This solicitation requests proposals for the renovation of Building 1013 at Will Rogers Air National Guard Base in Oklahoma. Key work includes updating the electrical service and distribution; replacing the roof; repairing and removing the hangar doors and trolley system; painting the interior and exterior; upgrading HVAC; replacing flooring throughout; reconfiguring the hangar space; and installing a HEF and wet pipe fire suppression system including a new pump house and site work. Offerors must submit proposals by the date specified to be considered for award of the firm-fixed-price construction contract, which is being issued by the Department of the Army National Guard. The opportunity is set aside for small businesses.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 001
Date Issued: July 12, 2021
Project: Renovate Fuel Cell Hangar – Building 1013 Will Rogers Air Guard Base, OK Client Contract Number: YZEU142003 Guernsey Project Number: OK70157-003
Distribution: Mr. Daniel Tatro Contracting Officer
CC: SMSgt Christine Walker SMSgt Conrad Cruze Design Team
Prepared By: Weston McCann Guernsey Project Manager
Re: Bidder RFI Updates
Items in this Addendum take precedence over the original Construction Documents dated March 12, 2020. Items not specifically revised remain in effect.
Construction Drawing Revision Summary:
Sheet Sheet Title Description Summary
E-601 One-line & Schedules
Shift panelboard MDP schedule to the left for readability
Specification Revision Summary:
Section Specification Title
Description Summary
02 83 00 Lead Remediation Add 02 83 00.1 Lead Based Paint Sampling Report as attachment to project specification
EXISTING UNDERGROUND
MEDIUM VOLTAGE
WEST
HANGAR
DOOR
MDP
LDP
A C
12.47 kV 300 kVA 480Y/277
480/277
112.5 kVA 208Y/120
5 6
PUMP BLDG
FEEDER
T1
PORTABLE
GENERATOR
CONNECTION
MTSSPD
TO B/1033 & B/1056
M
SMART
METER
SPD
J
EAST
HANGAR
DOOR
400A
480/277V WYE
3PH 4W
400A
120/208V WYE
3PH 4W
225A
120/208V WYE
3PH 4W
225A
120/208V WYE
3PH 4W
H1 H2
8 9
100A
120/208V WYE
3PH 4W
100A
120/208V WYE
3PH 4W
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
D A
T E
P R
O
JE
C T
N O
O K
LA
H
O M
A A
IR
N
A T
IO
N
A L
G U
A R
D R
E N
O V
A T
E F
U E
L C
E
LL
H A
N G
A R
B
U
IL
D
IN
G
W
IL
L R
O G
E R
S A
IR
G
U A
R D
B A
S E
C .A
. E N
G
IN
E E
R
IN
G
E
X P
IR
E
S J
U N
E
0, C .A
. A R
C H
IT
E
C T
U R
E
E
X P
IR
E
S J
U N
E
0, C .H
. G U
E R
N S
E Y
C
O M
P A
N Y
N . G
R A
N D
B
LV
D
O K
LA
H
O M
A C
IT
Y
, O K
.4
.8
/1
/2
:4
:5
A
M C
U s e rs
\T L u c y \D o c u m e n ts
\R
-0
E tr is ta n .l u c y .r v t
M
A R
G . L
Y N
N
T . L
U C
Y
E-601
O K
7-
O N
E -L
IN
E
S
C H
E D
U
LE
S
BREAKERS SERVING FIRE PROTECTION SYSTEMS SHALL BE RED IN COLOR.
CIRCUITS MARKED EX ARE TO BE ADDED FROM AN EXISTING PANEL.
CIRCUIT 26 SHALL HAVE HANDLE LOCK "ON" DEVICE.
Notes:
Future Est. Demand: 110982 VA
Total Est. Demand Current: 257 A
PANEL 2600 VA 100.00% 2600 VA Total Conn. Current: 324 A
Existing Panel 3000 VA 100.00% 3000 VA Total Est. Demand: 92485 VA
MOTOR 80% 87944 VA 80.00% 70355 VA Total Conn. Load: 116604 VA
RECEPTACLES 23060 VA 71.68% 16530 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
New Amps: 368 A 328 A 287 A
New Load: 43440 VA 38750 VA 34413 VA
83 -- -- -- 0 0 -- -- SPACE 84
81 -- -- -- 0 0 -- -- SPACE 82
79 SPD 30 A 3 0 0 -- -- SPACE 80
77 SPARE 20 A 1 0 0 -- -- SPACE 78
75 SPARE 20 A 1 0 0 -- -- SPACE 76
73 SPARE 20 A 1 0 0 -- -- SPACE 74
71 SPARE 20 A 1 0 0 1 20 A SPARE 72
69 -- -- -- 0 0 1 20 A SPARE 70
67 -- -- -- 0 0 1 20 A SPARE 68
65 SPARE 20 A 3 0 0 1 20 A SPARE 66
63 -- -- -- 0 0 -- -- -- 64
61 -- -- -- 0 0 2 20 A SPARE 62
59 SPARE 20 A 3 0 0 -- -- -- 60
57 SECURITY GATE (EX) - PANEL D 20 A 1 0 0 2 20 A SPARE 58
55 VIDEO CAMERA (EX) - PANEL D 20 A 1 0 1500 -- -- -- 56
53 -- -- -- 7151 1500 2 40 A DET-TRONICS FA UPS 54
51 -- -- -- 9694 13827 -- -- -- 52
49 PANEL C 225 A 3 12095 13353 -- -- -- 50
47 ERV CONTROL PANEL 20 A 1 500 13777 3 225 A PANEL A 48
45 DDC CONTROL PANEL 20 A 1 500 0 1 20 A BOLLARDS (EX) - PANEL D 46
