NRA_Notification_70 feet poles.pdf

PDF 17 KB Posted

Attached to
Apron Lighting System Construction 156th AW PR ANG Federal contract opportunity
Solicitation number
W50S9320B5017
Issued by
Department of the Army National Guard

About this file

This document includes a federal contract opportunity notice for construction services. The 156th Airlift Wing of the Puerto Rico Air National Guard intends to issue an invitation for bid to award a single firm fixed-price contract for construction of a new state-of-the-art apron lighting system at Muniz Air National Guard Base in Carolina, Puerto Rico. The lighting system is to be based on LED technology and will include installation of poles and fixtures per provided specifications and drawings. The magnitude of the project is estimated between $500,000 to $1,000,000, with a 365-day period of performance. The solicitation is designated as a 100% total small business set-aside. The NAICS code is 236220 and small business size standard is $36.5 million. The pre-bid site visit is scheduled for August 19, 2020 and questions are due by August 26, 2020. The solicitation is expected to be issued on or about August 28, 2020 with a closing date of September 26, 2020.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Aviation Administration 1701 Columbia Ave., Suite 220 College Park, GA 30337

Atlanta Airports District Office

September 10, 2020

TO:

Puerto Rico Air National Guard Attn: Lt COL Elemaniel R. Pagan 200 Jose A. (Tony) Santana Ave.

Muniz ANG Base Carolina, PR 00979-1502 elemaniel.r.pagan.mil@mail.mil

CC:

Jorge Hernandez Terminal D Luis Munoz Marin Int. Airport Carolina, PR 00979 jorge.hernandez@aerostarairports.com

CC:

Jacobs Engineering Group Attn: Jesus Colon 300 Felisa Rincon de Gautier Avenue Suite 45 Las Vistas Shopping Village San Juan, PR 00926 jesus.colon2@jacobs.com

RE: (See attached Table 1 for referenced case(s))

**FINAL DETERMINATION**

Table 1 - Letter Referenced Case(s)

ASN Prior ASN Location Latitude

(NAD83)

Longitude

(NAD83)

AGL

(Feet)

AMSL

(Feet)

2020-ASO-3417-NRA 2017-ASO-5054-NRA SAN JUAN,PR 18-26-39.25N 65-59-43.37W 70 74

2020-ASO-3418-NRA 2017-ASO-5054-NRA SAN JUAN,PR 18-26-41.55N 65-59-37.50W 70 74

2020-ASO-3419-NRA 2017-ASO-5054-NRA SAN JUAN,PR 18-26-42.43N 65-59-32.70W 70 74

Description: ANG/NGB Project TUMR112120 Apron Lighting System: This project consist on the construction of a new lighting system to provide service to the existing apron area at the Muniz Air National Guard Base.

It consist on the installation of a new state-of-the-art lighting system composed of (3) 70 ft tall and (4) 80 ft tall poles with LED Lighting. The new system will provide the existing apron area with new lighting at levels required based on current ANG/NGB criteria and will allow the PRANG to work on those areas more effectively. The poles will be equipped with aircraft warning lights, lightning protection and emergency power.

Pole P-1.

We do not object with conditions to the construction described in this proposal provided:

You comply with the requirements set forth in FAA Advisory Circular 150/5370-2, "Operational Safety on Airports During Construction."

The proponent will reference FAA Advisory Circular 70/7460 1L for marking and lighting. A NOTAM should be issued concerning the construction and safety aspects of this project. The crane will affect night ops. Lower equipment when not in use, at night and during low visibility conditions.

Pole will exceed the Part 77 RWY 08/26 transitional surface. The pole must be marked with a red obstruction light(s). Red obstruction light(s) must conform to chapter 3, 4, 5, and 12 in accordance with FAA’s advisory circular 70/7460-1L, Change 2, Obstruction Marking and Lighting. Copy of the current AC 70/7460-1 can be viewed and/or downloaded at https://www.faa.gov/regulations_policies/advisory_circulars/index.cfm/go/ document.information/documentID/1030047

For current Advisory Circulars go to www.oeaaa.faa.gov https://oeaaa.faa.gov

Further, you should contact the Airport Traffic Control Tower (ATCT) Watch Supervisor at prior to the crane(s) being raised for purposes of establishing a procedure to have the crane(s) immediately lowered upon request of the ATCT. When the crane(s) is no longer needed and has been permanently lowered, you should contact the ATCT at the telephone numbers given above and log back into your registered E-file account to provide the Flight Data Center (FDC) with notification that the NOTAM can be cancelled.

A separate notice to the FAA is required for any construction equipment, such as temporary cranes, whose working limits would exceed the height and lateral dimensions of your proposal.

This determination does not constitute FAA approval or disapproval of the physical development involved in the proposal. It is a determination with respect to the safe and efficient use of navigable airspace by aircraft and with respect to the safety of persons and property on the ground.

In making this determination, the FAA has considered matters such as the effects the proposal would have on existing or planned traffic patterns of neighboring airports, the effects it would have on the existing airspace structure and projected programs of the FAA, the effects it would have on the safety of persons and property on the ground, and the effects that existing or proposed manmade objects (on file with the FAA), and known natural objects within the affected area would have on the airport proposal.

When your Airport Layout Plan is updated, please include this new development. In the meantime, we will show this feature on your current ALP approved on 12/14/2007.

This determination expires on March 10, 2022 unless:

(a) extended, revised or terminated by the issuing office.

(b) the construction is subject to the licensing authority of the Federal Communications Commission (FCC) and an application for a construction permit has been filed, as required by the FCC, within 6 months of the date of this determination. In such case, the determination expires on the date prescribed by the FCC for the completion of construction, or the date the FCC denies the application.

NOTE: Request for extension of the effective period of this determination must be obtained at least 15 days prior to expiration date specified in this letter.

If you have any questions concerning this determination contact Anthony M. Vazquez (939) 489-8759 Anthony.M.Vazquez@faa.gov. On any future correspondence concerning this matter, please refer to Aeronautical Study Number 2020-ASO-3417-NRA.

Anthony M. Vazquez

ADO

Signature Control No: 442862256-450553588