Pre-Bid RFI Log 142003 RenoB1013 7.12.2021.pdf
PDF 135 KB Posted
- Attached to
- BLDG 1013 Renovation
- Solicitation number
- W50S8T21B0001
- Issued by
-
Department of the Army National Guard
About this file
This document contains a pre-bid question and answer log for a federal solicitation to renovate Building 1013 at a National Guard facility. The solicitation seeks to update electrical service and distribution, replace the roof, repair the hangar door system, paint interior and exterior surfaces, upgrade HVAC, replace flooring, reconfigure hangar space, and install fire suppression systems including a pump house and site work. Questions from potential offerors cover clarifications on specifications, drawings, hazardous materials handling, permitting requirements, and commissioning responsibilities. The government provides responses to assist offerors in accurately preparing bids for the work prior to the submission deadline.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: RFI No.
RFP Reference
(Sect/Para/Page)
QUESTION GOVERNMENT RESPONSE
6/23/2021 1 Des. Docs
Can we get a copy of the Design Analysis. Design analysis will be uploaded to beta.sam.gov B1013_Type B3_IFC_DA-20_0312_Redacted.pdf The DA is not part of the contract documents and is provided for background information only.
6/22/2021 2 Specs/Drwg
There is a conflict between the specifications (21 30 00.2.2) and the drawings (FX-507) regarding the working pressure of the fire pump. The specifications state 2500 GPM @ 165 PSI and the drawings state 2500 GPM @ 125 PSI. Could you please clarify which is correct?
Please refer to the specifications for the preliminary pump capacity requirements, 2,500 gpm with a rated net pressure of 165 psi. Exact pump sizing to be determined by the contractor.
6/28/2021 3 Specs/Drwg Specification Section 21 13 13 § 2.10.2: May escutcheons be two-piece adjustable in lieu of one-piece?
Pendent sprinkler escutcheon's shall be one-piece metallic type as indicated by project specifications.
6/28/2021 4 Specs/Drwg
Specification Section 21 13 13 § 3.4.1: Drawing S-001 Identifies the Seismic Design Category as Group B. UFC 3-600-01 § 9-7.10.3 states Seismic restraint is not required for seismic design category A or B. UFC 4-211-01 § 3-6.12.1 and 3-6.17.3 Only require the foam/water piping and generators be braced, not the wet-pipe sprinkler system. Is the wet-pipe sprinkler system required to be braced?
No, the wet-pipe sprinkler system is not required to be seismically braced.
6/28/2021 5 Specs/Drwg
Specification Section 21 13 20 § 2.5.1.1 only requires the pipe to be rated for 300 psi.
Specification Section 21 13 20 § 2.5.1.2 requires grooved fittings and couplings to be rated for 500 psi. May grooved fitting requirement be reduced to 300 psi?
Grooved fittings and associated couplings may be reduced to 300 psi, pending final calcultions indicate working pressure less than 300 psi.
6/28/2021 6 Specs/Drwg Specification Section 21 13 20 § 2.5.5: With the foam additive, shouldn’t the backflow preventer be of the Reduced Pressure Zone principle?
Backflow preventer shall be of the reduced pressure type as indicated on FX506 and in accordaance with UFC 3-600-01, Section 9-6.6.2.
6/28/2021 7 Specs/Drwg Specification Section 21 30 00 § 2.4.4.1. May butterfly valves be utilized downstream of the fire pump?
Butterfly valves are accepteable to be used downstream of fire pump. Refer to details on FX501.
6/28/2021 8 Specs/Drwg Drawing S-161 does not indicate any roof structure improvements in the HEF Room
106. Will any structural improvements be required to this roof in order to support the sprinkler piping exiting this room?
It is not anticipated that retrofitting the roof structure will be required. This will be verified when final suppression design and routing is submitted.
