B.01.Combo Question-Answer 2.pdf
PDF 221 KB Posted
- Attached to
- 115th Fighter Wing Temporary Modular/Mobile Office Facilities Federal contract opportunity
- Solicitation number
- W50S9F-21-Q-0001
- Issued by
- Department of the Army National Guard
About this file
This document outlines a federal solicitation for temporary modular and mobile office facilities. The Wisconsin Air National Guard requires the lease and mobilization of six 24x60 mobile/modular offices for a base year with options to extend leases for two additional years. Delivery is required within 105 days of award. The solicitation will evaluate technical, price, and past performance factors and is set aside for small businesses. Quotes are due by the date specified and must include the offeror's CAGE/DUNS and be valid for 90 days. The Department of the Army National Guard is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.01.Combo Question-Answer 1.pdf | ||
| FAR 52.204-24 Offeror Representations.pdf | ||
| A.03.Site Location Plan and Floor Plan.pdf | ||
| W50S9F21Q0001 Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S9F-21-Q-0001 Solicitation Question/Answer #2
Question #1:
“Walls may be painted drywall or paneled.”
Would vinyl covered gypsum drywall be acceptable? It is the industry standard wall finish.
Answer #1:
Yes, vinyl covered gypsum drywall is acceptable.
Question #2:
“Floors shall be carpeted except entry areas shall have a floor suitable for wet or snow-covered shoes.”
Please clarify the carpet requirement. The least expensive solution is either 20 oz or 26 oz olefin carpet installed as 12’ wide roll goods. Or would you be interested in 24” x 24” carpet tile (with or without no flow through vinyl backing)?
Answer #2:
Either carpet option is acceptable. We do not however; expect the carpet to be worn-out over the period we are using the facilities.
Question #3:
Do you have an anticipated award date?
Answer #3:
It is our intention to award this contract ASAP and begin execution in the most expeditious manner possible.
Question #4:
Are you still granting the 105 days from contract signature to the buildings being delivered and fully installed?
Answer #4:
The 105 days was established based on lead times provided as part of market research that was conducted, note that each CLIN states, “Period of Performance will be updated at time of award to reflect actual dates.” Finally, the solicitation states that contract award will result from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the