TE 03 Performance Requirement Summary.docx

DOCX document 21 KB Posted

Attached to
BASE OPERATION SUPPORT SERVICES (BASOPS) FOR YUMA PROVING GROUND (YPG)
Solicitation number
W5168W23R0004
Issued by

About this file

This document outlines technical performance requirements for base operation support services at Yuma Proving Ground. Key requirements include completing emergency DMOs within 24 hours with no defects allowed, priority 2 DMOs within 7 days with no more than 2 defects, and priority 3 DMOs within 30 days with no more than 8% defects. PMO tasks must be completed on schedule with no defects, and PWOs must be delivered on time with no more than 1 defect. DMOs and PMOs must be entered into GFEBS within 7 days with no more than 5 defects. A PMO program in GFEBS is required within 90 days of contract start with 100% compliance. Defects are subject to deducts from $100 to $1,500 depending on requirement. The solicitation is for the Department of the Army for base operation support services at Yuma Proving Ground, Arizona.

View the file

Other files

File Type Posted
Attachment K - Staffing Matrix-27DEC2023-W5168W-23-R-0004-YPG.xlsx XLSX spreadsheet
TE_50_Landfill_Permit-05JAN2024.pdf PDF
TE_15_Grounds_Inventory_05JAN2024.xlsx XLSX spreadsheet
Attachment G - YUMA Annex H CLS 411 Facilities Maintenance Vertical-04JAN2024.pdf PDF
Attachment V-W5168W-23-R-0004-YPG-ServiceContract-WageDetermination.pdf PDF
Attachment_Q_Davis_Bacon_Residential_29NOV2023.pdf PDF
Attachment D - YUMA Annex E CLS 403 Waste Management 05JAN2024.pdf PDF
Attachment F - YUMA Annex G CLS 408 Sand Removal 05JAN2024.pdf PDF
Attachment J- Yuma Pricing Matrix CLIN Structure-W5168W-23-R-0004-4JAN2024.xlsx XLSX spreadsheet
YUMA Proving Ground Solicitation QA-W5168W-23-R-0004- 05JAN2024-Final.xlsx XLSX spreadsheet
W5168W-23-R-0004-Amendment0002-1NOV2023.pdf PDF
YPG Question and Answer from Draft RFP W5168W 23 R 0004 15JUNE2023.xlsx XLSX spreadsheet
TE 46 Builder Component Catalog.pdf PDF
TE 01 Real Property Inventory.xlsx XLSX spreadsheet
TE 36 Excavation Permit Form.pdf PDF
TE 15 Grounds Inventory.xlsx XLSX spreadsheet
TE 35 Pavement Sweeping Areas.xlsx XLSX spreadsheet
TE 02 Workload History CY20.xlsx XLSX spreadsheet
TE 14 - Ground Water Wells.xlsx XLSX spreadsheet
TE 30 Wash Racks.xlsx XLSX spreadsheet
TE 42 Incidental Property.xlsx XLSX spreadsheet
TE 0 Table of Contents.xlsx XLSX spreadsheet
TE 39 PWO Format.xlsx XLSX spreadsheet
TE 40 GFEBS Transaction Codes.xlsx XLSX spreadsheet
TE 38 Preventative Maintenance Checklist.xlsx XLSX spreadsheet
Attachment I3 - Government Furnished Property Provided Under FAR Clause 52.245-2.xlsx XLSX spreadsheet
Attachment Q - Davis-Bacon Residential.pdf PDF
Attachment F - YUMA Annex G CLS 408 Sand Removal 11-23-21.docx DOCX document
Attachment K - Staffing Matrix.xlsx XLSX spreadsheet
TE 28 Spill Prevention Control and Countermeasures Plan.pdf PDF
TE 24 Septic Tank and locations.xlsx XLSX spreadsheet
TE 31 Disposal of Hazardous Material Combined.pdf PDF
TE 43 Builder Inventory Guide.pdf PDF
TE 02 Workload History CY22.xlsx XLSX spreadsheet
TE 02 Workload History CY21 (1).xlsx XLSX spreadsheet
TE 33 Uninterrupted Power Supply.xlsx XLSX spreadsheet
TE 32 Heavy Equipment List.xlsx XLSX spreadsheet
TE 09 - ICE Monthly Visible Emissions Checklist.xlsx XLSX spreadsheet
TE 21 GSA Fleet Vehicles.xlsx XLSX spreadsheet
TE 10.1 - Boiler Tune-Up Form.xlsx XLSX spreadsheet
TE 08 - ICE Maintenance CK List.xlsx XLSX spreadsheet
TE 04 - Contractor Occupied Facilities.xlsx XLSX spreadsheet
TE 49 ARC Equipment and Containers.xlsx XLSX spreadsheet
TE 37 PWO-IJO History.xlsx XLSX spreadsheet
Attachment M - Collective Bargaining Agreement 2021.2024 fully executed 8.10.2021.pdf PDF
Attachment N - Davis-Bacon Heavy.pdf PDF
Attachment P - Davis-Bacon Highway.pdf PDF
Attachment O - Davis-Bacon Building.pdf PDF
Attachment G - YUMA Annex H CLS 411 Facilities Maintenance Vertical 11-23-21.docx DOCX document
Attachment W - YPG Site Visit Question and Answer W5168W-23-R-0004-15JUNE2023.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 3

Performance Requirements Summary (PRS) Matrix

Required Services/ Performance Object

PWS

Paragraph Number

Performance Standard Maximum Allowable Degree of Deviation from Requirement (AQL Level)

Method Of Surveillance

Deduct Schedule

DMO

(Service Order) Receipt and Entry

2.2.3
Assigns appropriate priority level
No more than one (1) defect per month allowed.
Random sample
$500 per defect above AQL
Priority 1 DMO
2.2.3.2
Complete 100% of Emergency DMOs within twenty-four

(24) hours

No more than zero (0) defects per month.
100%

Inspection $1,500 per defect above AQL

Priority 2 DMO
2.2.3.2
Complete all Priority 2 DMOs within seven (7)

calendar days

No more than two (2) defects per month allowed
Random Sample
$1,000 per defect above AQL
Priority 3 DMO
2.2.3.2
Complete all Priority 3 DMOs within thirty (30) calendar days
No more than eight percent (8%)

defects per month allowed

Random Sample
$100 per defect above AQL
PMO tasks
2.2.4
Execute all PMO tasks scheduled for the month
No more than zero (0) defects per month allowed
Random Sample
$1,000 per defect above AQL
PWO’s
2.2.6
Complete PWO’s within the scheduled delivery date
No more than one (1) defect allowed per month
100%

Inspection $500 per defect above AQL

Workload Management in GFEBS
2.2.3.4 for DMOs

2.2.4 for PMOs TECO DMOs and PMOs in GFEBS within seven (7) calendar days

No more than five (5) defects allowed per month
Random Sample
$500 per defect above AQL

GFEBS PMO

Program

2.2.4.1
Develop and complete PMO Program in GFEBS
NLT ninety (90) days from contract start date
100%

Inspection $250 per day above AQL