W50S98-23-B-00030001.pdf
PDF 231 KB Posted
- Attached to
- Construct KC-135 Support Shops Federal contract opportunity
- Solicitation number
- W50S98-23-R-0003
About this file
This document contains questions and answers related to solicitation number W50S98-23-R-0003 for the construction of KC-135 Support Shops. The solicitation is issued by the Department of the Army Tennessee Army National Guard to construct new support shop buildings at McGhee Tyson Air National Guard Base. Key details include questions on bid options for asphalt paving, lighting fixtures, exterior doors, electrical panels, security systems, low voltage rough-ins, aluminum storefront windows, and whether benches are required in locker rooms and showers. The answers provide clarification on specifications, drawings, and project scope.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Support Shops Bid Opening Sign In.pdf | ||
| OF_1419 Support Shops.pdf | ||
| W50S98-23-B-00030003.pdf | ||
| W50S98-23-B-00030002.pdf | ||
| QA Attachment - Support Shops.pdf | ||
| Support Shops QA.docx | DOCX document | |
| Sign In-Support Shops Site Visit.pdf | ||
| Pre-Bid Slides Support Shops.pdf | ||
| Bid Bond Checklist.docx | DOCX document | |
| Construct AMX Shops - Type B-3 - Specifications (Div 12-26).pdf | ||
| Construction SOW PSXE139013 Construct KC-135 Support Shops (7).docx | DOCX document | |
| Construct AMX Shops - Type B-3 - Specifications (Div 27-41).pdf | ||
| Construct AMX Shops - Type B-3 - Specifications (Div 01-10).pdf | ||
| W50S98-23-B-0003.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REASON FOR AMENDMENT: Incorporate questions and answ ers.
1. Questions and Answ ers 1-53 are hereby incorporated in to this solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Aug-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9823B0003
X 9B. DATED (SEE ITEM 11)
13-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Aug-2023
CODE
USPFO TN 134 MISSION SUPPORT CONTRACTING
123 BRISCOE DRIVE
MCGHEE TYSON ANG BASE TN 37777-6227
W50S98 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S9823B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
QUESTIONS AND ANSWERS
KC-135 Support Shops Q&A
1. Is the grade work for Option # 3 Light Duty Asphalt to be included in the base bid or in Option # 3?
A: The grade work for the Light Duty Asphalt shall be included in the base bid. The contractor will construct the parking lot up to the base stone/gravel section for the base bid. Binder and wearing course are Bid Option #3.
2. Will the brick on the new buildings match the brick on the new hangar?
A: Yes, Utility (Jumbo) brick will be used for the field brick and modular brick for the soldier coursing.
3. HARDWARE SETS LISTED ON DOOR SCHEDULE BUT NOT FOUND IN SPEC OR ON PLAN PAGES. PLEASE
ADVISE.
A: Hardware sets were inadvertently left out of the final specifications set for section 08 71 00 Door Hardware. This specification section will be provided herein.
4. Painting specification 09 00 00 section 3.12.1, calls for field finished wood doors. In the past, the Base has preferred factory finished wood doors. Please confirm the intent.
A: Part 3.12.1 in Painting spec 09 90 00 refers to Paint Tables for exterior ferrous and non-ferrous metal. Part 3.12.2 Division 6,A includes stain requirements for interior doors, but does not specifiy that they are field stained. However, the type of stain (clear) is incorrect. This section will be modified to include the correct factory finish for all interior doors.
5. Earthwork specification 31 00 00, section 1.4.1 calls for Unclassified Excavation. Is this correct? This will significantly increase the risk and cost of excavation due to unknown quantities of unsuitable soils and rock that may be encountered. This is especially true if undercutting and treating the entire site is required for the Soil Cement Modification mentioned above. In the past, the Base preference has been to price the work as classified excavation and pay for unsuitable soils and rock removal (if required) on an as needed basis. Please clarify.
A: Please consider all grading work to be classified excavation. Unsuitable soils and rock excavation will be paid for as required for the project.
6. CS101 Base bid and Option 03 parking. Is there a curb at the perimeter of the parking lot? I have not found notes or details showing curbs. Please clarify the intent.
A: The parking lot will have a curb and gutter and should be included in the base bid.
Refer to detail D1/CS501.
