This document is a Questions and Answers (Q&A) file for federal contract W50S9H26QA043, addressing an airfield liquid de-icing system to be mounted on a skid and installed in a government-owned dump body.
Host Vehicle and System Configuration: The system will be mounted on a single-axle dump body measuring 82 inches wide by 118 inches long, with a 33,000 lbs. GVWR and 20,100 lbs. payload capacity. The skid will be secured using a lock-in tailgate and large ratchet straps, with no drilling, bolting, or welding permitted on the dump body. The self-loading leg system must support the completely drained skid, stand independently for extended seasonal storage on any level surface, and fold against the skid during operation. No stamped engineering, third-party certification, or proof-load testing beyond DOT cargo-securement requirements is required.
Tank and Liquid Specifications: The system will use potassium acetate de-icing liquid in a 900-gallon polyethylene tank representing minimum usable working capacity below overflow. Tank features include an overhead dump hose fill port with minimum 1.5-inch connection located within one foot of the tank bottom, low-point tank drain, clear tube level indicator, and top fill cover. Spray boom will be fixed configuration with 30-33 feet total width achieving 30-foot spray-pattern coverage at application rates of 40-50 gallons per mile at vehicle speeds of 25-30 mph, with independently adjustable nozzles and uniform spray patterns. The system requires a 100-foot manual hose reel with 5/8-inch inside diameter hose and garden hose connection.
Power and Controls: A gasoline-powered engine is required with 0-degree Fahrenheit cold-start capability and minimum one-hour operating runtime between refueling. The power plant must start and stop from an in-cab controller. The 12-volt electrical system requires no modifications to dashboard, firewall penetrations, direct battery connections, or auxiliary batteries. Application control requires only a cumulative onboard totalizer; GPS-based speed compensation, closed-loop flow meter control, or downloadable electronic records are not required.
Acceptance Testing and Installation: Required acceptance tests include tank and plumbing leak tests, pump flow and pressure tests, flow-meter calibration, spray-pattern and coverage tests, application-rate accuracy tests, loading and unloading demonstrations, and tie-down inspection. Volk Field will provide both indoor and outdoor work areas, water supply, forklift support, and access Monday through Friday, 0730-1500 hours, with escort for delivery. Training is required for seven personnel in one combined onsite operator and maintenance session supported by physical and digital manuals. The contractor must provide a one-year comprehensive warranty with 24-hour response time, including contractor travel and freight, covering all purchased components including pumps, flow meters, controllers, engines, valves, nozzles, and hoses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S9H26QA043 Skid‐Mounted Airϐield Liquid De‐Icing System
QUESTIONS & ANSWERS
Host Vehicle and Dump Body
The photograph package appears to show multiple dump-body con igurations. Is the footprint provided in the spec sheet the maximum available lat space available?
Yes – Single axel 82” Wide x 118” Long
Please provide the designated vehicles:
o GVWR – 33k lbs.
o Dump-body payload rating – 20,100 lbs. capacity
Please identify the approved methods for attaching the loading guides, trunnion-latch receivers, and tie-down points to the government-owned dump body. Is drilling, bolting, or welding to the dump body permitted?
Lock-in tailgate & large ratchet straps
Self‐Loading and Securement System
4. Must the self-loading leg system support the skid with the tank full, partially full, or completely drained? Completely Drained
5. Please con irm the intended self-loading procedure, including:
o Whether the dump body may be tilted to pick up and unload the skid - No o Whether loading and unloading must be performed by one person - No o Whether the system must stand independently for extended seasonal storage
- Yes o The anticipated storage surface, such as level concrete, asphalt, gravel, or uneven ground – Any level surface o Whether the loading legs must remain attached, fold against the skid, or be removable and stored separately during operation. Fold against the skid
6. Does the Government require stamped engineering, third-party certi ication, proof-load testing, or documented structural calculations for the loading legs, trunnion latches, skid frame, or DOT-rated tie-down system? Please identify any required design loads or certi ication standards beyond applicable DOT cargo-securement requirements. No.
Tank, Liquid, and Materials
7. Please identify the liquid de-icing product that will be used, including:
o Product name or chemical composition – Potassium Acetate
8. Does the 900-gallon requirement refer to nominal tank capacity or minimum usable working capacity below the over low and required expansion space? Minimum usable working capacity
9. The speci ications require the structural frame, skid, and supports to be stainless steel but do not expressly identify the tank material. Please con irm: Poly tank
Whether a chemical-compatible polyethylene tank is acceptable Yes
Whether internal baf le balls or another removable internal anti-slosh system are acceptable Not needed
Whether a fabricated stainless-steel tank is required No, Poly tank.
Whether a speci ic stainless inish, weld-cleaning process, pickling, or passivation is required No
10. Is there a maximum allowable empty skid weight, loaded skid weight, or required center-of-gravity location beyond the stated requirement to remain within the host vehicle’s GVWR and axle ratings? Will a certi ied loaded axle-weight ticket be required for acceptance? No
11. Please identify any required or preferred:
Tank ill-connection size and type Overhead dump hose ill port
Available ill-system connection and low rate Minimum 1 ½”, ill connection located within 1 foot of bottom of tank.
Vent con iguration N/A
Drain connection Low point tank drain
Tank level indicator Clear tube
Cleanout or inspection opening Top ill cover
Over low-routing location N/A
Spray Performance and Plumbing
12. Please provide the required operating performance, including:
Minimum and maximum application rate 40 to 50 gallons per mile
Preferred units, such as gallons per lane-mile or gallons per square foot. Gallons per lane-mile
Maximum vehicle speed during application 25-30mph
Required low-rate range 40-50 gallons per mile
Required application accuracy 4-6” per nozzle
Intended widths of the left, center, and right zones 30-33 feet total
Whether the full 30-foot coverage must be achieved at the maximum application rate and vehicle speed yes
Any required spray-pattern uniformity or overlap criteria. Uniformity
13. Please clarify the desired spray-boom con iguration:
Fixed, folding, retractable, removable, or contractor-selected. Fixed
Maximum allowable transport width inside overall width of truck
Required boom height or adjustment range N/A
Whether the 30-foot requirement refers to the physical boom width or the resulting spray-pattern width. Spray Pattern Wideth
Whether any individual nozzles must be independently adjustable or shut off.
Independently Adjustable
Whether the boom must include breakaway protection No
14. Please provide any minimum requirements for the hose reel and utility spray wand, including:
Hose length 100 Feet
Hose inside diameter 5/8”
Manual, or spring hose reel. Manual
Adjustable spray pattern No, garden hose connection
Power, Controls, and Electrical Integration
15. Although the speci ications allow an electric or fuel-powered motor, please con irm:
Whether gasoline and diesel engines are both acceptable. Gasoline
Whether there are air ield restrictions on fuel type, fuel-tank capacity, emissions, or engine operation No
Whether the power plant must be started and stopped from the in-cab controller Yes
The required minimum cold-start temperature 0 degrees F
Any minimum operating-runtime requirement between refueling 1 Hour
16. Please provide the host vehicle’s electrical voltage (12V) and available accessory current. Please also identify any restrictions regarding:
Cab-controller mounting location No
Drilling into the dashboard or cab No
Firewall penetrations No
Direct battery connections No
Installation of an auxiliary battery No
17. Please clarify the required application-control functions:
Is automatic ground-speed-compensated rate control required, or is there a GPS module we can tie into? No
Will GPS-based vehicle-speed input be acceptable? No
Is closed-loop control using the inline low meter required? No
Is a cumulative onboard totalizer suf icient to “record” application volumes? Yes
Are downloadable, time-stamped, GPS-referenced, or route-speci ic application records required? No
If electronic records are required, what ile format and data-retention period are expected? N/A
Delivery, Installation, Testing, and Acceptance
18. Will Volk Field provide the speci ied de-icing liquid for inal calibration and acceptance testing? If not, may water or another substitute test luid be used for functional testing and calibration?
Yes – Water would be acceptable
19. Please provide the required acceptance-test criteria, including any required:
Tank-capacity veri ication No
Tank or plumbing leak test Yes
Pump low and pressure test Yes
Flow-meter calibration Yes
Spray-pattern or coverage test Yes
Application-rate accuracy test Yes
Loading and unloading demonstration Yes
Tie-down or latch inspection Yes
20. Please identify the installation conditions and Government-furnished support available at Volk Field, including:
Indoor or outdoor work area Yes both
Water or test- luid supply. Water
Forklift Yes
Permitted workdays and working hours M-F 0730-1500
Base-access, badging, security, insurance, or vehicle-inspection requirements Escort will take place for delivery.
21. Please identify the anticipated number of personnel requiring training and any minimum training duration. May the contractor provide one combined onsite operator and maintenance session, supported by the required physical and digital manuals? 7 personnel, yes one combined session is preferred.
Documentation, Warranty, and Additional Standards
22. For the one-year comprehensive warranty, please clarify:
Required response time after noti ication 24 hours
Whether contractor travel and freight must be included Yes
Whether pumps, low meters, controllers, engines, valves, nozzles, hoses, and other purchased components must all be covered by the contractor’s warranty Yes
23. Please identify any additional FAA, Department of the Air Force, Air National Guard, Wisconsin DOT, military, environmental, electrical, safety, or air ield-equipment standards that apply but are not expressly listed in the solicitation. N/A