6/28/2021 9 Specs/Drwg
Guernsey Preliminary Suppression Calculation Page 2 of 2 references 11.2k sprinklers IAW UFC-3-600-01 Table 9-3. UFC 3-600-01 § 9-7.3.1 identifies Table 9-3 as applying to “non-storage occupancies. UFC 4-211-01 does not address sprinkler k-factors in a hangar. NFPA-409 § 6.2.4.6 requires sprinkler to be if 5.6k or 8.0k. Please confirm sprinkler orifices are to be sized in accordance with NFPA-409.
Overhead sprinklers for hangar bay shall be a minimum 5.6K.
6/28/2021 10 Specs/Drwg
Plan Sht. M101 Shows VE-1 through VE5, Sht. M501 Number 13 shows Vacuum Exhaust Details, Sht. M601 HVAC Schedule does not show any Vacuum Exhaust Fans, but reference is mad to them in the Infrared Heating Schedule remark section. Please provided a Vacuum Exhaust Fan Schedule.
Refer to Infrared Heating Schedule for VE fan sizing. VE fan should be purchased as part of Infrared Heating Unit.
6/29/2021 11 Drwg
Drawing FX001 General Fire Suppression Notes Item # 8 – States, all fire suppression above ground piping shall comply with NFPA #13.
Item # 19 – States, Schedule 40 pipe minimum for above ground pipe.
Section 21 13 13.00 10 Wet Pipe Sprinkler System, Fire Protection Part 2 Products
2.5.1.1 Steel Pipe allows schedule 10 pipe, also NFPA # 13.
NFPA# 13 allows schedule 10 pipe for sprinkler systems.
Question – Is schedule 10 pipe allowed for the wet pipe sprinkler system for this project?
No, sprinkler piping shall be schedule 40 in accordance with ANG ETL 15-01-03, Section 7.4.1
7/2/2021 12 A-401/ Specs 10
28 13
Toilet Accessories spec section 10 28 13 does not include all of the items that are listed on the Accessory Schedule on page A-401. Please provide specifications for all items listed on schedule that are to be included in the contract
Base standard for tissue dispenser is LoCor SKU D67021 stainless side-by-side bath tissue dispenser.
Base standard for paper towel dispenser is LoCor SKUD68004 stainless mechanical hardwound roll towel dispenser Base standard for soap dispenser is Dial Fit universal manual dispenser, slate-1.2L.
All other bathroom accessories should match what is on the drawings A-401 schedule.
7/2/2021 13 A-401/ Specs 10
28 13
Toilet Accessories spec section 10 28 13 lists “Accessory Items” in paragraph 2.2.
Each item is followed by a letter in parenthesis. These letters do not coincide with Accessory Schedule on A-401. What do these letters indicate?
use the drawing A-401 schedule for correct accessories and RFI #12 answered above.
7/2/2021 14 A-401/ Specs 10
28 13
Accessories Schedule on page A-401 of the plans lists Mark “C” as a soap dish.
However, the specs and Room Elevation #2 show it as a soap dispenser. Please verify which is needed.
Soap dispenser See RFI #12 answered above.
7/2/2021 15 Specs/Drwg Is this project tax exempt? If so, will the government provide a tax-exempt form to the awarded contractor so that they may provide it to their subcontractors?
No. Not tax exempt.
7/2/2021 16 Specs/Drwg
Is the offeror responsible for relocating any owner equipment within the hangar that is not being demolished? If so, please provide a detailed list of what items are to be relocate and where those items are to be relocated to.
As shown on AD-121 and A-121 there is a hydraulic lift. Coordinate with government on storage. Can be stored in the hangar so long as it does not interfere with construction. Government can provide alternate storage location, but removal and reinstall will be the responsibility of the contractor.
7/2/2021 17 Specs/Drwg Is there any requirement for storing onsite or offsite owner equipment during renovation activities?
See RFI #16
7/2/2021 18 Specs/Drwg
Is there a proprietary contractor that is responsible for the fire alarm system in the hangar?
UFC 3-600-01 for HEF systems does require that any Air Force/ ANG agency use certain equipment to make the system completely functional. See spec section 28 31
7/2/2021 19 Specs/Drwg
Is there a proprietary contractor that is responsible for the fire suppression system in the hangar?
