This is a Questions and Answers document for federal contract opportunity W50S8V-26-Q-0020 regarding a roof inspection service at Building 307 of the 167th Air Force facility. The document provides clarifications on 10 key inquiries submitted by potential contractors regarding project scope, access requirements, and technical specifications.

The inspection covers a metal pitched roof system spanning approximately 70,000 square feet on a 2-story building. No security clearances are required for contractor personnel, though the Government will provide temporary base access and badging pending background check clearance. Personnel will have unescorted access once badgered, with the exception that Security Forces may require an escort if roof access extends to the flightline side. A pre-quote site visit is scheduled for May 5th from 0900-1100 hours, requiring attendees to submit completed documents with legible driver's license copies to philip.henderson.5@us.af.mil. Thermal imaging is mandatory as part of the inspection deliverable, with the contractor required to provide a report identifying areas of moisture infiltration. No specific software or format is mandated for the thermal imaging analysis. A map of Building 307 is attached to the solicitation documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S8V-26-Q-0020

167th Building 307 Roof Inspection

Questions and Answers

1. For contractor personnel performing the inspection, are any security clearances required for access to the work area?

- No

2. If clearances are not required, will the Government sponsor contractor personnel for temporary base access and badging as needed for performance?

- Yes, passes will be provided pending passed background check.

3. Will contractor personnel be escorted while performing the inspection, or is unescorted access anticipated once access credentials are issued?

- Unescorted due to badging. SFS might require an escort if/ when they have to access the flightline side of the roof

4. Is a site visit available prior to quote submission? If so, please advise the process for scheduling attendance.

- Yes, site visit will be May 5th from 0900 – 1100. Please fill out attached documents for all attendees ensuring to attach a clear legible copy of their driver’s license and send to philip.henderson.5@us.af.mil

5. Can you provide a map showing which building is B307?

- Yes, map outlining building 307 attached

6. What is the square footage of the Building 307 roof?

- Approx. 70,000 sq ft

7. What type of roof system is it (flat, metal, membrane, or pitched)?

- Metal pitched

8. How many floors does Building 307 have?

- 2

9. Is there a specific thermal imaging software or format required?

- No

10. Does the Government require thermal imaging as part of this inspection?

- Yes, providing a report showing areas of moisture infiltration.

mailto:philip.henderson.5@us.af.mil