43 VF-2 MOTORIZED DAMPER 20 A 1 250 0 1 20 A FIRE SIREN (EX) - PANEL D 44
41 EF-1 20 A 1 696 250 1 20 A VF-3 MOTORIZED DAMPER 42
39 -- -- -- 2912 500 1 20 A FLUSH VALVES/LAV POWER 40
37 CU-2 20 A 2 2912 250 1 20 A MOTORIZED DAMPER 38
35 -- -- -- 562 250 1 20 A MOTORIZED DAMPER 36
33 STORAGE OVERHEAD DOOR 20 A 2 562 562 -- -- -- 34
31 EWH-1 20 A 1 1500 562 2 20 A OVERHEAD DOOR 32
29 -- -- -- 667 2000 1 20 A ERV-1 30
27 -- -- -- 667 1176 1 20 A VF-1 28
25 CH-1 20 A 3 667 1600 1 20 A DET-TRONICS POWER 26
23 UH-3 20 A 1 250 720 1 20 A RECEPTACLES 24
21 -- -- -- 1352 250 1 20 A UH-4 22
19 CU-3 20 A 2 1352 600 1 20 A UH-1 & 2 20
17 -- -- -- 2250 0 1 20 A X-RAY PROCESSOR (EX) - PANEL D 18
15 COMM ROOM POWER 30 A 2 2250 300 1 20 A CORRIDOR 111 EWC 16
13 COMM ROOM S QUAD RECEPTACLE 20 A 1 1000 1000 1 20 A COMM ROOM N QUAD RECEPTACLE 14
11 RECEPTACLES 20 A 1 720 720 1 20 A RM 106 DUPLEX RECEPTACLES 12
9 MISC. RECEPTACLES RM 111,107,&114 20 A 1 1080 720 1 20 A RM 109 E DUPLEX RECEPTACLES 10
7 RM 108 E BENCH RECEPTACLES 20 A 1 1200 1200 1 20 A RM 108 N BENCH RECEPTACLES 8
5 RM 105 NE BENCH RECEPTACLES 20 A 1 1200 1200 1 20 A RM 108 S BENCH RECEPTACLES 6
3 RM 105 W BENCH RECEPTACLES 20 A 1 1200 1200 1 20 A RM 105 NW BENCH RECEPTACLES 4
1 RM 105 SE BENCH RECEPTACLES 20 A 1 1200 1200 1 20 A RM 105 SW BENCH RECEPTACLES 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
CONTRACTOR TO PROVIDE A DETAILED PANEL SCHEDULE INCLUDING ROOM NUMBERS AFTER FINAL INSTALLATION.
Notes:
Enclosure: Type 1 MCB Rating: 400 A
Mounting: Surface Wires: 4 Mains Rating: 400 A
Supply From: T-1 Phases: 3 Mains Type: COPPER
Location: Space 15 Volts: 120/208 Wye A.I.C. Rating: 10000 A
Branch Panel: LDP
Notes:
PANEL 2600 VA 100.00% 2600 VA Future Est. Demand: 346209 VA
EYE WASH HEATERS 432307 VA 5.00% 21615 VA Total Est. Demand Current: 347 A
Existing Panel 3000 VA 100.00% 3000 VA Total Conn. Current: 919 A
MOTOR 80% 293414 VA 80.00% 234731 VA Total Est. Demand: 288508 VA
RECEPTACLES 23060 VA 71.68% 16530 VA Total Conn. Load: 764412 VA
LIGHTING 100% 10031 VA 100.00% 10031 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
New Amps: 926 A 904 A 936 A
New Load: 255666 VA 250389 VA 258357 VA
83 -- -- -- 0 0 -- -- SPACE 84
81 -- -- -- 0 0 -- -- SPACE 82
79 SPD 30 A 3 0 0 -- -- SPACE 80
77 SPARE 20 A 1 0 0 -- -- SPACE 78
75 SPARE 20 A 1 0 0 -- -- SPACE 76
73 SPARE 20 A 1 0 0 -- -- SPACE 74
71 SPARE 20 A 1 0 0 1 20 A SPARE 72
69 -- -- -- 0 0 1 20 A SPARE 70
67 -- -- -- 0 0 1 20 A SPARE 68
65 SPARE 20 A 3 0 0 1 20 A SPARE 66
63 -- -- -- 0 0 1 20 A SPARE 64
61 -- -- -- 0 0 1 20 A SPARE 62
59 SPARE 20 A 3 0 0 1 20 A SPARE 60
57 -- -- -- 0 0 1 20 A SPARE 58
55 -- -- -- 0 0 1 20 A EXISTING LOAD 56
53 SPARE 20 A 3 0 0 1 20 A EXISTING LOAD 54
51 -- -- -- 0 0 1 20 A EXISTING LOAD 52
49 -- -- -- 0 0 1 20 A EXISTING LOAD 50
47 SPARE 100 A 3 0 0 1 20 A EXISTING LOAD 48
45 -- -- -- 28682 0 1 20 A EXISTING LOAD 46
43 -- -- -- 28682 2494 -- -- -- 44
41 PUMP HOUSE 100 A 3 28682 2494 -- -- -- 42
39 -- -- -- 13000 2494 3 20 A CU-1 40
37 -- -- -- 13000 13000 -- -- -- 38
35 WEST APRON LIGHTING POLE - PANEL H1 (EX) 100 A 3 13000 13000 -- -- -- 36
33 -- -- -- 34413 13000 3 100 A EAST APRON LIGHTING POLE - PANEL H2 (EX) 34
31 -- -- -- 38750 1414 -- -- -- 32
29 LDP (VIA T1) 150 A 3 43440 1414 -- -- -- 30
27 -- -- -- 5820 1414 3 20 A MAU-1 28
25 -- -- -- 5820 1414 -- -- -- 26
23 AC-1 40 A 3 5820 1414 -- -- -- 24
21 WEST EXTERIOR LIGHTING 20 A 1 242 1414 3 20 A MAU-2 22
19 EAST EXTERIOR LIGHTING 20 A 1 194 340 1 20 A NORTH EXTERIOR LIGHTING 20
17 -- -- -- 2667 2324 1 20 A ADMIN LIGHTING 18
15 -- -- -- 2667 3142 1 20 A HANGAR LIGHTING 16
13 HANGAR DOOR (VIA MTS) 20 A 3 2667 3789 1 20 A HANGAR LIGHTING 14
11 -- -- -- 36026 36026 -- -- -- 12
9 -- -- -- 36026 36026 -- -- -- 10
7 EWH-4 175 A 3 36026 36026 3 175 A EWH-5 8
5 -- -- -- 36026 36026 -- -- -- 6
3 -- -- -- 36026 36026 -- -- -- 4
1 EWH-2 175 A 3 36026 36026 3 175 A EWH-3 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
CONTRACTOR TO PROVIDE A DETAILED PANEL SCHEDULE INCLUDING ROOM NUMBERS AFTER FINAL INSTALLATION.