UFC 3-600-01 for HEF systems does require that any Air Force/ ANG agency use certain equipment to make the system completely functional. See spec section 21 13
20.00 30
7/2/2021 20 Specs/Drwg Is there a proprietary contractor that is responsible for the Direct Digital Controls (DDC) system in the hangar?
Existing DDC system is by Johnson Controls, and new system must tie into existing to be functional.
7/2/2021 21 Specs/Drwg Is there a proprietary contractor that is responsible for the security or access control system in the hangar?
Existing Access controls on base use Advantor equipment and new system must tie into existing to be functional.
Pre-Bid RFI Log for W50S8T-21-B-0001 14-2003 BLDG 1013 Renovation
(Sect/Para/Page)
QUESTION GOVERNMENT RESPONSE
Pre-Bid RFI Log for W50S8T-21-B-0001 14-2003 BLDG 1013 Renovation
7/2/2021 22 Specs/Drwg
The SOW document, paragraph 3.1.22 states to perform lead-based paint survey on facility to determine presence of hazardous materials. Drawing A-001, General Note E, states that lead-based paint surfaces will be disturbed as part of this work, and that Contractor shall properly remediate all hazardous materials prior to commencing work.
Offerors cannot competitively and accurately bid this scope of work. Please either confirm that a survey is to be included in the bid, and that if hazardous materials are discovered, abatement services will be covered under a differing site condition contract modification or provide the hazardous materials survey so offerors and their abatement subcontractors can accurately price this scope.
See Addendum #001, 02 83 00.1 Lead Based Paint Sampling Report.
In the event that the recommendation cannot be followed the contractor should notify the contracting officer before proceeding.
7/2/2021 23 Specs/Drwg
Please indicate if there are any hazardous materials on this project that require abatement, to include but not limited to lead, asbestos or contaminated soil. And, if so, please indicate the location and quantity (e.g., linear footage, square footage, cubic yards, etc.).
SOW 5.1 states "Reference Attachment 3 for Lead-Based Paint Sampling report and recommendations. There are currently no other known or identified hazardous materials within building 1013. The specifications being provided as part of the Type B design will include a statement for work for lead remediation."
Recommendation on lead based paint is "that all paint remain on the doors/door frames and disposed as constructiondebris. In the event paint is stripped from the doors and/or door frames, proper protocols should be followed for removal and disposal."
Lead Baed Paint Sampling report has been added as an attachment to 02 83 00 via Addendum #001.
In the event that the recommendation cannot be followed the contractor should notify the contracting officer before proceeding.
7/2/2021 24 Specs/Drwg Is there an underground utility map available for offerors to review prior to bidding? If so, would the GOV please provide?
underground utilities are shown multiple civil drawing in the complete drawing set.
7/2/2021 25 Specs/Drwg
Are there any known activities from the airfield or ANG Base that would cause construction to be shut down? If so, please indicate when and for how long those shutdowns are required.
No.
7/2/2021 26 Specs/Drwg
Section 01 32 17.00 20, Cost Loaded Network Analysis schedules, calls for requirements not commonly found on ANG projects. For example, are monthly schedule update meetings (MPMs) going to be used on this project? Is a dedicated scheduler required? Will monthly payment applications include the updated schedule, along with the seven (7) schedule reports and files, schedule narrative, and native scheduling file along with SDEF? Typically, in our experience, a PDF schedule submission satisfies the requirements. Please advise.
Weekly progress meetings will be held, and typically are less than 1 hour.
A dedicated scheduler is not required.
Schedule will need to be updated when it changes.
Not familiar with the 7 schedule reports and files so not required.
Schedule narrative, native scheduling and SDEF not required.
Monthly pay applications with updated AF 3065 are required.
