B.01.Combo Question-Answer 1.pdf

PDF 215 KB Posted

Attached to
115th Fighter Wing Temporary Modular/Mobile Office Facilities Federal contract opportunity
Solicitation number
W50S9F-21-Q-0001
Issued by
Department of the Army National Guard

About this file

This solicitation requests quotes for the lease of temporary modular office facilities. The Wisconsin Air National Guard seeks to lease five 24x60 mobile or modular offices for an initial base year with options to extend the lease for two additional years. The solicitation also includes options to lease one additional office unit for the base year and extend the lease for that unit for the two additional years. Quotes are due by the date specified and must remain valid for 90 days. The solicitation will result in a firm fixed price contract awarded to the responsible offeror whose proposal is most advantageous based on evaluation of technical acceptability, price, and past performance.

View the file

Other files for this federal contract opportunity

Other files attached to 115th Fighter Wing Temporary Modular/Mobile Office Facilities, newest first.
File Type Posted
B.01.Combo Question-Answer 2.pdf PDF
A.03.Site Location Plan and Floor Plan.pdf PDF
FAR 52.204-24 Offeror Representations.pdf PDF
W50S9F21Q0001 Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S9F-21-Q-0001 Solicitation Question/Answer #1

Question #1:

Upon delivery, each assembled unit shall be placed, setup and ready for occupancy in not more than 2 days.

I think that it would be very difficult to complete the installation, install 2 decks, skirt the building, install the canopy and, most importantly, complete the install of the low voltage within (2) 8 hour working days. The IT could take 2 days itself. It is also more likely than not that several buildings could deliver at one time.

Answer #1:

The point of this requirement is that the government would like the units set up in the most expeditious manner possible once on site, with minimum idle time between arrival and occupancy. If the all units arrived in a 2-3 day time period and then it took 10 days to set them all up; that’s fine. It does not have to be one unit 2 days, one unit 2 days, and one unit 2 days etc…

Question #2:

Is there a designated storage area for them on site?

Answer #2:

If the question is pertaining to storage of the office units themselves there is room in the area where the units are being set-up that can serve as a staging/storage area until installation is complete. If the questions is regarding a storage area for equipment there is also room for the contractor to place a storage unit, such as a PODS (Portable On Demand Storage), which the contractor will be responsible for providing.