Notes: PROVIDE SPD IN MDP.
Enclosure: Type 1 MCB Rating: 400 A
Mounting: Surface Wires: 4 Mains Rating: 400 A
Supply From: Phases: 3 Mains Type: COPPER
Location: Space 15 Volts: 480/277 Wye A.I.C. Rating: 10000 A
Branch Panel: MDP
NOT TO SCALE
ONE-LINE DIAGRAM
FEEDER SCHEDULE
FEEDER CONDUCTORS CONDUIT SERVING/REMARKS
1 (4) 500MCM 3" PVC EXISTING SERVICE LATERAL
2 (4) #2, #8 GND. 2" EMT FEEDER TO PUMP BUILDING
3 (4) 2/0, #4 GND. 2" EMT TRANSFORMER 1
4 (4) 500KCMIL, #3 GND. 3 1/2" EMT PANEL LDP
5 (4) 4/0, #4 GND. 2 1/2" EMT PANEL A
6 (4) 4/0, #4 GND. 2 1/2" EMT PANEL C
7 (4) #12, #12 GND. 3/4" EMT HANGAR DOOR M.T.S.
8 (4) #2, #8 GND. 1 1/2" RMC WEST APRON LIGHTING
9 (4) #2, #8 GND. 1 1/2" RMC EAST APRON LIGHTING
ALL LOADS SHOWN ARE REPRESENTATIVE OF NEW LOADS. RECONNECT ANY EXISTING LOADS THAT ARE NOT BEING DEMOLISHED TO THIS PANEL.
CIRCUITS MARKED EX ARE TO BE ADDED FROM EXISTING PANEL.
Notes:
Future Est. Demand: 39664 VA
Total Est. Demand Current: 92 A
Total Conn. Current: 114 A
Total Est. Demand: 33053 VA
MOTOR 80% 39517 VA 80.00% 31613 VA Total Conn. Load: 40957 VA
RECEPTACLES 1440 VA 100.00% 1440 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
New Amps: 115 A 111 A 116 A
New Load: 13777 VA 13353 VA 13827 VA
59 EXISTING LOAD 20 A 1 0 0 -- -- SPACE 60
57 EXISTING LOAD 20 A 1 0 0 -- -- SPACE 58
55 EXISTING LOAD 20 A 1 0 0 -- -- SPACE 56
53 EXISTING LOAD 20 A 1 0 0 -- -- SPACE 54
51 EXISTING LOAD 20 A 1 0 0 -- -- SPACE 52
49 -- -- -- 0 0 1 20 A SPARE 50
47 SPARE 20 A 2 0 0 1 20 A SPARE 48
45 -- -- -- 0 0 1 20 A SPARE 46
43 -- -- -- 0 0 1 20 A SPARE 44
41 SPARE 20 A 3 0 1900 1 20 A E2-AIR REEL 42
39 SPARE 20 A 1 0 1900 1 20 A E1-AIR REEL 40
37 EWH RECEPTACLES 20 A 1 360 1500 1 20 A SUMP PUMP 38
35 EAST IRH'S 20 A 1 750 1650 -- -- -- 36
33 -- -- -- 0 1650 2 20 A E1-208V REEL 34
31 -- -- -- 0 1080 1 20 A NORTH HANGAR DUPLEX RECEPTACLES 32
29 E. 440 PANEL (EX) - PANEL A 30 A 3 0 750 1 20 A FAR EAST IRH'S 30
27 -- -- -- 901 696 1 20 A VE-3 28
25 -- -- -- 901 696 1 20 A VE-4 26
23 EF-8 20 A 3 901 901 -- -- -- 24
21 -- -- -- 793 901 -- -- -- 22
19 -- -- -- 793 901 3 20 A EF-7 20
17 EF-4 20 A 3 793 562 -- -- -- 18
15 EF-3 20 A 1 600 562 2 20 A HANGAR E. OVERHEAD DOOR 16
13 HEF VALVE CONTROL BOX 20 A 1 1500 696 1 20 A VE-5 14
11 F-1 30 A 1 1920 1900 1 20 A E1-120V REEL 12
9 W1-120V REEL 20 A 1 1900 1650 -- -- -- 10
7 E2-120V REEL 20 A 1 1900 1650 2 20 A E2-208V REEL 8
5 -- -- -- 901 901 -- -- -- 6
3 -- -- -- 901 901 -- -- -- 4
1 CF-3 20 A 3 901 901 3 20 A CF-2 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
CONTRACTOR TO PROVIDE A DETAILED PANEL SCHEDULE INCLUDING ROOM NUMBERS AFTER FINAL INSTALLATION.