PDF schedule or AF 3064 will be acceptable schedules
7/2/2021 27 Specs/Drwg What is the government review time for submittals? 14 working days
7/2/2021 28 Specs/Drwg What is the government response time for answering RFIs? 14 working days
7/2/2021 29 Specs/Drwg
Section 01 33 29 requires significant submittal, tracking and documentation efforts for sustainability features. In an effort to reduce cost, would the GOV please consider removing this specification section, or at a minimum, the formal submittals, to include the Preliminary High Performance and Sustainable Building Checklist; Sustainability Action Plan; Preliminary Sustainability eNotebook; Final High Performance and Sustainable Building Checklist; Final Sustainability eNotebook; Amended Final Sustainability eNotebook; and Amended Final High Performance and Sustainable Building Checklist
Sustainability requirements can be removed.
7/2/2021 30 Specs/Drwg Is there a height restriction for use of a crane on this project? If so, what is that height restriction
FAA study will need to be submitted to determine.
7/2/2021 31 Specs/Drwg Will there be any temporary airfield lighting or barricades required to be provided by the Offeror during this project?
No. But FOD protection will be critical.
7/2/2021 32 Specs/Drwg Please confirm that Competent Persons listed in Section 01 35 26 can be from either the Prime Contractor or the subcontractor performing the work.
Yes either.
7/2/2021 33 Specs/Drwg
Section 01 35 26 calls for a temporary roof access stairway and debris chute scaffolding. Will ANG allow Offerors alternative methods for safely accessing the roof, such as equipment, in lieu of erecting scaffolding?
Yes other methods are approved so long as they will not create a FOD problem for the airfield.
7/2/2021 34 Specs/Drwg Is there existing fall protection tie-offs on the existing roof that personnel can utilize during the roof replacement scope?
No.
7/2/2021 35 Specs/Drwg
Section 01 45 00.00 10, paragraph 3.4.2 states that the CQC System Manager must be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this Contract.
Will ANG please also accept a CQC System Manager with no degree, but 10 years of relevant construction experience?
Yes
7/2/2021 36 Specs/Drwg
Please confirm that all required utilities needed for construction (power, water, etc.)
will be provided by ANG at no cost to the Contractor. If not, please identify which utilities are not available to the contractor and what is the usage cost so that we can include in our estimate
If the contractor wishes to set up a job trailer the base will provide a site. Utilities will be provided by the contractor coordinating with utility providers. The base is not a utility provider.
7/2/2021 37 Specs/Drwg Please expand on the requirements for the project identification sign as stated in Section 01 50 00, paragraph 2.1.2.
follow guidance in EM 385-1-1
7/2/2021 38 Specs/Drwg
Will the jobsite trailers and administrative field offices required in section 01 50 00, paragraphs 3.5 and 3.5.2 need to hold GOV and DOR personnel during progress or project meetings or can owner-related meetings be held in GOV facilities?
Meetings can be held in GOV facilities. The contractor can plan on using B1013 if it will not interfere with construction and if it is preferred over seting up a job trailer.
7/2/2021 39 Specs/Drwg Please confirm that all bid packages will be opened at bid time and apparent low bidders will be identified at bid time.
Yes
(Sect/Para/Page)
QUESTION GOVERNMENT RESPONSE
Pre-Bid RFI Log for W50S8T-21-B-0001 14-2003 BLDG 1013 Renovation
7/2/2021 40 Specs/Drwg Please confirm that the Environmental Manager required in Section 01 57 19, paragraph 1.5.4 can have dual roles on the project.
Yes
7/2/2021 41 Specs/Drwg
Due to the size and location, please confirm that there are no environmental permits required on this project, to include but not limited to NOI/NOT, SWPPP or 404 Permit.
Project may require NOI/NOT and SWPPP plans. Refer to Gneral Note 1 on C-200.
Contractor is responsible for all permits and associated fees. A 404 permit is not anticipated.
7/2/2021 42 Specs/Drwg
Please confirm that the HVAC system and Building Automation System are the only two systems to be commissioned, and that the Commissioning Agent and all commissioning services falls on the Prime Contractor to provide. The reason we ask is because 01 90 00 calls for only HVAC and Building Automation Systems, but Section 21 90 00, Fire Protection System Commissioning is included in the project
HVAC and Building Automation System are required to be commissioned as well as the Fire protection system. HVAC and Building Automation systems will use a commissioning agent as described in spec section 01 90 00. Fire protection commissioning shall use an FPE as described in spec section 21 90 00. The Fire Protection system will also require coordination with the AHJ as well as a QFPE to commission the system.
