Site Visit Handout.pdf

PDF 99 KB Posted

Attached to
COMM Electrical Circuit Installation
Solicitation number
W50S98-25-Q-0014
Issued by

About this file

This document is a Request for Quote (RFQ) for a COMM Electrical Circuit Installation at the 134th Air Refueling Wing Tennessee Air National Guard McGhee Tyson Air Base. The solicitation (Notice ID: W50S98-25-Q-0014) seeks a contractor to perform electrical circuit installation, including furnishing and installing an Eaton 480V 80A 3PH Bolt in Breaker, associated conduit and cabling work, and final electrical connections across multiple power distribution units.

Key submission details include: questions are due by 12 August 2025, with answers to be posted on SAM.gov, and quotes are due by 19 August 2025 at 10am Eastern. A mandatory site visit is scheduled for 31 July 2025 at 1:00 PM EST, with strict registration requirements for attendees, including providing firm name, visitor details, and a REAL ID driver's license copy. The CLIN-structured pricing template requires unit pricing for five line items covering equipment, installation, and labor, with contractors required to email quotes directly to the Contracting Point of Contact, TSgt Andrew Headrick.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notice ID: W50S98-25-Q-0014

COMM Electrical Circuit Install

Contracting POC: TSgt Andrew Headrick andrew.headrick@us.af.mil

865-336-3351

Submit all questions in writing to TSgt Headrick by 12 August.

Answers will be posted to SAM.gov as soon as I can get them.

Quotes due by 19 August at 10am Eastern. Email to TSgt Headrick and format pricing in the CLIN structure below

Line Item

Description Quantity Unit Unit Price Extended Price

0001 F&I (1) Eaton 480V 80A 3PH Bolt in Breaker

1 Each

0002 F&I Conduit, Cabling & Final Connections from Eaton Panel to PDU 1-

30LF

1 Each

0003 F&I Conduit, Cabling & Final Connections from Eaton Panel to PDU 2-

45LF

1 Each

0004 D&R Conduit and Cabling from In-Rack Power Distribution Unit from legacy feeders

1 Each

0005 Labor for installation (1) Eaton 480V 80A 3PH Bolt in Breaker and associated cabling.

1 Job

Total mailto:andrew.headrick@us.af.mil

File details come from the government source that posted it. Updated .