Notes:
Enclosure: Type 4 MCB Rating: 225 A
Mounting: Surface Wires: 4 Mains Rating: 225 A
Supply From: LDP Phases: 3 Mains Type: COPPER
Location: Space 17 Volts: 120/208 Wye A.I.C. Rating: 10000 A
Branch Panel: A
ALL LOADS SHOWN ARE REPRESENTATIVE OF NEW LOADS. RECONNECT ANY EXISTING LOADS THAT ARE NOT BEING DEMOLISHED TO THIS PANEL.
CIRCUITS MARKED EX ARE TO BE ADDED FROM EXISTING PANEL.
Notes:
Future Est. Demand: 28086 VA
Total Est. Demand Current: 65 A
Total Conn. Current: 80 A
Total Est. Demand: 23405 VA
MOTOR 80% 27681 VA 80.00% 22145 VA Total Conn. Load: 28941 VA
RECEPTACLES 1260 VA 100.00% 1260 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
New Amps: 104 A 84 A 60 A
New Load: 12095 VA 9694 VA 7151 VA
59 EXISTING LOAD 20 A 1 0 0 -- -- SPACE 60
57 EXISTING LOAD 20 A 1 0 0 -- -- SPACE 58
55 EXISTING LOAD 20 A 1 0 0 -- -- SPACE 56
53 EXISTING LOAD 20 A 1 0 0 1 20 A SPARE 54
51 EXISTING LOAD 20 A 1 0 0 1 20 A SPARE 52
49 -- -- -- 0 0 1 20 A SPARE 50
47 SPARE 20 A 2 0 0 1 20 A SPARE 48
45 -- -- -- 0 0 1 20 A SPARE 46
43 -- -- -- 0 0 1 20 A SPARE 44
41 SPARE 20 A 3 0 0 1 20 A SPARE 42
39 -- -- -- 0 1900 1 20 A W2-AIR REEL 40
37 -- -- -- 0 1900 1 20 A W1-AIR REEL 38
35 SPARE 20 A 3 0 0 -- -- -- 36
33 -- -- -- 0 0 -- -- -- 34
31 -- -- -- 0 0 3 30 A W. 440 PANEL (EX) - PANEL C 32
29 220 OUTLET (EX) - PANEL B 30 A 3 0 0 1 20 A POWER REEL (EX) - PANEL C 30
27 EWH RECEPTACLES 20 A 1 360 0 1 30 A REELS NO. 3&4 (EX) - PANEL B 28
25 W2-120V REEL 20 A 1 1900 750 1 20 A WEST IRH'S 26
23 -- -- -- 1650 0 1 30 A REELS NO. 1&2 (EX) - PANEL B 24
21 W1-208V REEL 20 A 2 1650 696 1 20 A VE-6 22
19 -- -- -- 901 696 1 20 A VE-1 20
17 -- -- -- 901 696 1 20 A VE-2 18
15 EF-6 20 A 3 901 750 1 20 A FAR WEST IRH'S 16
13 -- -- -- 793 562 -- -- -- 14
11 -- -- -- 793 562 2 20 A HANGAR W. OVERHEAD DOOR 12
9 EF-5 20 A 3 793 600 1 20 A EF-2 10
7 RM 104 DUPLEX RECEPTACLES 20 A 1 900 1650 -- -- -- 8
5 -- -- -- 901 1650 2 20 A W2-208V REEL 6
3 -- -- -- 901 1144 -- -- -- 4
1 CF-1 20 A 3 901 1144 2 20 A HP-1 2
CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT
CONTRACTOR TO PROVIDE A DETAILED PANEL SCHEDULE INCLUDING ROOM NUMBERS AFTER FINAL INSTALLATION.
Notes:
Enclosure: Type 4 MCB Rating: 225 A
Mounting: Surface Wires: 4 Mains Rating: 225 A
Supply From: LDP Phases: 3 Mains Type: COPPER
Location: Space 16 Volts: 120/208 Wye A.I.C. Rating: 10000 A
Branch Panel: C
KEYED NOTES:
1. CONNECT NEW GROUND BAR TO EXISTING GEC.
2. EXISTING UTILITY METER TO REMAIN.
3. EXISTING SMART METER TO BE RECONFIGURED FOR 480V SYSTEM AND RECONNECTED.
4. PRIMARY OUTAGE WILL AFFECT ADDITIONAL BUILDINGS INDICATED.
GENERAL NOTES:
1. OG&E CONTACT: MR. GREG GILLISPIE
PROJECT MANAGER, T&D OPERATIONS.
(405) 250-0131 GILLISGJ@OGE.COM
2. A.I.C. CALCULATIONS BASED ON 4.5% BUILDING ENTRANCE
TRANSFORMER IMPEDANCE. REFER TO PANEL SCHEDULES
FOR A.I.C. RATINGS.
M R
K D
E S
C R
IP
T
IO
N
D A
T E
B Y
A
D D
-1
-2
G L
Type B3 Issued For Construction Submittal March 12, 2020 Renovate Fuel Cell Hangar (Nose Dock) Bldg 1013
3 LEAD-BASED PAINT SAMPLING REPORT
02 83 00.1 Attachment
April 17, 2018
Lt. Col. Tom Current
Oklahoma Air National Guard
3535 Military Circle
Oklahoma City, OK 73111
RE: Lead-Based Paint Sampling at Building 1013, Oklahoma Air National Guard, Oklahoma
City, Oklahoma County, Oklahoma
Lt. Col. Current:
INTRODUCTION
Guernsey was tasked by the Oklahoma Air National Guard (OKANG) to collect Lead-Based Paint
(LBP) samples from doors, door frames, and hangar doors at Building 1013 located the Air
National Guard in Oklahoma City, Oklahoma County, Oklahoma. Guernsey professionals performed the sampling on March 28, 2018.
The LBP inspection employed destructive techniques to sample suspected LBP. Paint chip samples were collected from the hangar door, doors, and doorframes.
Based upon the LBP analytical results, all painted surfaces on the hangar doors, light brown interior doors/door frames, dark brown door/door frames, gray doors/door frames, and blue door/door frames contain levels of lead. Two of the painted surfaces (beige – outside of hangar door and off-white – inside of hangar door) had lead levels above the EPA action level of 5,000 parts per million (ppm).
It is recommended that all paint remain on the doors/door frames and disposed as construction debris. In the event paint is stripped from the doors and/or door frames, proper protocols should be followed for removal and disposal.
FIELD ACTIVITIES
In performing the LBP inspection, Guernsey uses recognized EPA and the Department of
Housing and Urban Development (HUD) protocols in the classification and collection of samples from suspected LBP. The types of structures that are covered under HUD are public housing, federally-owned housing, housing receiving federal assistance, and child-occupied facilities.
Since Building 1013 is an airplane maintenance hangar, it does not fall under the HUD rules.
However, should construction/demolition and debris handling/disposal activities occur, such activities must be performed in accordance with OSHA’s Construction Standards and EPA’s
Resource Conservation and Recovery Act (RCRA) regulations.
Initially, suspect LBP was grouped into homogeneous areas. Homogeneous areas are those which appear similar throughout in terms of color, texture, date of material application and use.
Delineation of homogeneous areas was accomplished through a thorough inspection process.
The delineation was accomplished through a visual inspection of the structure for suspect materials. Additionally, the physical condition, location, amount (e.g. square feet) of suspect LBP was noted. Based on the above criteria, random bulk samples were collected.
A total of six homogeneous areas of suspect LBP were identified. Once these areas were identified, representative samples of each homogeneous area were obtained for laboratory analysis. Figures 1 provides a layout of Building 1013 with LBP sampling locations identified.
During the bulk LBP inspection, each sample was assigned a unique identification number and placed in containers for transport to a laboratory for analysis. Each sample was identified by a 12-character code which was divided into 4 segments (OKANG-LBP-01-01):
• The first set of digits is the initials of the location (Oklahoma Air National Guard [OKANG])
• The second set of digits is the type of sample (LBP)
• The third set of digits is the homogeneous area number (01)
• The last two digits are sequential sample numbers within the homogeneous area (01)
All samples were transported under a Chain of Custody (COC) to the laboratory to maintain sample integrity. COC documentation is enclosed.
FINDINGS
A total of 11 bulk samples of suspect LBP were collected during the LBP inspection and submitted for laboratory analysis. Applicable regulations require that if any one sample from a homogeneous area tests positive for lead, the entire homogeneous area must be treated as LBP. Table 1 summarizes the analytical data for the LBP samples collected. Based upon the LBP analytical results, all painted surfaces on the hangar doors, light brown interior doors/door frames, dark brown door/door frames, gray doors/door frames, and blue door/door frames contain levels of lead. Two of the painted surfaces (beige – outside of hangar door and off-white – inside of hangar door) had lead levels above the EPA action level of 5,000 parts per million (ppm). Figure 2 provides a layout of Building 1013 with positive LBP locations.
RECOMMENDATIONS
It is recommended that all paint remain on the doors/door frames and disposed as construction debris. In the event paint is stripped from the doors and/or door frames, proper protocols should be followed for removal and disposal.
Should you have any questions or comments please contact me by phone at 405.416.8294, by cell at 405.850.6443, or by e-mail at angela.aikman@guernsey.us.
Sincerely, Guernsey
Angela Aikman, CIE Project Manager/Environmental Scientist
Cc: Mr. Weston McCann, Guernsey
Enclosed:
Table
Figures
Analytical results and chain-of-custody from Quantem mailto:angela.aikman@guernsey.us
Table 1
Summary of LBP Analytical Results Oklahoma Air National Guard – Building 1013
Oklahoma City, Oklahoma
Sample Number Description
Detection of Lead (EPA Action Level
5,000 parts per million [ppm])
OKANG-LBP-01-01 Beige – Outside of Hangar Door 6,130
OKANG-LBP-01-02 Beige – Outside of Hangar Door 1,750
OKANG-LBP-02-01
Light Brown Interior Door/Doorframes
OKANG-LBP-02-02
Light Brown Interior Door/Doorframes
OKANG-LBP-03-01 Dark Brown Door/Doorframes 98.0
OKANG-LBP-03-02 Dark Brown Door/Doorframes 1,640
