This is a technical drawing and specification document for communications room rack and cable tray layout at the 156th Communications Squadron facility.

The project requires installation of fourteen communications racks arranged in two parallel rows of seven racks each, with a minimum four-foot clear distance maintained between the rows. One vertical cable manager must be installed between each pair of adjacent racks within each row, plus one at both ends of each row. All racks and vertical cable managers shall be securely anchored to the concrete floor using stainless steel anchor/expansion bolts and must be bonded and grounded in accordance with applicable local, state, federal, NEC, and telecommunications grounding standards. A new overhead cable tray must connect the terminus of existing overhead cable trays to the back wall of the room, matching the existing tray in width, depth, material, finish, and installation height. The contractor must field verify all existing conditions, dimensions, clearances, and cable tray elevations prior to installation. All racks shall be installed plumb, level, and aligned within each row, with all required hardware, supports, brackets, fasteners, and accessories provided for complete and secure installation. Required working clearances around communications racks and equipment must be maintained throughout the installation.

View the file

Other files

File Type Posted
PXL_20260428_111435119.jpg JPG image
RFIs.pdf PDF
PXL_20260428_111417460.jpg JPG image
RFQ_CommRacks W50S9326QA004.pdf PDF
PXL_20260407_144044412.jpg JPG image
PXL_20260407_144039373.jpg JPG image
NCC Comm Racks Statement of Work 31Mar26.pdf PDF
RFQ_CommRacks W50S9326QA004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

7'-0" APPROX.

4'-0" MIN. CLEAR

FLUSH W/ EXISTING

OVERHEAD CABLE TRAYS

NEW CEILING CABLE TRAY

[MUST CONNECT TO EXISTING CABLE TRAY]

24'

27'-7"

TELECOMMUNICATIONS

ENTRANCE CONDUITS FOR FIBER

/ COMMUNICATIONS SERVICE

ROUTE TO COMM ROOMS

AC

U

N

IT

AC

U N

IT

156TH COMMUNICATIONS

SQUADRON

COMMUNICATIONS ROOM RACK AND

CABLE TRAY LAYOUT

Drawn By:

Verified By:

SCALE: 1/4" = 1'-0" SHEET: 1 of 1

Notes:

TSgt Carbonell, M

SMSgt Juarbe, E

1. THE FOURTEEN (14) COMMUNICATIONS RACKS SHALL BE

ARRANGED IN TWO (2) PARALLEL ROWS OF SEVEN (7)

RACKS EACH.

2. A MINIMUM CLEAR DISTANCE OF FOUR (4) FEET SHALL BE

MAINTAINED BETWEEN THE TWO (2) ROWS OF RACKS.

3. ONE (1) VERTICAL CABLE MANAGER SHALL BE INSTALLED

BETWEEN EACH PAIR OF ADJACENT RACKS WITHIN EACH

ROW, AND ONE (1) VERTICAL CABLE MANAGER SHALL BE

INSTALLED AT BOTH ENDS OF EACH ROW.

4. ALL RACKS AND VERTICAL CABLE MANAGERS SHALL BE

SECURELY ANCHORED TO THE CONCRETE FLOOR USING

STAINLESS STEEL ANCHOR/EXPANSION BOLTS.

5. ALL COMMUNICATIONS RACKS, CABLE MANAGERS, AND

ASSOCIATED METALLIC COMPONENTS SHALL BE

BONDED AND GROUNDED IN ACCORDANCE WITH ALL

APPLICABLE LOCAL, STATE, FEDERAL, NEC, AND

TELECOMMUNICATIONS GROUNDING STANDARDS.

6. THE NEW OVERHEAD CABLE TRAY SHALL CONNECT THE

TERMINUS OF THE EXISTING OVERHEAD CABLE TRAYS

TO THE BACK WALL OF THE ROOM. NEW CABLE TRAY

SHALL MATCH THE EXISTING CABLE TRAY IN WIDTH,

DEPTH, MATERIAL, FINISH, AND INSTALLATION HEIGHT,

UNLESS OTHERWISE NOTED.

7. CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS, DIMENSIONS, CLEARANCES, AND CABLE

TRAY ELEVATIONS PRIOR TO INSTALLATION.

8. ALL RACKS SHALL BE INSTALLED PLUMB, LEVEL, AND

ALIGNED WITHIN EACH ROW.

9. PROVIDE ALL REQUIRED HARDWARE, SUPPORTS,

BRACKETS, FASTENERS, AND ACCESSORIES FOR A

COMPLETE AND SECURE INSTALLATION.

10. MAINTAIN REQUIRED WORKING CLEARANCES AROUND

COMMUNICATIONS RACKS AND EQUIPMENT.

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .