This document is a Questions & Answers (Q&A) file related to Solicitation No. W50S8V-24-Q-0014 for a 75 HP Rotary Screw Air Compressor.
The key details are:
- The solicitation is for the purchase of a 75 HP Sullair Model D-543 Direct Driven Rotary Screw Air Compressor (or equal), along with Sullair TD-543 Electronic Drains (or equal), installation, and removal/disposal of the old air compressor.
- Salient characteristics include the compressor being air-cooled, 460V, with 2" NPT connections, three (3) micron coalescing housings and filters, and an internal or external air dryer.
- The old compressor is located on the second floor of a maintenance hangar, and the contractor is responsible for its removal and disposal.
- A site visit is scheduled for August 1, 2024, and offers are due by August 15, 2024, at 12:00 pm EST.
- The solicitation is a total small business set-aside associated with NAICS code 333912, with a small business size standard of 1,000 employees.
- The contracting agency is the Department of the Army National Guard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers for Solicitation No:
W50S8V-24-Q-0014
75 HP Rotary Screw Air Compressor
Questions:
1. Is existing ductwork being removed?
a. Awarded contractor is responsible for unhooking pre-existing ductwork and reattaching old/new ductwork for a complete and usable air compressor.
2. If not removed, does the compressor need to fit under existing ductwork?
a. It does not, however; ductwork must be reattached, or new ductwork installed to inlet and exhaust once the install is complete.
3. Does the new compressor need to have ductwork?
a. Yes, inlet and exhaust.
4. Do you want the dryer to remain 460 volts?
a. The only power that is in the vicinity of where the dryer will be placed is 460 volts (hard-wired) or 110 volts (plug-in). All electrical must be in compliance with NEC.
5. Can we determine the order of the inline filters and how they’re installed inline?
a. Yes, as long as they’re in no water downstream of the filters once installed.
6. Are you requesting three (3) in-line oil coalescing filters each with auto drains or one (1), 3-micron filter with three (3) separate auto-drains?
a. We are requesting three (3) micron coalescing housings and filters each, with each housing having an auto drains. Three (3) housings and three (3) auto drains.
7. Can we schedule a site visit?
a. The Government has scheduled a site visit for 1 August 2024 at 0900 EST. Contractor must submit background check form attachment located on SAM.gov prior to attendance.