7. In the lighting legend the “H” fixture is listed as under cabinet, but it is indicated as an overhead light
– can you confirm what this fixture should be?
A: The Type H luminaires shown in the ceiling systems is a typo. Refer to keynote 2 on drawing EL121. All luminaires shown within the wood panel ceiling systems must be provided by the manufacturer of the wood ceiling system. These luminaires are not defined in the luminaire schedule. The contractor must coordinate with the ceiling manufacturer per the keynote and provide luminaires that meet the requirements. The break room must be provided with an average of approximately 30 foot candles and the corridor areas must be provided with an average of approximately 5 foot candles.
8. The “D” Fixture is indicated as a can light, but there are some under cabinet lights indicated as “D” Fixtures on EL121 – can you confirm what these fixture should be?
A: The D type fixture is a can light. The undercabinet luminaires are mislabeled as D type luminaires and must be provided as Type H undercabinet luminaires.
9. The reflected ceiling plan (sheet AC‐111) shows acoustic ceiling in room # 3119. The finish schedule on sheet I‐601 is calling for exposed structure. Can you please clarify which one the government desires.
A: Sheet I-601 is incorrect. Revise the ceiling finish to be ACT-2.
10. The door schedule specifies hardware set numbers 1 thru 24, there is no hardware schedule on the drawings nor in the specifications. Can you provide the hardware schedule?
11. There is no hardware set number scheduled for doors 3120A, 3139 A and 3139 B. Can you please provide set number?
12. Regarding the wood veneer casework, can the interiors of the cabinets be white melamine? This would reduce the cost of finishing as only the fronts and front edges would require finishing as well as finished ends.
A: No. Cabinets must be solid, veneered wood, factory-stained inside and out, with the exception for ABA removable vanity covers which shall be plastic laminate per sheet I-601.
13. Base bid question – Only 2 ADA/ABA parking areas and a small tie in to existing asphalt are shown for new asphalt. Will there be any curb & gutter for the base bid specifically in the parking area that is shown to get gravel? CS101 shows a curb wipe down note but no actual curb & gutter note on this sheet.
A: The parking lot will have a curb and gutter and should be included in the base bid.
Refer to detail D1/CS501.
14. Bid option #3 – If curb & gutter is not in base bid, will it be included in this option?
A: Curb and gutters are included in the base bid. Refer to D1 /CS501.
15. Bid option #5 – There are 2 notes about connection for new pavement to repair pavement but the whole area is shaded for new asphalt pavement. Please verify all light shaded gray area is new light duty asphalt.
A: Correct. The existing access road from Briscoe Drive to the existing perimeter fence will be demolished to the base stone, proof rolled and re-paved. Refer to sheet CD102. A new road is also being constructed once all the buildings and existing asphalt are demolished in the area. This road will connect the repaired access drive from the existing perimeter fence to the existing asphalt shoulder on the lower ramp.
Both areas will be paved using the light duty asphalt detail. Refer to A3/CS501
16. On Sheet I-401 (A1) ; Who would be responsible for “Antimicrobial Color Matched Silicone Sealant”?
A: The tile installer will need to provide this sealant.
17. Drawing I-110 shows areas (3102, 3103, 3104, 3108, & 3109) to receive PFT-3. Do we figure 12” x 24” or 24” x 36” tile?
A: Sheet 1-403 shows enlarged finish plans with rooms (3102, 3103, 3104, 3108 & 3109); The dimensions are provided to show that a 24" x 36" tile must be used as shown and PFT-4 must be used in the shower enclosures.
18. In Bathroom areas, is there to be Ceramic Wall Tile or Wall Base behind or to the sides of Lockers?
A: The tile should run on the sides of the lockers (wing walls); but only a wall base behind the lockers, so that the lockers can be attached to the wall when installed.
19. Are we to figure waterproofing for ceramic floors and walls in areas other than just showers?
A: No. Only showers require water-proof membrane substrates.
20. What product do we use at “TS-1 Transition Strip” shown at Walk-Off Carpet areas on Drawing I- 120?
A: Transition details are shown on sheet I-401 (D1).
21. Which showers are ADA showers?
A: The wider showers in each restroom are the ABA roll-in showers. The others will have shower curbs.
