002 Destination Government Destination Government

4003 Destination Government Destination Government

4004 Destination Government Destination Government

4005 Destination Government Destination Government

4006 N/A N/A N/A Government

4007 Destination Government Destination Government

4008 Destination Government Destination Government

4009 Destination Government Destination Government

4010 Destination Government Destination Government

4011 N/A N/A N/A Government

4012 Destination Government Destination Government

4013 Destination Government Destination Government

4014 Destination Government Destination Government

4015 Destination Government Destination Government

4016 Destination Government Destination Government

4017 Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 14-FEB-2024 TO

13-DEC-2024

N/A US ARMY GARRISON

US ARMY GARRISON

2100 RM 301 C. ST BLDG 402

YUMA AZ 85365

W58BKP

0002 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0012 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0013 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0014 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0015 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0016 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0017 POP 14-FEB-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0018 POP 14-DEC-2023 TO

13-FEB-2024

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 14-DEC-2024 TO

13-DEC-2025

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1007 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1008 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1009 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1010 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1011 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1012 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1013 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1014 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1015 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1016 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

1017 POP 14-DEC-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 14-DEC-2025 TO

13-DEC-2026

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 14-DEC-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 14-DEC-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 14-DEC-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 14-DEC-2025 TO

N/A (SAME AS PREVIOUS LOCATION)

2006…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .