Industry Questions Demolition Diesel Tank Aguadilla.docx
DOCX document 12 KB Posted
- Attached to
- Underground Diesel Tank Demolition
- Solicitation number
- W50S9321B9981
- Issued by
-
Department of the Army National Guard
About this file
This document provides details regarding an upcoming federal solicitation for underground diesel tank demolition services. The Puerto Rico Air National Guard intends to issue an invitation for bid to award a firm fixed-price contract to demolish and dispose of an underground diesel tank at the 141st Punta Borinquen Installation in Aguadilla, Puerto Rico. The scope of work includes removing the existing underground storage tank, excavating contaminated soil, purging volatile vapors, collecting soil samples, and disposing of soil in accordance with Puerto Rico regulations. The project size is estimated between $100,000 and $250,000 and must be completed within 180 calendar days of the notice to proceed. The NAICS code is 238910 and the project has been set aside for small businesses. A non-mandatory site visit will be held on July 30, 2021 and bids are due by August 27, 2021. Interested parties must register in the System for Award Management and check the Contract Opportunities website regularly for any solicitation amendments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Questions Demolition Diesel Tank Aguadilla.docx | DOCX document | |
| Solicitation.docx | DOCX document | |
| TKWR2123202_SOW_Demo_Existing _Underground_Diesel_Tank_DRAFT_FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Questions Demolition Diesel Tank Aguadilla
1. What will be the allowance for contaminated soil extraction and disposal? Make reference to section 5.1.1 and 5.1.2 of the Scope of Work.
2. Is there an estimated quantity of contaminated soil, to base our bids on? Make reference to section 5.1.1 and 5.1.2 of the Scope of Work.
3. Can a unit price be included, given that we have no quantity to base our price on? No.
4. What is the size of the tanks? 10,000 gals.
5. How much fuel is anticipated to be left in the tanks? Which fuel (diesel/gas)? Almost nothing.
6. How thick is the concrete slab? Around 6”.
7. Is it possible to extend the proposed delivery time? Companies will have to complete testing and then suppliers will have to provide quotes. This process could take time. Is possible.
8. What job barrier type will be needed for the demo work at PRANG? Must be summited by the contractor. Shall comply with safety and erosion and sedimentation control.
9. Is there any preference for the disposal site to be used? No, as long it complies with proper disposal.