OKANG-LBP-04-01 Off-white Inside of Hangar Door 139
OKANG-LBP-04-02 Off-white Inside of Hangar Door 14,000
OKANG-LBP-05-01 Gray Doors/Doorframes 1,820
OKANG-LBP-05-02 Gray Doors/Doorframes 327
OKANG-LBP-06-01 Blue Doors/Doorframes 323
B
P S
A M
P L
E L
O C
A T
IO
N
M A
P
FI
G U
R E
P R
EP
A
R
ED
B Y
A P
P R
O V
ED
B
Y
D A
TE
JO
B
N O
EE
F
AL
A
AP
R
IL
O
K L A
H O
M A
A
IR
N A
T
IO
N A
L G
U A
R D
LA
H O
M A
C
IT
Y, O
K
LA
H O
M A
SI
TE
SI
TE
SI
TE
Not to Scale elevators stairs stairs re st ro o m s
Office
Office
Office
Rm 206
O K
-7
3-
U
IL
D
IN
G
Rm 207 Rm 208 Rm 209
Rm 210
Rm 211
Rm 213Rm 214
Rm 215Rm 216 Office
Office
Legend
Rm 212
Rm 205
Rm 204
Rm 202
Rm 203A
R m
B Rm203C Rm 203D
Rm 201
Rm 201A
Rm 201E
Rm 201D
Rm 201C
Rm 201B
Rm 201G
Rm 201F
Rm 201JRm 201IRm 201H
Office
Rm 218 Rm 218A Rm 218D
R m
Rm 218B Rm 218C
Rm 218O Rm 218M
Rm 218P
Rm 218K
Rm 218J
Rm 218L
Rm 218R
Rm 218N
Rm 218Q Rm 218I
6 - Tan door frames on the 2nd floor
7 -
8 -
White walls on the 2nd floor
Gray door frames on the 2nd floor
06-01 06-0207-01
07-02
08-01
08-02
01-0101-02
02-01
02-02
03-01
03-02
04-02 04-01
05-01
05-02
06-01
Legend
1 - Beige - outside of hangar doors
2 - Light brown interior doors/doorframes
3 - Dark brown doors/doorframes
4 - Off-white - interior of hangar doors
5 - Gray doors/doorframes
6 - Blue doors/doorframes
P
S
IT
IV
E
L B
P L
O C
A T
IO
N
M A
P
FI
G U
R E
P R
EP
A
R
ED
B Y
A P
P R
O V
ED
B
Y
D A
TE
JO
B
N O
EE
F
AL
A
AP
R
IL
L A
H O
M A
A
IR
N A
T
IO
N A
L G
U A
LA
H O
M A
C
IT
Y, O
K
LA
H O
M A
SI
TE
SI
TE
SI
TE
Not to Scale elevators stairs stairs re st ro o m s
Office
Office
Office
Rm 206
O K
-7
3-
IL
D
IN
G
Rm 207 Rm 208 Rm 209
Rm 210
Rm 211
Rm 213Rm 214
Rm 215Rm 216 Office
Office
Legend
Rm 212
Rm 205
Rm 204
Rm 202
Rm 203A
R m
B Rm203C Rm 203D
Rm 201
Rm 201A
Rm 201E
Rm 201D
Rm 201C
Rm 201B
Rm 201G
Rm 201F
Rm 201JRm 201IRm 201H
Office
Rm 218 Rm 218A Rm 218D
R m
Rm 218B Rm 218C
Rm 218O Rm 218M
Rm 218P
Rm 218K
Rm 218J
Rm 218L
Rm 218R
Rm 218N
Rm 218Q Rm 218I
6 - Tan door frames on the 2nd floor
7 -
8 -
White walls on the 2nd floor
Gray door frames on the 2nd floor
06-01 06-0207-01
07-02
08-01
08-02
Legend
All painted surfaces (on hangar doors, doors, and door frames) contain levels of lead
Acct. No.:
Project: OKANG Building 1013
Location:
Project No.:
QuanTEM Set ID: 292464
Date Received: 03/28/18
Received By: Amber Bassett
Date Sampled:
Time Sampled:
Date of Report: 04/05/18
A615
Oklahoma City, OK
NA
Matrix Parameter Results Units MethodClient ID
QuanTEM
ID
Reporting
Limits
Date/Time
Analyzed
Environmental Chemistry Analysis Report
Client: Guernsey
5555 North Grand Blvd., Ste 300
Oklahoma City, OK 73112
Analyst: CR
AIHA ID: 101352
Lead 6,130 93.5 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-01-01
Lead 1,750 72.5 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-01-02
Lead 233 117 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-02-01
Lead 752 50 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-02-02
Lead 98.0 50 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-03-01
Lead 1,640 131 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-03-02
Lead 139 49.4 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-04-01
Lead 14,000 49.1 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-04-02
Lead 1,820 136 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-05-01
Note: Sample results have not been corrected for blank values.
This report applies only to the standards or procedures indicated and to the specific samples tested. It is not indicative of the qualities of apparently identical or similar products or procedures, nor does it represent an ongoing assurance program unless so noted. These reports are for the exclusive use of the client and are not to be reproduced without specific written permission. QuanTEM is not responsible for user-supplied data used in calculations.
Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis.
Wipe materials must meet ASTM E1792 criteria. Method detection limits and resultant reporting limits may not be valid for non-ASTM E1792 wipe material.
EPA Method 7000B (1) = EPA 600/R-93/200 Preparation Modified. EPA 7000B Analysis Modified
EPA Method 7082 (2) = EPA 600/R-93/200 Preparation Modified. EPA 7082 Analysis Modified
Acct. No.:
Project: OKANG Building 1013
Location:
Project No.:
QuanTEM Set ID: 292464
Date Received: 03/28/18
Received By: Amber Bassett
Date Sampled:
Time Sampled:
Date of Report: 04/05/18
A615
Oklahoma City, OK
NA
Matrix Parameter Results Units MethodClient ID
QuanTEM
ID
Reporting
Limits
Date/Time
Analyzed
Environmental Chemistry Analysis Report
Client: Guernsey
5555 North Grand Blvd., Ste 300
Oklahoma City, OK 73112
Analyst: CR
AIHA ID: 101352
Lead <327 327 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-05-02
Lead <323 323 ppm 04/05/18 14:58 P EPA 7000B (1)PaintOKANG-
LBP-06-01
Authorized Signature:_______________________________________________
Cherry Rossen, Technical Manager
Note: Sample results have not been corrected for blank values.