22. Just to verify intent: Floors in rooms 4107, 4108, 4109, 4110, 4110A, 4110B, 4111, 4111A, & 4111B are to receive PT‐1 (24”x36”), PT‐2 (24”x24”), & PT‐3 (12”x24”). Is this the case?
A: On sheet I-120 an enlarged finish floor plan is provided to show the tile pattern;
There will be a combination of PFT3 - 24" x 36" and 24" X 12"; PFT2 - 24" x 24";
PFT4
will be used in the showers; PFT1 is not used in these rooms.
23. Wall types are not given at the Kitchen, women’s toilet and locker rooms and men’s toilet and locker room. Can you please provide wall types for these areas?
A: Kitchen partition walls shall be Wall Type W-3, all perimeter toilet room walls shall be W-1, all toilet room interior walls shall be W-3, and all toilet chase walls shall be W-5.
24. Mechanical schedules state that VFD's are to be furnished with equipment. Drawing EP112 Note #9 states EC's are to provide enclosure for VFD. Please clarify, The VFD type and size would need to be provided if the EC's are to provide enclosure for VFD.
A: Mechanical schedules do not state that VFD's are to be furnished with equipment.
Schedules for AHU and Hydronic Pumps indicate "FIELD SUPPLIED VFD PER
DIVISION
26 SPECIFICATIONS" which means that VFD's are furnished and installed by electrical contractor. Schedule for MAU indicates " FACTORY VFD FOR SUPPLY FAN, FACTORY
DISCONNECT SWITCH" which means that ONLY MAU may be supplied with VFD. If mechanical contractor provides an MAU with a mounted VFD, then no enclosure is required; if mechanical contractor provides a loose VFD then electrical contractor must provide an enclosure suitable for the drive supplied by the mechanical contractor. Electrical contractor must coordinate size and type of drive with the equipment furnished by mechanical contractor per approved equipment submittals.
25. E-501 - D4 - Floorbox detail states that three 1 1/4" conduits for data/AV, the Data/Comm drawings call for three 2" conduits. Which is correct?
A: Provide three 2" conduits for the data/AV as specified on the communications drawings for these floor boxes.
26. EP112 - Note #7 - Bid option #2 Bridge Crane - shows 100A disconnect, panel schedule shows 20A/3Ph circuit. Please clarify.
A: The 20A, 3-phase circuit shown on the panel schedule is accurate. The disconnect switch does not need to be a 100A rated disconnect switch. A 30A rated disconnect switch is acceptable instead.
27. EP112 shows MAG-1 with no circuit but 100A disconnect. Please clarify what panelboard is to feed MAG-1 A: Refer to the connection schedule on drawing E-630 and the one-line diagram on E-
601. These two drawings show that MAG-1 is fed via 3121-MPD-1.
28. EL111 - Room 3107 - the exterior door has the circuit indicator but no fixture. Please clarify A: This door is suppose to have a fixture. EL111 has two exterior luminaires shown in the wrong location on the plan north side of the building. The two luminaires in the wrong locations are shown with emergency drivers (black dot in the middle of the fixture). These two fixtures are located at approximate gridlines 4.5 and 6.5. These two luminaires must be installed at the two doors on the plan north side of the building at the two doors without any lights shown but are showing a circuit 6 callout.
29. EL111 - Vest 3106 - the exterior door has the circuit indicator but no fixture. Please clarify A: This door is suppose to have a fixture. EL111 has two exterior luminaires shown in the wrong location on the plan north side of the building. The two luminaires in the wrong locations are shown with emergency drivers (black dot in the middle of the fixture). These two fixtures are located at approximate gridlines 4.5 and 6.5. These two luminaires must be installed at the two doors on the plan north side of the building at the two doors without any lights shown but are showing a circuit 6 callout.
30. EL120 - kitchen 4105 - Fixture type "D" is a can light shown in the kitchen. Plan west shows the undercabinet light noted as "D". In the schedule the undercabinet light is supposed to be type "H",in the breakroom 4106 those fixtures are noted type "H" - What are these fixtures supposed to be? Please clarify.
A: The D type fixture is a can light. The undercabinet luminaires are mislabled as D type luminaires and must be provided as Type H undercabinet luminaires. The Type H luminaires shown in the ceiling systems is a typo. Refer to keynote 2 on drawing EL121. All luminaires shown within the wood panel ceiling systems must be provided by the manufacturer of the wood ceiling system. These luminaires are not defined in the luminaire schedule. The contractor must coordinate with the ceiling manufacturer per the keynote and provide luminaires that meet the requirements.
The break room must be provided with an average of approximately 30 foot candles and the corridor areas must be provided with an average of approximately 5 foot candles.
31. Section 08 33 23 Overhead Coiling Doors ‐ The locking specification listed below is a maintenance issue. Doors will be locked via the motor operator. Intrusion from the outside would be extremely difficult. We highly recommend that the slide locks and interlocks are eliminated. Please advise
2.2.1.6 Locking Devices
Ensure that the slide bolt engages through slots in tracks for locking by padlock, located on both left and right jamb sides, operable from coil side.
Provide a chain lock keeper suitable for a standard padlock.
2.2.1.7 Safety Interlock
Equip power‐operated doors with a safety interlock switch to disengage power supply when the door is locked, or provide an operator with an internal lock sensing device to prevent the door opening when the door is locked.
A: Agreed. In specification 08 33 23 Overhead Coiling Doors, delete parts 2.2.1.6 and
2.2.1.7 entirely.
32. Guides, are specified as the same material as the door but then in the second paragraph aluminum and stainless are required. What are we to provide steel ( as the door curtain), aluminum or stainless?
2.2.2.1 Guides
Fabricate curtain jamb guides from the manufacturer's standard angles or channels of same material and finish as curtain slats unless otherwise indicated. Provide guides with sufficient depth or incorporate a steel locking bar to retain the curtain in place under the wind pressure specified. Ensure curtain operates smoothly. Slot bolt holes for track adjustment. Securely attach guides to adjoining construction with not less than 3/8 inch diameter bolts, spaced near each end and not over 30 inches apart.
Fabricate with stainless steel or aluminum angles. Provide windlock bars of same material when windlocks are required to meet specified wind load.
Flare the top of inner and outer guide angles outwards to form bellmouth for smooth entry of curtain into guides. Provide removable guide stoppers to prevent over travel of curtain and bottom bar.
A: In specification 08 33 23 Overhead Coiling Doors, Part 2.2.2.1, keep the first paragraph, and delete the first sentence of the second paragraph.
33. The specification for the hood is inconsistent with the rest of the door construction. 18 ga aluminum or stainless. The Door curtain is steel. Are we to provide a steel ( as the door curtain), aluminum or stainless hood?
2.2.2.2 Hood
Provide a hood with a minimum aluminum 18‐gauge B&S or stainless steel, flanged at top for attachment to header and flanged at bottom to provide longitudinal stiffness. The hood encloses the curtain coil and counterbalance mechanism.
A: In specification 08 33 23 Overhead Coiling Doors, Part 2.2.2.2, delete the first sentence of the first paragraph and insert the following language: 'Provide a hood fabricated of the same material and finish as the curtain slats, flanged at the top for attachment to header and flanged at the bottom to provide longitudinal stiffness.'
34. Motor starters as specified below, indicate what is termed as a combination starter. This means the control panel for the motor operator is place in a location other than at eh door operator. Most common placement is at eye level. This option is very expensive and not used very often. Is the combo panel required or can simply provide a control panel connected directly to the motor operator as current doors at TANG currently have?
A: Combination motor starters must be provided as shown on the Contract Documents.
35. Second question is the NEMA type 6 enclosure. This is dustproof and water resistant. Is this option required? Standard is NEMA 1, and would be less expensive and would seem to be suffieint for this application.
A: Jacobs cannot find any reference to NEMA 6 enclosures in the Contract Documents. No reference is provided in the comment pointing to where this was found. NEMA 1 enclosures are acceptable for interior applications unless the Contract Documents specifically state that an enclosure must meet other NEMA requirements.
36. It appears the un‐fused disconnect is being supplied by the electrical scope. If we are to provide the disconnect please advise. I will have a couple of questionS if we are to provide. The decision on the combination starter will also affect our questions.
2.2.5.4 Motor Starters, Controls, and Enclosures
Provide each door motor with: a factory‐wired, unfused, disconnect switch;
a reversing, across‐the‐line magnetic starter with thermal overload protection; 24‐volt operating coils with a control transformer limit switch; and a safety interlock assembled in a NEMA ICS 6 type enclosure as specified herein. Ensure control equipment conforms to NEMA ICS 1 and
NEMA ICS 2.