7/2/2021 43 Specs/Drwg
The specification Section 01 32 17.00 20 require P6 for scheduling, but the solicitation document requires AF 3064 and AF 3065 for progress reporting. Please confirm that the Section 01 32 17.00 20 takes precedence in lieu of the AF 3064 AND sf 3065.
AF 3064 Contract Progress Schedule and AF 3065 Contract Progress Report will be required in lieu of all the P6 requirements.
7/2/2021 44 Specs/Drwg
Are there any city or county permits required on this project? If so, please state which permit(s), to include cost/fees.
Coordination with OKC will be required when connecting to their waterline. The government does not determine these costs.
A crane permit or FAA Aeronautical Survey will be required prior to any crane work.
The process is layed out in section 7 of the SOW.
7/2/2021 45 Specs/Drwg
On drawing C-151 in the SE corner of the drawings, the actuated isolation valve is partially covered by a concrete ADA landing. Please evaluate and provide direction if the precast cover impacts the ADA sidewalk and landing, as it appears both are at the same elevation and, once the landing is placed, no one could access the actuated isolation valve.
place as shown, manhole lid is at the same elevation as the landing. Valve will be accessed through the manhole lid.
7/2/2021 46 Specs/Drwg
On A141, drawings state no equipment to be placed within 2 feet of fan blades. The existing cranerail is within two feet and there will be equipment installed on the roof within two feet. Is this going to be an issue? (Does fall protection connecting to joist go on top or underside of roof?
The equipment on the roof and fall arrest systems will not impact the fan blades as designed.
7/2/2021 47 Specs/Drwg
Confirm all interior miscellaneous and structural steel gets painted. A vinyl-faced insulation system will be installed at the interior face of all exterior walls and a metal liner panel system extends to 10' above the stem wall. A dry-fall paint system will be used at all exposed roof deck, exposed structure, exposed ductwork, exposed equipment piping, conduit, hangars, draft curtains, etc.
7/2/2021 48 Specs/Drwg
Verify all existing wall panel do not require new paint or any other work. The only metal wall panel scope is associated with the infill on the hangar doors. It is unclear as to the extent of work required for the existing metal wall panels.
A vinyl-faced insulation system will be installed at the interior face of all exterior walls and a metal liner panel system extends to 10' above the stem wall. Exterior metal panels to be prepped and painted.
7/2/2021 49 Specs/Drwg
Drawing A-302 appears to show the three large “BigAss” fans at the same elevation of the existing cranerails, just north of gridline 6. On Drawing A141, it shows the fans going beyond the cranerails. We believe there is a conflict. It could be easily resolved by lowering the fan, but we’d like the owner and DOR to review and provide direction.
It shows the 2' clear line extending beyond the crane rails. The fan blades do not extend into on plane view, but they are not at the same elevation. Crane rails are at 30' 11-3/4", and fan blades are below at 30'.
7/2/2021 50 Specs/Drwg
Drawing A121 shows interior liner panels along the perimeter wall, with the exception of hangar door. There is no specification section for this item. Please provide the specification for this scope of work
Basis of design for this panel is Berridge "FW-1025" Material: 24 Ga. Steel Texture: Smooth Color: White Concealed Fasteners Provide factory color matched closure trims.
7/2/2021 51 Specs/Drwg
The perimeter walls all receive insulation. The specification states to refer to the plans for the R-value, but we cannot locate the R-value. Please indicate the R-value for this insulation.
Wall and roof insulation is to meet the requirements of ASHRAE 90.1.
Minimum value for the walls is R-13.
7/2/2021 52 Specs/Drwg
Drawing A-201, General Note A states that all exterior painting needs to be tarped.
This is a very expensive requirement. Would ANG please consider removing this note and requiring painting scope to be performed only during low-wind days?
Contractor will be responsible for any damage caused by overspray during painting operations. Government will not require use of a tarp howerver the contractor will accept liablility for any damage caused by not using a tarp.
7/2/2021 53 Specs/Drwg
Section 07 27 10.00 10 calls for an air barrier system. The specs state that only 5,500- SF of area requires this air barrier system, and it lists applicable office/room numbers.
However, there is no material or product called out in the specifications. Also, the drawings do not clearly show the extent of the air barrier. Please provide more information regarding this scope of work so that Offerors understand the full scope of work. Please indicate the product type (manufacturer, etc.), and specific locations where this item is to be placed.
Remove specification section 07 27 10.00 10 from the project.
7/2/2021 54 Specs/Drwg Is the spray-applied fireproofing material to only go on areas shown on Detail 2, on A- 322?
Specifically for this area yes. Additionally firestopping material will be required on any penetration through any fire wall.
7/2/2021 55 Specs/Drwg
Drawing A-322, Detail 2 show a note, “Void forms between girt and column at back face of exterior wall panel as it turns the corner”. Please explain this requirement. The only void forms we’re familiar with are associated with concrete below grade.
does not refer to "void form" as used in structural concrete to create a void rather refers to a gap that will be created whent the new wall will be built.
7/2/2021 56 Specs/Drwg
Does the interior exposed ductwork need to be painted? Keyed note 1 A-141 "DRY FALL PAINT SYSTEM AT EXPOSED ROOF DECKS, EXPOSED STRUCTURE, EXPOSED DUCTWORK, ALL EXPOSED EQUIPMENT
PIPING, CONDUIT, HANGERS, DRAFT CURTAINS ETC."
7/2/2021 57 Specs/Drwg
Bullet 3.1.20 in the SOW Document states to provide support system for pressure washers at the aircraft wash rack. We cannot locate where the supports are, what the supports looks like (size, material, etc.), and we cannot locate an aircraft wash rack.
Please advise accordingly.
Refers to EWH's listed in plumbing drawings.
7/2/2021 58 Specs/Drwg
Note 3.1.8 in the SOW Document states to integrate two adjacent apron lighting towers into the facility power. Is the GOV referring to the two pole lights on the southwest and southeast corner of the hangar?
Yes
(Sect/Para/Page)
QUESTION GOVERNMENT RESPONSE
Pre-Bid RFI Log for W50S8T-21-B-0001 14-2003 BLDG 1013 Renovation
7/2/2021 59 Specs/Drwg EP-102, Keynote #4, it references Drawing P-201 for location of existing aerial power.
Drawing P-201 does not appear to exist. Please clarify.
Should reference to drawing P-102.
7/2/2021 60 Specs/Drwg
The drawings include a statement about coordinating location of CCTVs with owner.
However, there does not appear to be any requirements, and no specification, for CCTV or any security requirements, to include access control. Please confirm that there are requirements for CCTV systems, access control, security systems, etc.
The only requirement would be to work around existing CCTV cameras, and identify if power or cables are interfering with construction activities.
7/2/2021 61 Specs/Drwg There are two telecommunication drawings, but no telecommunication specs. Please provide the specifications for the scope of work called for in the telecommunication drawings.
Construction will include pathways for communications only. Cabling to be provided by others. Follow instructions on drawings.
7/2/2021 62 Specs/Drwg Who is the manufacturer of the existing hangar door? Please provide name and contact information.
we don’t know?
7/2/2021 63 Specs/Drwg Is the existing hangar door under warranty? If so, who is providing the warranty?
(Please provide name and contact information.)
No.
7/2/2021 64 Specs/Drwg Is there a maintenance contract with the hangar door? If so, please provide name and contact information.
No.
7/2/2021 65 Specs/Drwg Please expand and provide more information regarding the new fall arrest system being provided.
Fall arrest systems will be for ladders to the mechanical mezzanines on hangar floor, and for ladders on the roof. There will also be anchors installed during the roof work.
7/2/2021 66 Specs/Drwg Please confirm that rooms 106, 103, 105, 107A, 107B, 111, 111A, 108, 112, 114, and 109 are unclassified areas. If so, is it acceptable to use EMT in these areas?
Yes EMT can be used. Except in equipment rooms - 106 (HEF Room) and 109 (Mech/Elec Room) as required in specification 26 20 00, para 3.1.5.1 c.
7/2/2021 67 Specs/Drwg
C-111 indicates installation of a new OG&E transformer. Is the existing transformer pad sufficiently sized for the new equipment? If not, please provide the required dimensions for equipment pad modification.
Yes as previously coordinated with OG&E.
7/2/2021 68 Specs/Drwg C-112 identifies minimal fence work. Please provide applicable specification. Use drawings and match existing fence.
7/2/2021 69 Specs/Drwg
C-111 and C-112 identifies traffic signage to comply with MUTCD Standards. Please provide applicable standard. Also, please confirm the only traffic signs are located at the two (2) ADA parking spaces
MUTCD is the applicable standard.
7/2/2021 70 Specs/Drwg A-601 identifies work associated with the existing hangar door. Please provide applicable specification.
Work on hangar door is identified on drawings to be painting, replacing weather seals, and upgrading motors and electrical.
7/2/2021 71 Specs/Drwg Are the WF-4916 drawings still current with the City of OKC (i.e., not expired)? The city is aware of the project and has reviewed finding no errors. Final coordination with OKC still needs to be done prior to construction of water lines.
7/2/2021 72 Specs/Drwg
S-111, Keynote #1 identifies demolition of existing suspended concrete slab. Is there any as-built information for this existing condition? If yes, could you please provide applicable information?
Area indicated to be removed is shown on as-builts to have #4 rebar @12'O.C. each way and tied into footings with #3 rebar on all 4 sides.
7/2/2021 73 Specs/Drwg
A-522, Detail 5 provides a detail for the draft curtain. Is there a specification for the draft curtain available? If not, please provide additional information for the materials (e.g., panel profile, gauge/thickness of materials identified, etc.).
Basis of Design is Berridge “R” Panel exposed fastener panels.
24 Ga.
Finish: Smooth Color: White Provide factory trims and closures as required.
7/2/2021 74 Specs/Drwg
A-141, Keynote #6 and A-201, Keynotes #10 and #14 state to infill with metal wall panels that match existing adjacent wall panel profiles and thicknesses. Is there any as-built information for this existing wall panels? If yes, could you please provide applicable information?
The only information on the as-builts is the panels are "corrugated metal siding."
7/2/2021 75 Specs/Drwg
61. A-201, Keynote #12 identifies new metal building sign and paint color identified on the exterior finish schedule. Notes mention to match the original building sign, size, font style, depth, and mounting style. Please provide applicable specification, details, dimensions, etc.
Each capital letter to be anywhere from 18" to 24" tall.
Font shall be Helvetica Neue bold type Lettering shall be as shown on drawings and centered where shown.
Mounting shall be up to sign fabricator.
7/2/2021 76 Specs/Drwg E-601 panels MDP and LDP appear to overlap each other. Please provide legible sheet. Concur- See Addendum #001 for corrected drawing.
7/2/2021 77 Specs/Drwg
T-101 Keynote #2 states communication cabling by others. Is this applicable to the underground site communication work as well?
All cabling for base network system done by others. Any cabling or communications needed for HVAC DDC controls or fire alarm communications is to be included in this construction. Underground pathways are also to be included where indicated.
7/2/2021 78 Specs/Drwg
Spec 10 14 0.20 para 1.3 identifies extra materials required for the interior signage.
Please provide clarifications for the following:
a. Paragraph refers to blank plates for sign type SN4 and SN 3 /2?
i. SN4 is only one plate, so not sure what blank refers to? For SN 3 / 2 – Would a blank plate be for the room number area?
b. Paragraph refers to sign type SN7 – No sign exists in the plans.
c. Copy of Software – Does this mean we are to provide an actual copy of a software program or just the file to generate updated printed messages?
Omit Section 1.3 Extra Materials from the specification. The blank plates and software described are not required.