This report applies only to the standards or procedures indicated and to the specific samples tested. It is not indicative of the qualities of apparently identical or similar products or procedures, nor does it represent an ongoing assurance program unless so noted. These reports are for the exclusive use of the client and are not to be reproduced without specific written permission. QuanTEM is not responsible for user-supplied data used in calculations.
Unless otherwise noted, upon receipt the condition of the sample was acceptable for analysis.
Wipe materials must meet ASTM E1792 criteria. Method detection limits and resultant reporting limits may not be valid for non-ASTM E1792 wipe material.
EPA Method 7000B (1) = EPA 600/R-93/200 Preparation Modified. EPA 7000B Analysis Modified
EPA Method 7082 (2) = EPA 600/R-93/200 Preparation Modified. EPA 7082 Analysis Modified
Supplemental Report
QAQC Results
QA ID: 16157 Date: 4/5/2018
Test: Lead
Notes:
Matrix: Paint Approved By: Cherry Rossen
Date Approved: 4/5/2018
Blank Data:
Duplicate Data:
Recovery Data:
Standards Data:
Lab Number: 292464
Type of Blank Blank Value
0FCB
0ICB
0Matrix Blank 1
0Matrix Blank 2
Sample Number Result Duplicate % RPD
3.9363.760 4.6292610-004
Sample Number Result Spike Level Result +
Spike
Dup. Result +
Spike
% Spike RPD% Recovery % Dup.
Recovery
2.012 2.0790.000 1.783103.3 88.6 15.3LCS-P1
2.022 2.0490.000 2.231101.3 110.4 8.5LCS-P2
2.000 5.4733.760 85.7292610-004
2.000 6.4064.585 91.0292558-021
Standard Low Limit Obtained High Limit
4.5 5.55.1CCV
4.5 5.54.9FCV
0.9 1.11.1ICV
0.05 0.150.09RLVS
Authorized Signature:_______________________________________________
Cherry Rossen, Technical Manager
September 6, 2019
Lt. Col. David McCormack Oklahoma Air National Guard 3535 Military Circle Oklahoma City, OK 73111
RE: Lead-Based Paint Sampling at Building 1013, Oklahoma Air National Guard, Oklahoma City, Oklahoma County, Oklahoma
Lt. Col. McCormack:
INTRODUCTION
Guernsey was tasked by the Oklahoma Air National Guard (OKANG) to collect Lead-Based Paint (LBP) samples from trusses, roof joists, overhead door and columns/cross beams in Building 1013 located at the Air National Guard in Oklahoma City, Oklahoma County, Oklahoma. Roof joists were not accessible; however, the paint had the same color, texture, and installation date as the trusses, making it the same homogeneous area. Guernsey professionals performed the sampling on August 27, 2019.
The LBP inspection employed destructive techniques to sample suspected LBP. Paint chip samples were collected from the trusses, roof joists, overhead door and columns/cross beams.
Based upon the LBP analytical results, all off-white painted (with red undercoat) trusses, off-white painted roof joists, brown painted overhead door and off-white painted (with red undercoat) columns/cross beams contain levels of lead. Three of the painted surfaces (off-white with red undercoat – trusses, columns/cross beams, and roof joists) had lead levels above the EPA action level of 5,000 parts per million (ppm).
It is recommended that all paint remain on the trusses, roof joists, doors and columns/cross beams and disposed as construction debris. In the event paint is stripped from the trusses, roof joists, overhead doors and columns/cross beams, proper protocols should be followed for removal and disposal.
Lead-Based Paint Sampling at Building 1013
FIELD ACTIVITIES
In performing the LBP inspection, Guernsey used recognized EPA and the Department of Housing and Urban Development (HUD) protocols in the classification and collection of samples from suspected LBP. The types of structures that are covered under HUD are public housing, federally-owned housing, housing receiving federal assistance, and child-occupied facilities.
Since Building 1013 is an airplane maintenance hangar, it does not fall under the HUD rules.
However, should construction/demolition and debris handling/disposal activities occur, such activities must be performed in accordance with OSHA’s Construction Standards and EPA’s Resource Conservation and Recovery Act (RCRA) regulations.
Initially, suspect LBP was grouped into homogeneous areas. Homogeneous areas are those which appear similar throughout in terms of color, texture, date of material application and use.
Delineation of homogeneous areas was accomplished through a thorough inspection process.
The delineation was accomplished through a visual inspection of the structure for suspect materials. Additionally, the physical condition, location, amount (e.g. square feet) of suspect LBP was noted. Based on the above criteria, random bulk samples were collected.
A total of three homogeneous areas of suspect LBP were identified. Once these areas were identified, representative samples of each homogeneous area were obtained for laboratory analysis. Figure 1 provides a layout of Building 1013 with LBP sampling locations identified.
During the bulk LBP inspection, each sample was assigned a unique identification number and placed in containers for transport to a laboratory for analysis. Each sample was identified by a seven-character code which was divided into three segments (LBP-01-01):
• The first set of digits is the type of sample (LBP)
• The second set of digits is the homogeneous area number (01)
• The last two digits are sequential sample numbers within the homogeneous area (01)
All samples were transported under a Chain of Custody (COC) to the laboratory to maintain sample integrity. COC documentation is enclosed.
FINDINGS
A total of 11 bulk samples of suspect LBP were collected during the LBP inspection and submitted for laboratory analysis. Applicable regulations require that if any one sample from a homogeneous area tests positive for lead, the entire homogeneous area must be treated as LBP. Table 1 summarizes the analytical data for the LBP samples collected. Based upon the LBP analytical results, all painted surfaces on the off-white with red undercoat trusses, off-white roof joists, brown overhead doors and off-white with red undercoat columns/cross beams contain levels of lead.