Provide adjustable switches, electrically interlocked with the motor controls and set to stop the door automatically at the fully open and fully closed position
A: Un-fused disconnect switches must be provided as shown in the Contract Documents. It is unclear what the other questions are that are mentioned in this comment/question.
37. The finish specified is a standard finish and have 4 colors available. White, Tan, Brown or Grey. Are these colors acceptable? If not powdercoat finish is required and would have 197colors available. For the powdercoat finish an addenda would be required to change this portion of the specification.
Some door installations at TANG are powdercoat finish.
2.2.6.1 Galvanized and Shop‐Primed Finish
Surfaces specified must have a zinc coating, a phosphate treatment, and a shop prime coat of rust‐inhibitive paint. The galvanized coating must conform to ASTM A653/A653M, coating designation Z275 (G90), for steel sheets, and ASTM A123/A123M for iron and steel products. The weight of coatings for products must be as designated in Table I of ASTM A123/A123M for the thickness of base metal to be coated. The prime coat must be a type especially developed for materials treated by phosphates and adapted to application by dipping or spraying. Repair damaged zinc‐coated surfaces by the materials and methods conforming to ASTM A780/A780M and spot prime. At the option of the Contractor, a two‐part system including bonderizing, baked‐on epoxy primer, and baked‐on enamel top coat may be applied to slats and hoods before forming, in lieu of prime coat specified.
2.2.6.2 Baked‐Enamel Finish
Manufacturer's standard baked‐on finish consisting of prime coat and thermosetting topcoat. Comply with the coating manufacturer's written instructions for cleaning, pretreatment, application, and minimum dry film thickness.
A: Specification 08 33 23 will be revised and resent. The finish for all overhead doors shall be powder coating on both faces of the door slats, along with the hood and guide rails.
38. We will be proposing our installation without scope of control wiring. We will not be able to supply wiring at TANG as we not licensed electricians. Do you want us to supply an add for this scope by contacting your electrician for a quote to do this work? This scope is specified in our section as detailed below. I am unsure if the electrical specification also has this in their scope.
3.1 INSTALLATION: Install overhead coiling doors, switches, and controls along accessible routes in compliance with regulatory requirements for accessibility and as required by the manufacturer.
A: The referenced section is Section 08 33 23.
39. Reference drawing sheets P116 and P117. There is a set of 7/8” Oil and Hydraulic high pressure lines shown from the oil storage tanks to exterior wall mounted hose reels on the East side of the AGE
Shop Room 3123. There are also some hose reels shown on the West side of the Shop, but it is unclear how the piping is to be routed to these reels. Please indicated how the piping is to be routed to all of the hose reels.
A: Please refer to P-402 for isometric showing requested information.
40. Reference drawing sheet P501, note # 14. This note indicates pressure tubing from pumps to reels for motor oil and hydraulic oil to be 7/8” tubing with ferrule fittings. We have been unable to find this specific piping the specifications. Additionally, we cannot find a detail for the air compressor, dryer, and filter on the drawings. Please provide these items.
A: Use pipe material per Piping Schedule shown on P-602 for CA - COMPRESSED
AIR.
Furnish air Compressor, dryer and filter per equipment schedule.
Install air Compressor, dryer and filter per manufacturer's recommendation.
41. FA110 ‐ Vestibule 3101 ‐ Symbol "K" does not show up on the legend, please clarify.
A: The symbol "K" showing up on FA110 outside of vestibule 3101 is a rapid entry key box used for first responders to enter the building quickly without having to use force of entry.
42. AV1 & AV2 boxes ‐ What is the conduit size for the AV box rough‐ins?
A: 1 1/2" for AV wall outlets, 2" for Floor box locations
43. T‐504‐D1 ‐ Is there a specific AV box type required?
A: No specific AV insert required. Size to accommodate faceplates.
44. Is the EC required to carry the AV install in their pricing or just carry the rough‐in? If required, please provide the AV specifications.
