KNMD250010-CHILLER COILS B3385-Item Description.docx

DOCX document 14 KB Posted

Attached to
RFQ: SUP KNMD250010 REPLACE CHILLER COILS B3385 Federal contract opportunity
Solicitation number
W50SLF25QA004
Issued by
Department of the Army National Guard

About this file

The document is a Request for Quote (RFQ) issued by the Hawaii Air National Guard for the procurement of new condenser coils for two Trane CGAM 60-ton chillers located at Building 3385, JBPHH, HI. The solicitation requires four total coils (two per chiller), with specific technical specifications including aluminum fins, 3/8 x .020 tube, 68" FH x 127" FL, 2 rows, 16 FPI, 16 ga. galvanized casing, and Heresite corrosion coating.

The RFQ specifies an estimated delivery timeline of 5-6 weeks after receipt of order, with quotations due by 1 August 2025 at 1200 EST to Emma Newbegin via email. Contractors must provide a minimum one-year parts unit warranty and ensure pricing remains valid for 60 days. The solicitation is pending funding, and any questions must be submitted by 24 July 2025 at 1200 EST. The procurement is being conducted by the Department of the Army National Guard, with the solicitation number W50SLF25QA004.

View the file

Other files for this federal contract opportunity

Other files attached to RFQ: SUP KNMD250010 REPLACE CHILLER COILS B3385, newest first.
File Type Posted
Chiller Photos - KNMD250010-REPLACE CHILLER COILS B3385.docx DOCX document
Drawings - KNMD250010-REPLACE CHILLER COILS B3385.pdf PDF
Solicitation - W50SLF25QA004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Description Corrosion Coated Condenser Coils

New Condenser Coils for two (2) Trane CGAM 60-ton chillers (Trane CGAM060F / U13F36141 & U13F36142)

Quantity: 4 total (2 each per chiller)

Trane Model No.: CGAM 060F 2J02 AXD2 A1B1 A1AX XA1D 1A2A 1A8B XBXA 5A1D XXXL XX (High Efficiency)

Material: Condenser, AL Fin, 3/8 x .020 Tube, 68" FH x 127" FL, 2 Rows, 16 FPI (no Microchannel). *** 16 Ga. Galvanized Casing *** .006 Aluminum Fin.

Corrosion Coating-Condenser Coil: Heresite (Dip N' Bake p413C) (e.g. RAHN Industries or )

Parts Warranty Minimum (1 Years)

Scope: The contractor shall furnish four (4) new corrosion coated condenser coils for the two (2) air-cooled chiller units located at Building 3385, JBPHH, HI (Trane CGAM060F / U13F36141 & U13F36142). Each chiller has two (2) coils and uses R-410a for a total Building capacity of 356kW (see attached Drawings & Photos).

Estimated Required Delivery Date: 5-6 weeks after receipt of order (ARO)