Three of the painted surfaces (off-white with red undercoat – trusses, columns/cross beams, and
Lead-Based Paint Sampling at Building 1013 roof joists) had lead levels above the EPA action level of 5,000 parts per million (ppm). Figure 2 provides a layout of Building 1013 with positive LBP locations.
RECOMMENDATIONS
It is recommended that all paint remain on the trusses, roof joists, overhead doors and columns/cross beams and disposed as construction debris. In the event paint is stripped from the trusses, roof joists, overhead doors and columns/cross beams, proper protocols should be followed for removal and disposal.
Should you have any questions or comments please contact me by phone at 405.416.8294, by cell at 405.850.6443, or by e-mail at angela.aikman@guernsey.us.
Sincerely, Guernsey
Angela Aikman, CIE Project Manager/Environmental Scientist
Cc: Mr. Weston McCann, Guernsey
Enclosed:
Table Figures Analytical results and chain-of-custody from Quantem mailto:angela.aikman@guernsey.us
Table 1 Summary of LBP Analytical Results
Oklahoma Air National Guard – Building 1013 Oklahoma City, Oklahoma
Sample Number Description Detection of Lead (EPA Action Level
5,000 parts per million [ppm])
LBP-01-01 Off white with red undercoat on trusses 1,200
LBP-01-02 Off white with red undercoat on trusses 29,000
LBP-01-03 Off white with red undercoat on trusses 6,100
LBP-01-04 Off white with red undercoat on trusses 8,800
LBP-02-01 Off white red undercoat on columns 93,000
LBP-02-02 Off white red undercoat on columns 65,000
LBP-02-03 Off white with red undercoat on cross beams 6,000
LBP-02-04 Off white red undercoat on columns 17,000
LBP-02-05 Off white red undercoat on columns 39,000
LBP-03-01 Brown on overhead door <50 LBP-03-02 Brown on overhead door <50
* Bold values are greater than the EPA action level
P S
A M
P L
E L
O C
A T
IO
N
M A
P
FI
G U
R E
P R
EP
A
R
ED
B Y
A P
P R
O V
ED
B
Y
D A
TE
JO
B
N O
M
JE AL
A
Se pt em be r 2
L A
H O
M A
A
IR
N A
T
IO
N A
L G
U A
LA
H O
M A
C
IT
Y, O
K
LA
H O
M A
SI
TE
SI
TE
SI
TE
Not to Scale elevators stairs stairs re st ro o m s
Office
Office
Office
Rm 206
O K
-7
3-
IL
D
IN
G
Rm 207 Rm 208 Rm 209
Rm 210
Rm 211
Rm 213Rm 214
Rm 215Rm 216 Office
Office
Legend
Rm 212
Rm 205
Rm 204
Rm 202
Rm 203A
R m
B Rm203C Rm 203D
Rm 201
Rm 201A
Rm 201E
Rm 201D
Rm 201C
Rm 201B
Rm 201G
Rm 201F
Rm 201JRm 201IRm 201H
Office
Rm 218 Rm 218A Rm 218D
R m
Rm 218B Rm 218C
Rm 218O Rm 218M
Rm 218P
Rm 218K
Rm 218J
Rm 218L
Rm 218R
Rm 218N
Rm 218Q Rm 218I
6 - Tan door frames on the 2nd floor
7 -
8 -
White walls on the 2nd floor
Gray door frames on the 2nd floor
06-01 06-0207-01
07-02
08-01
08-02
01-0101-03
02-01 03-01
03-02
Legend
1 - Off-white with red undercoat - trusses
2 - Off-white with red undercoat - columns/cross beams
3 - Brown - overhead door
01-02
01-04
02-04
02-03
02-03
02-05
P
S
IT
IV
E
L B
P L
O C
A T
IO
N
M A
P
FI
G U
R E
P R
EP
A
R
ED
B Y
A P
P R
O V
ED
B
Y
D A
TE
JO
B
N O
M
JE AL
A
SE
PT
EM
BE
R
L A
H O
M A
A
IR
N A
T
IO
N A
L G
U A
LA
H O
M A
C
IT
Y, O
K
LA
H O
M A
SI
TE
SI
TE
SI
TE
Not to Scale elevators stairs stairs re st ro o m s
Office
Office
Office
Rm 206
O K
-7
3-
IL
D
IN
G
Rm 207 Rm 208 Rm 209
Rm 210
Rm 211
Rm 213Rm 214
Rm 215Rm 216 Office
Office
Legend
Rm 212
Rm 205
Rm 204
Rm 202
Rm 203A
R m
B Rm203C Rm 203D
Rm 201
Rm 201A
Rm 201E
Rm 201D
Rm 201C
Rm 201B
Rm 201G
Rm 201F
Rm 201JRm 201IRm 201H
Office
Rm 218 Rm 218A Rm 218D
R m
Rm 218B Rm 218C
Rm 218O Rm 218M
Rm 218P
Rm 218K
Rm 218J
Rm 218L
Rm 218R
Rm 218N
Rm 218Q Rm 218I
6 - Tan door frames on the 2nd floor
7 -
8 -
White walls on the 2nd floor
Gray door frames on the 2nd floor
06-01 06-0207-01
07-02
08-01
08-02
Legend
All painted surfaces (on trusses, roof joists, overhead doors, and columns/cross beams) contain levels of lead
02 83 00.1 Attachment02 83 00.1 Attachment
02 83 00.1 Attachment02 83 00.1 Attachment
| R18_70157-003_E |
| E-601 - ONE-LINE & SCHEDULES |
02 83 00.1 Lead Based Paint Sampling Report
File details come from the government source that posted it. Updated .