RFIs for Solicitation W50S9J-20-B-0005 – Bldg 111 Renovation Project
1) Is panel C fed from Panel B or the MDP?
It is fed from the existing panel “A”.
2) Does the EC need to provide the breaker for the new panel?
Yes.
3) Are there any specs available for the existing gear?
Working on specs, I may need to take photos.
4) Who provides the UPS system?
The UPS is government provided, government installed item
5) I need clarification on note 15 of the electrical plan. What is the disconnect for?
The disconnect and note 15 is being removed from the drawing
6) Is the EC responsible for pulling and terminating Data cables?
No. The EC will provide faceplate, box, and conduit from box to stubbed up outside of, and at the top of the new gypsum board wall.
7) Is the intent of note 8 on the Electrical Drawing to replace existing Wall packs with new LED's?
Yes, the intent was to replace the wallpacks, however this is being removed from the scope of project.