Global ASNT Questions and Answers 3 Sep 2020.pdf

PDF 75 KB Posted

Attached to
Construct Global ASNT Support Facility
Solicitation number
W50S9A-20-B-0003
Issued by

About this file

This document contains an invitation for bid for construction services. The Utah Air National Guard is seeking a contractor to construct a Global ASNT support facility, including constructing an antenna platform and renovating a command post server room at Building 210. The project magnitude is between $500,000 and $1,000,000. The period of performance is 180 calendar days from notice to proceed. The solicitation close date is September 10, 2020. A pre-bid conference will be held on August 25, 2020. This acquisition is set aside for small businesses classified under NAICS code 236220 for commercial and institutional building construction with a size standard of $39.5 million.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers W50S9A20B0003 Construct Global ASNT Facility

1. How do we know for sure that we are not going to encounter and damage any conduits under the building when doing the directional drilling and who will be responsible? Do we need to X‐ ray the floor?

a. Answer: Existing utilities are shown on Drawing CU101. Elevations of building foundation, floors, and adjacent sewer manhole invert (contractor to field verify) are provided on this drawing for reference. Building Record Drawings can also be provided if requested.

Prior to drilling, the contractor is required to submit a dig permit. The utility owners (base Civil Engineers and Dominion Energy) will locate and mark all known utilities. The contractor is also required to submit a Layout Plan and Utility Profile for the drill operation, based on the provided utility plans and their own investigations. The contractor may utilize additional utility locating procedures if desired, such as ground penetrating radar, potholing, or using a camera in sewer pipes. Contractor shall follow industry practices in planning a buffer distance between expected utilities and their drilling operations.

Contractor is responsible for any damage to utilities whose locations were accurately provided to the contractor prior to drilling operations, or whose locations could have reasonably been estimated from the information provided. Contractor is not responsible for underground utilities at the site which differ materially from those indicated in the contract or unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered (See FAR 52.236‐2).

2. Is the facade of the building a brick veneer or a full sized brick? The response to this will determine whether we have to install a lentil above the new door by the Command Post.

a. Answer: See details A1, B1, and C1 on A‐601 for wall and lintel details.