A: AV install to include cabling as shown in detail B1 on sheet T-504
45. Bid Option #6 ‐ Security ‐ States to provide all security camera systems, card readers, etc. and to provide a complete and useable security system. The drawings have a couple of card readers and keypads but does not show any cameras. Is there additional security drawings?
A: There are no additional security drawings. There are no security cameras. Only card access entering secure areas.
46. Bid Option #6 ‐ Security ‐ Lists Advantor. Is there a contact available for Advantor?
A: Email: govsales@advantor.com for information.
47. For all low voltage rough‐ins ‐ Security, Data/Comm, AV ‐ Does the EC need to provide conduit to the cable tray or is J‐Hooks from the Stub up to the tray acceptable?
A: 1" EMT for locations over 50' from tray, J-hooks will be utilized within 50' of an outlet from tray.
48. Is there a specific manufacture and or installation for the static discharge plates?
A: There is no specific manufacturer required for the static discharge plates. The static discharge plates on drawing EG101 have detail callouts for B5/E-502 which is a standard detail for a ground bar. Provide this and mount as detailed in keynote 4.
49. Sheet I116 general notes for the Support Shop clarify that FFE is for reference only and provided by others. Sheet I126 does not include the same note, but I assume this is also for reference only. Please clarify the intent.
A: Yes, all furniture is shown for reference only.
50. D1 & D5/A510 call for 2" rigid insulation at the foundation perimeter, D3/A510 calls for 4" rigid insulation. Specs call for R10 underslab/perimeter insulation. Please clarify the intent.
A: Revise all foundation notes on sheets A-311, A-312, A-313 & A-314 calling for R- 20, min. rigid insulation at foundation to read: R-10, min. extruded polystyrene (XPS) rigid perimeter insulation. Under-slab insulation is not required. Revise all perimeter insulation notes on sheet A-510 to read: R-10, min. extruded polystyrene (XPS) rigid perimeter insulation.
51. In reviewing this project for TANG KC‐135 Support Shops, we have found the temp panel shown on ES102 is listed as 100A 120/240V single‐phase however the existing and new circuits are 150A 208V 3‐phase. Does this new temp panel need to be upsized and changed to 3‐phase power?
A: Drawing ES102 shows the temporary munitions site. These munitions buildings are existing and are all currently fed via the transformer shown on that drawing (XFMRD). Per keynote 5, that existing transformer is rated 240/120V, 1-phase, 25kVA. At 25kVA, the maximum load that transformer can supply is 105 amps. The only additional load being added to that transformer are the three pole-mounted LED lights. The 100A, 1-phase panelboard is acceptable for the temporary munitions site.
The new munitions site shown on drawing ES401 does have a larger, three-phase panelboard.
52. In reference to aluminum storefront windows, see drawing sheets A-610, S-001, and specification section 08 41 113 (Aluminum Framed Entrances and Storefront). It is unclear what Anti-terrorism/Force Protection requirement apply to the storefront framing. A-610 has a note on most exterior storefront window elevations stating:
“EXTERIOR ALUM W/1” INSUL GLAZING (AT/FP)” Specification 0841113 references ASTM F1642/1642M (Test Method for Glazing and Glazing Systems subject to airblast) in multiple locations. Drawing sheet S-001 lists UFC 4-010-01 (DoD Minimum Anti-Terrorism Standards for Buildings) as a design requirements, but does not provide any guidance on charge loads or standoff distances required for analysis per UFC-4-010-01. Specification 0841113 Paragraph 2.1.1 (Design requirements) list requirements for Dead and Live loads, Seismic loads, Wind loads, Thermal loads, and water and air resistance, but does not specify any airblast loads.
Please provide clarification as to what degree the aluminum storefront windows are subject to UFC 4-010-01 and ASTM F1642/1642M including charge load and standoff distances if applicable.
A: The window systems only fall under the minimum ATFP standards for glazing.
Refer to part 3-11.1 for glazing requirements in UFC 4-010-01. There are no charge weights to be identified. The inner panes of the the insulated glazing panels simply need to be laminated glass or polycarbonate per the UFC.
53. Benches are shown in the Admin building at showers and locker rooms. There is none shown in the shop building. Will benches be required in the shop building showers and locker rooms? Is so please provide a floor plan showing the benches.
A: Yes, benches are required in most locker rooms and in the shower areas. The floor plan will be revised to show locations and the bench material will be identified.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .